HomeMy WebLinkAbout06-08-1977 Called Meeting
MINUTES - CALLED MEETING
OF THE
" PLANNING AND ZONING COMMISSION, LA PORTE,. TEXAS
JUNE 8, 1977
7:00 P.M.
MEMBERS OF THE COMMISSION PRESENT: Charles Christensen,
Chairman; W. R. Shedelbower, Eugene Ybarra.
MEMBERS OF THE COMMISSION ASSENT: J. C. Hebert, Kerry Beverly.
OTHERS PRESENT: Eddie Gray and Mineola Walker.
PRESIDING: Charles Christensen, Chairman.
+ + +
~~ 1. CALL TO ORDER - The meeting was called to order at 7:10 P.M.
by Chairman Christensen.
T '~"
~Z. CONSIDER APPROVING F_~'~•I_MINARY PLAT OF FAIRMONT PARK, SECTION 4.
Mr. Gray was present to answer any questions concerning the
- preliminary- piat- of- ~a~ wont Park,- Section 4 . R. Shedelbower
raised the question concerning the dedication of a park site.
A letter from the president of the Fairmont Park Homes
.Association was submitted and read. Motion by Eugene Ybarra,
seconded by R. Shedel~=:er to approve the preliminary plot
plan for Section 4 of Fairmont Park subject to agreement
concerning new park ordinance. Motion carried.
~3G~ D
~~rT!~JI~I?. ~L C(ZT ?'l~ ?U~ .
_ _ _ .. _ ~ .. ~. ~ -.a
~-- .... ., ... - N ;.
.,~ , ~~ ~.: .. - ~ ... -: is .,
.- -.i. ,. - .-. l .
DEPARTfNIE~OF TRANSPORTATION ~ -
- FEDERAL AVIATION ADMINISTRATION "
- June 23, 1977 SOUTHWES'P REGION r~ A~~
Houston Airports District Office o~.~ ~~,
' 8800 Paul B. Koonce Drive, Room_225 ~ '~ z
* t_
-~~ _ Houston, Texas .77061
~0 2
o
~ - ~~klSta~~\
.~ -
f
Mr, Knox W. Askins
___.'~ City Attorney
City of La Porte ~ -
-- P. 0. Box 1218 _
- La Porte, Texas J7571 ,
~~ -- - Dear Mr, Askins:~ _ - -
,.. _ -
r.
.. ,,_ -
'~ ~In reply to your, letter of May 31, 1977, regarding the zoning ordinance
. I for La .Porte Municipal Airport, we find that several-changes will be
- necessary to meet the requirements of Special Condition No. 20 of the
-.Grant Agreement for Project No. 5-48-0127-02,
- Part 77, of the Federal Aviation Regulations, has been ohanged since
`'''f - the original zoning ordinance was passed by the La Porte-Harris County
_ ~ Joint Zoning Board in 1957, and the area covered by that ordinance
_ ':~ is no longer-the area that now should be covered. The airport is
zoned for VFR operations and one runway should be zoned for future
--1 IFR operations. _ ~ -
'~ _ You should have your engineer draw a new zoning map, and a rrew Joint
_ _ Zoning Board should be forned at an early date to bring in the City
_ of Lomax. The civil airport imaginary surfaces are described in ,
paragraph 77,25, page 6, and depicted on page 19 of FAR Part 77, copy
of which is enclosed.
-..
_ We are also enclosing "instructions and Sample Documents for Preparation
of Airport-Zoning" as .well. as a copy of Advisory_Circular 1505190-3A,
Model Airport Hazard Zoning Ordinance. These brochures should be
helpful to you.... --
If you have any questions, please contact our office.
. Sincerely, - -
• _ ~ u----
' "--• ,~„-WILLIAM N. DALE
- .Chief, Houston Airports District Office
Enclosures '
_ _ - -_- _ -
_ _ -
. - - = .. -
-
.' ,
- -
-_. .-
i .
d----p--- • •
BUSCH, HUTCHISON & rn,SSOCIATES, iNC. CONSVLTING CNGINCf, f+S
1167 FLECTW 000 DRIVE - BAY TO WN, TCXAS 77520 - pHONC j713j 1221/213
~ly 1, y1977
ESTI".ATE "J~;3ER: One (1) -June 13, 1977 through June 30, 1977
Construction of Sanitary Se~rers, GJater Lines And Appurten~rces
PROJtiCT: C;tv of La ?orte - In Sl,~c':cs 45 and 72 -Job No. 77-1494
CO^JTR;C?'~~.: IKE H",i~L, I^?C. , P. 0. Box 619. Friendswcod TX 77546
A~"OC`••,T GF CONTRACT: X37.812.59 _ CONSTRUCTION TI~~1E:
t,-_
~ 1 ;, x,71
'o. ~ Item ; uantit Unit Unit Price Total
1. F8" V.C. San;~ary Sewer R.G.
~'o i nts , 6' -8' Cut,
~Co.",oiete in lace 50 L.F. - 5.87 293.50
~ 2. Vic" V.C. Sanitary Sewer, -
R.G. Uoints, 0'-5' Cut, I
!~c•~clete in place I 580 L.F. I 4.10 2,378.00 '
i
3. ~6" C.I.-Sanitary Se~•rer
:Class 22, A;:~~JA Specification I
~C-106, 0'-6' Cut, as shown on ~ ~ {
i plans, Cc;~plete in place 18 ,L.F. 10.45 ( 188.10
4. ~ San i tary Se~•,er I~'a nhol e
~~o~~lcte in place ~ - 0 - Each 600.00 - 0 -
~ 5. + SGr,i Lary Se~,:er Cl ear.out
~Cor:pe~e in place - 0 -I Each~
- 75.00 ~ - 0 -
j
I 6. i6" Class 150, Asbestos Ce:;:ent --
~'-'ater Line, Open trench con- ~
~struction, Co~~~lete in Dlace 1,700 L.F. 7.41 12,597.00 ;
i
7. 8">:3~'x6" Tappi r:g S1 eeve and
;'alve with Valve Box,
Cc~~~aiete in lace 3 Each 613.98 1,841.94
8. o"x6"x6" Tapping Sleeve and
;naive i~rith Valve Box,
'C~•-~l~te in place ~ 2 Each 589.38 1,178.76
9. 5" Gate Valve Yrith Valve Eox, F
Cc~~~~le~? in place 3 Each 592.43 1,777.2
•
.._. .. r .
_ ~. :.,
..__
f•
,w
' ~e T~~o - Clty of La PorTte -Job No. 77-1494 - IKE }'ALL, INC. CONTRACTOR- EstiTate too. I
:tem i
rdo. ~ Item uantit !Unit Unit Price Total
.I .
10. i6"x6"x6" C.I. Tee,
-
•
t~o~>>nl ete i n 1 ace 2 ~ Each 182.58 365.16
,
11. `6" C.I. 90° Bend,
Co ~e i ete i n 1 ace { - 0 -Each 132.15 - 0 -
12. i
mire Hydrant, 4' Bury,
~~aith "Hydrolok" Connector
,
~'Com lete in lace
2 i
Each
676.42
1,352.84
,, ~
13. i6" C.I. Plug vrith Ears and
l5olts, Comalete in place 1 Each .45.00 45.00
14. Road Shell or Limestone for-
ad h uider and drivev~a
ro so y
~
repair (Delivery Ticket 3asis},~
iCo~?alete in place I 98.5 t C.Y. 18.00 I 1,773.00 ,
15. ii
~Rzmove existing concrete I ~ ~ ~
dr i vetivays and replace U1i th 4" ~ ~ i
;reinforced concrete pave~,~ent,
~ ~Co~alete in place ~ 15 , S.Y. 35.00 525.00
16. 1Timber ordered left in Trench ~ 1000
by engineer i -
- 0 ; Bd~t 1.00 - 0 - ;
17, j8" l'.C. Sanitary Se~~rer, ,
~R,G. ~oi.nts, 0''-6' Cut, !!
Co-,plzte in lace 650 i L.F.~ 5.98 3,837.00
18.
~ 8" C.I. Sanitary Se~,~er
f
~
~ ~ '.fiery
C1 ass L2, Ati.~.-~ Speci-~i cati on
(( •
I C-10o", 0''-6' Cut, as sho~:rn 4
on ~?l:Gns, Co~~olete i.n lace 18 L.F.. 11.45 I _ 20G.10
T07AL WORK COMPLETED
fi
f
$28,408.69
•
{ fi -. _. _. _- _..
Pay 90 Of $.28,408.69 = $ 25,567.83
• ~ Les's Previous Pa,yi,~ents = - 0 -
PAY THIS A"rOUNT --~~ 25 83
u
lti'ork Dav ,analysis
Cor~ractor's first day of work - June 13, 1977
Inclement titi~eather days in June ....... 0 ._
July .......
August .....
September ..
TOTAL 0
Total ~,,~ork days since start -------- 13
Days-lost due to incler~~ent weather - 0
Days actua]ly worked 13
Days left for completion - 90 - 13 = 77
Progress
• ;umber of days charged: 13 = 15 q
tcrk perforr.ed to date: $2~08.~~ = 76 q
Position
61 % or 55 days ahead
~~
A. J. Busch, Jr., P.E.
AJB/sh