HomeMy WebLinkAbout07-17-08 Regular Meeting and Public Hearings of the La Porte Planning and Zoning Commission
Oath of Office
ti'
b
OATH OF
OFFICE
I , do solemnly swear (or affirm), that I will faithfully execute
the duties of the office of , of the City of La
Porte, State of Texas, and will to the best of my ability preserve, protect and defend the
constitution and laws of the United States and of this State and the Charter and
ordinances of this City; and I furthermore solemnly swear (or affirm) that I have not
directly or indirectly paid, offered, or promised to contribute any money, or valuable
thing, or promised any public office or employment, as a reward to secure my
appointment or the confirmation thereof. So help me God.
Sworn to and subscribed before me this day of 2008.
Notary Public in and for the
State of Texas
q
p
Minutes of the Meeting
PLANNING AND ZONING COMMISSION
MINUTES OF JULY 17, 2008
Members Present:
Pat Muston, Dottie Kaminski, Doretta Finch, Nick Barrera, Paul Berner, and Hal Lawler
(Alt 1)
Members Absent:
Kirby Linscomb, Jr. Claude Meharg and Les Bird (A It 2)
c~ ~aff Present:
Planning Director, Tim Tieljens; City Planner, Masood Malik; Assistant City Attorney,
Clark Askins; Chief Building Official, Debbie Wilmore, Inspection Services Coordinator,
Sherry Jennings.
Others Present:
Numerous citizens
1. CALL TO ORDER.
Meeting called to order by Chairperson Muston at 6:00 p.m.
2. CONSIDER APPROVAL OF JUNE 19, 2008, MEETING MINUTES.
Motion by Dottie Kqminski to approve the Minutes of June 19, 2008. Second by Paul Berner. The
motion carried.
Ayes:
Nays:
Abstain:
Kaminski, Berner, Finch, Barrera, Lawler, and Muston
None
None
3. OPEN PUBLIC HEARING TO RECEIVE CITIZEN INPUT ON SPECIAL CONDITIONAL USE PERMIT
REQUEST #SCU08-005 FOR 10.64 ACRES OF LAND BEING RESERVE "0" OUT OF 206.990
ACRES OF LAND LOCATED SOUTH OF STATE HIGHWAY 225 ALONG OLD UNDERWOOD
ROAD, IN THE ENOCH BRINSON SURVEY, ABSTRACT 5, LA PORTE, HARRIS COUNTY, TEXAS
AS REQUESTED BY CLAY DEVELOPMENT AND CONSTRUCTION, INC., FOR DEVELOPMENT OF
AN OFFICE WAREHOUSE FACILITY (PACKWELL II) WITHIN THE UNDERWOOD BUSINESS
PARK.
Chairperson Muston opened the public hearing at 6:03 p.m.
A. STAFF PRESENTATION
Staffs Report was presented by Masood Malik, City Planner. The applicant, Clay Development,
has requested a Special Conditional Use Permit' (SCUP) for developing an office/warehouse
facility for Packwellll within the Underwood Business Park located south of State Highway 225.
Public notices were mailed to four property owners located within 200' from the subject
property. The City did not receive any responses from the maHout.
B. PROPONENTS
No one spoke in favor of the request.
C. .OPPONENTS
No one spoke in opposition to the request.
Planning and Zoning Commission
Minutes of July 17, 2008
Page 2 of 7
4. CLOSE PUBLIC HEARING
Chairperson Muston closed the public hearing at 6:07 p.m.
5. CONSIDER RECOMMENDATION TO CITY COUNCIL REGARDING SPECIAL CONDITIONAL USE
PERMIT REQUEST #SCUOS-OOS.
Motion by Paul Berner to recommend to City Council approval of Special Conditional Use Permit
Request #SCU08-00S with the following conditions:
· This SCUP outlines, in general terms, the proposed Planned Unit Development. The developer
recognizes and understands that any future construction or development of the private or public
improvements anticipated by this SCUP and General Plan shall require further submittal and
approval of plats, site plans, construction drawings, engineering analysis, and covenants.
· Provide on-site improvements, loading and unloading ramps/bays that adequately handle the
volume associated with this office and warehousing facility.
· Hazardous or non-hazardous material storage, chemicals, nature, type and fire requirements should
be specified.
· Design of maneuvering isles and driveways criteria shall be followed. Fire truck access, fire
suppression requirements, and fire hydrant placement shall be specified on the development site
plan.
· A site plan and/or separate plans shall be submitted in conjunction with the building permit
application. Landscaping is required in percentages specified in Section 106-522 of the Code of
Ordinances.
· Amount and type of landscaping shall be specified on the plan. Provide an irrigation system to
ensure that all landscaping is properly maintained by the owner/developer.
· The Developer shall comply with all other applicable laws and ordinances of the City of La Porte
and the State of Texas.
Second by Doretta Finch. The motion carried.
Ayes:
Nays:
Abstain:
Berner, Kaminski, Barrera, Finch, Lawler and Muston.
None
None
6. OPEN PUBLIC HEARING TO CONSIDER REZONE REQUEST #ROS-001 FOR 21.2S9 ACRES OF
LAND LOCATED AT 1241 UNDERWOOD ROAD, FURTHER DESCRIBED AS LOTS 367, 36S, 369,
369A, AND 370, LA PORTE OUTLOTS, ENOCH BRINSON SURVEY, ABSTRACT 5, CITY OF LA
PORTE, HARRIS COUNTY, TEXAS. THE APPLICANT, SWINC ACQUISITION, INC., SEEKS TO
REZONE THE PROPERTY FROM GENERAL COMMERCIAL (GC) AND LARGE LOT RESIDENTIAL
(LL) TO PLANNED UNIT DEVELOPMENT (PUD).
Chairperson Muston opened the public hearing at 6:08 p.m.
A. STAFF PRESENTATION
Staffs Report was presented by Mr. Malik. The applicant, SWINC Acquisition, Inc. c/o Marcus
Deal has requested a zone change for 21.289 acres located at 1241 Underwood for the
purpose of expanding a business by utilizing the property to its fullest extent.
Public notices were mailed to 12 property owners located within 200' from the subject property.
The City did not receive any responses from the mailout.
Planning and Zoning Commission
Minutes of July 17, 2008
Page 3 of 7
B. PROPONENTS
Marcus Deal spoke on behalf of SWINC, Acquisition, Inc. He spoke of the improvements that
have been made, including landscaping and painting of the building. The property will be used
as a laydown yard for storage of pipe.
Delecia Turner, 9919 North P Street and 10105 North P Street stated she purchased 32 ac, and
subdivided into four parcels. She noted that Shaw had been a good neighbor, but she prefers
the open air compared to landscaping blowing in the breeze.
C. OPPONENTS
Denny Beecham, 9823 North P Street had concerns about possible noise from grinding and
welding and at what times the noise might occur. Items also discussed were the fence
(screening) and detention. He stated the wind blows the fence and then requires repair.
Flooding issues are a concern. He stated 5-6 years ago a zone change was requested and was
denied. He feels his life and property value have been degraded.
7. CLOSE PUBLIC HEARING
Chairperson Muston closed the public hearing at 6:45 p.m.
8. CONSIDER RECOMMENDATION TO CITY COUNCIL REGARDING REZONE REQUEST #R08-001.
The Commission discussed the request.
Debbie Wilmore, Chief Building Official, reported there have been code enforcement violations
at this location. She has visited the site with Mr. Deal and any violations were immediately corrected.
Motion by Paul Berner to recommend to City Council approval of R#08-001. Second by Nick Barrera.
The motion carried.
Ayes:
Nays:
Abstain:
Kaminski, Berner, Finch, Barrera, Lawler and Muston.
None
None
9. OPEN PUBLIC HEARING TO RECEIVE CITIZEN INPUT ON SPECIAL CONDITIONAL USE PERMIT
REQUEST #SCU08-004 FOR 21.289 ACRES OF LAND LOCATED AT 1241 UNDERWOOD ROAD,
FURTHER DESCRIBED AS LOTS 367, 368, 369, 369A, AND 370, LA PORTE OUTLOTS, ENOCH
BRINSON SURVEY, ABSTRACT 5, CITY OF LA PORTE, HARRIS COUNTY, TEXAS. THE
APPLICANT, SWINC ACQUISITION, INC., SEEKS A PERMIT TO ACCOMMODATE EXPANSION OF
THE BUSINESS BY UTILIZING THE ENTIRE PROPERTY TO ITS FULLEST EXTENT.
Chairperson Muston opened the Public hearing at 6:50 p.m.
A. STAFF PRESENTATION
Staff's Report was presented by Mr. Malik. The applicant, SWINC Acquisition, Inc. has requested a
special conditional use permit to expand the business at 1241 Underwood Road by utilizing the
property to its fullest extent.
B. PROPONENTS
Mr. Deal spoke on behalf of the company.
Planning and Zoning Commission
Minutes of July 17, 2008
Page 4 of 7
Patricia Clark, 3817 Ashwood, inquired if the building is air conditioned and/or insulated and if they
worked with their doors open.
C. OPPONENTS
Danny Beecham had concerns about flooding. His property abuts this business. He stated they do
work with their doors open and sometimes they work 24 hours.
10. CLOSE PUBLIC HEARING
Chairperson Muston closed the public hearing at 7:38 p.m.
11. CONSIDER RECOMMEDA TION TO CITY COUNCIL REGARDING SPECIAL CONDITIONAL USE
PERMIT REQUEST #SCU08-004.
Motion by Dottie Kaminski to recommend to City Council approval of Special Conditional Use Permit
Request #SCU08-004 with the following conditions:
· Planned Unit Development (PUD) status shall allow light industrial use consisting of construction,
maintenance, and fabrication activity for a period of twenty (20) years from the date of City Council
approval and may continue with an annual zoning permit issued to extend the use for up to five 1-year
renewals after said 20 year period.
· The long term Land Use Plan, in effect at the end of the said twenty years period plus five 1-year
renewals shall remain the intended use of the PUD property. As a condition of this Special Conditional
Use Permit, the land use shall thereafter conform to the Land Use Plan of the City. Planned Unit
Development (PUD) zone ceases at such time as the land is developed in accordance with the
underlying land uses of the City's Land Use Plan in effect at that time.
· Provide 100' setback from the east and south property line adjacent to residential for buffering
purposes with all other setbacks as required.
· No activity/storage shall be allowed within the setback and any other easements at site.
· Landscaping/screening shall be required as per Section 106-444(a) within said setback areas along
east and south portions of the perimeter adjacent to the residential zoned properties.
· Landscaping shall be maintained by the owners/tenants.
· A front portion of the facility (first 8 acres) shall only operate between hours of 6 a.m. and 10 p.m. Any
construction or equipment use on the remaining 12+ acres shall not be allowed beyond 7 p.m.
· All lighting in the parking lot shall be hooded and arranged to deflect lights away from the nearby
residential properties in compliance with Section 106-521 (a) of the Code of Ordinances.
· Outside storage or lay down yard area shall be improved to a dust free surface.
· All driveway improvements must adhere to the City of La Porte's paving design standards for
commercial/industrial establishments.
· On and off-site drainage whether existing or planned shall have a net zero effect for stormwater runoff
to surrounding areas and mitigate any sheet flow or drainage corridor issues to the satisfaction of the
City Engineer.
· Applicant must submit to the City, a certified site plan for any proposed improvements in accordance
with the requirements of Development Ordinance No. 1444 and in compliance with a Special
Conditional Use Permit approved by City Council.
· Any new signage requires a separate sign permit from the City and shall be of monument type not to
exceed ten feet in height.
· Exterior building design shall be approved by the City.
· The zoning permit shall be required.
· Any new expansion or additional building shall require a special conditional use permit from the
City.
· The Developer shall comply with all applicable laws and ordinances of the City and the State of
Texas.
Second by Doretta Finch. The motion carried.
Planning and Zoning Commission
Minutes of July 17, 2008
Page 5 of 7
Ayes:
Nayes:
Abstain:
Kaminski, Berner, Finch, Barrera, Lawler and Muston
None
None
12. OPEN PUBLIC HEARING TO RECEIVE CITIZEN INPUT ON SPECIAL CONDITIONAL USE PERMIT
REQUEST #SCU08-003 FOR 2.44 ACRES OF LAND, LOTS 1 THRU 32, BLOCK 867, INCLUDING
TR A ABANDONED ALLEY, TOWN OF LA PORTE, JOHNSON HUNTER SURVEY, ABSTRACT 35,
LA PORTE, HARRIS COUNTY, TEXAS. PASTOR KAREN WILHELM C/O THE CHRIST LUTHERN
CHURCH SEEKS A PERMIT FOR THE DEVELOPMENT OF A WOMEN'S RECOVERY CENTER TO
BE LOCATED AT 942 SOUTH 14TH STREET, WHICH IS CLASSIFIED AS A CONDITIONAL USE IN
A LIGHT INDUSTRIAL (L1) ZONE.
Chairperson Muston opened the Public Hearing at 7:48 p.m.
A. STAFF PRESENTATION
Staff's Report was presented by Mr. Malik. The applicant, Pastor Karen Wilhelm has requested
a special conditional use permit to develop a women's recovery facility (three-quarter house) at
942 South 14th St.
Public notices were mailed to seven property owners located within 200' from the subject
property. One response was received in opposition.
B. PROPONENTS
Pastor Karen Wilhelm stated the north portion of the building is used for a child care center.
There is a fire wall between the two businesses which is in compliance with Harris County.
Women residents will be employed, possibly even as a day care worker. There will be an
outside area for the women on the south part of the property. This is considered a three-quarter
house, not a halfway house. These women will be there because they want to be there, not
because it is mandatory they be there.
Marie Meehan stated Pastor Wilhelm had previously run The Bay House for 18 years. This new
business will be held to stricter policies. This would be the next step for women leaving a drug
rehab program. There will be a faith based 12-step program. Background checks will be
performed. The workers are not "certified" and Ms. Meehan will be the Director.
Commissioners inquired if workers would be State licensed, how many will be housed and how
long will they stay. Pastor Wilhelm responded they are not required to be licensed and they will
house 17 women that can stay up to 6 months.
Ms. Meehan stated the women will be required to pay rent. They will have a curfew of 10 p. m.
Some behavior issues are "no tolerance" and could warrant immediate removal from the facility.
Some issues fall under the 3 strike rule- "3 strikes and you are out."
Todd Page stated he is a La Porte resident and a volunteer worker for the Lutheran Church. He
is in recovery and is ecstatic about the possibility of the women's house to be of service to the
people in need.
Theresa Behr was able to go to Mega House and has been with the church. She is very much
in favor of the three-quarter house.
Stacie McNaughten left treatment in March and is not back with her family yet. This will be a
great asset since there are not very many facilities available in the area.
Planning and Zoning Commission
Minutes of July 17, 2008
Page 6 of 7
Diane Campbell works at the Light of Christ and will be working for Light of Hope. She shared
that addiction touches everyone. Light of Hope gives the opportunity to live life differently. In
the program there is very little time for the resident to get into trouble because of the meeting,
work schedule, etc. There are not many other places for women to go to in the area.
Carletta Gonzalez came into the program with training in domestic assault and drug addiction.
She is 9 years sober and has worked with the founder of a mentoring house in Montana. It
gives women the strength to go on.
Drew Paige is a recovering alcoholic and has been sober since 2001. With this disease,
everyone is a taker. This program teaches them to be a giver. They learn how to give and not
expect anything in return. She does not have any official training but was trained on the streets.
Amanda Gonzalez stated the people that will be accepted will already be in a program. They
are not people off the streets. They will already have a sponsor.
C. OPPONENTS
No one spoke in opposition.
Margaret Anderson inquired about where residents go when they are asked to leave. Would they then
become a Police Department problem? Ms. Meehan stated someone would have to pick them up; most
have families.
13. CLOSE PUBLIC HEARING
Chairperson Muston closed the public hearing at 8:27 p.m.
14. CONSIDER RECOMMENDATION TO CITY COUNCIL REGARDING SPECIAL CONDITIONAL USE
PERMIT REQUEST #SCU08-003
Motion by Nick Barrera to recommend to City Council approval of Special Conditional Use Permit
#SCU08-003 with the following conditions:
· This Special Conditional Use Permit is specifically limited for a women's substance abuse recovery
center.
· Owner shall implement admission policy approved by the City, but not less than following:
o Residents shall be disallowed if convicted of any felony offense within three years prior to
application, or if convicted of any sex offense at any time.
o Residents shall not be minors.
· Owner shall implement policies regarding continued residency approved by the City, but not less than
the following:
o Those submitted by the Light of Hope missionary.
o Residents shall not loiter, pan handle or exhibit any disruptive behavior on and off-property.
· A certificate of non-profit organization shall be provided to the City.
· Regular or frequent inspection log should be kept in the building.
· Entrance to the adjoining daycare center should be separate.
· No lounging around the parking and building shall be allowed.
· Any noise level shall be closely monitored.
· Maximum occupancy shall be posted at the building.
· All building modifications under current codes shall be permitted by the City.
· Restriping of the parking lot shall be required and layout plan be submitted to the City to determine
adequate parking.
· Outdoor activities shall not be allowed in the parking areas and on the north side of the building.
· No outside lights or any fixtures/equipment shall be allowed.
· Any new signage requires a separate sign permit from the City.
Planning and Zoning Commission
Minutes of July 17, 2008
Page 7 of 7
. Exterior building design standards, if proposed, shall be approved by the City.
. Landscaping shall be maintained by the applicants/tenants.
· A certificate of occupancy shall be required.
. The Developer shall comply with all applicable laws and ordinances of the City and the State of
Texas.
Second by Paul Berner. The motion carried.
Ayes:
Nayes:
Abstain:
Berner, Kaminski, Barrera, Finch, Lawler and Muston
None
None
Chairperson Muston allowed a comment from Ms. Anderson.
Margaret Anderson, 909 Garden Walk, thanked the Commission for discouraging the Sleep Inn
development. She had concerns of the explosion of hotel/motels in La Porte. She suggested a
moratorium on hotel/motel development for at least one year. With eight motels and two new ones
under construction, La Porte is becoming a motel community. The concept of a bedroom community
held by our forefathers has gone away. She also would like to see 1000' between hotel/motels.
15. ADMINISTRATIVE REPORTS
Mr. Malik reported the SCUP for the hotel was denied on July 14, 2008. The Lakes at Fairmont Greens
is moving forward with the sound wall and fence. The remaining structure at 200 Garfield has been
leveled. Mrs. Wilmore reported they are not quite complete but are close.
16. COMMISON COMMENTS
Chairperson Muston commented how nice 200 Garfield now looks.
17. ADJOURN
Motion by Paul Berner to adjourn. Second by Doretta Finch. Chairperson Muston adjourned the
meeting at 8:34 p.m.
Sher
Inspec ion rvices Coordinator
APR.!"ed.'Jf' this ~ day of ~-t ,2008.
I /" ~!11/ J 1--
f,..t./r v ! ttA-_UrJ-7.-,
Pat Muston
Chairperson, Planning and Zoning Commission
Special Conditional Use Permit
#SCU08-006
Exhibits
A. Commission's Action Request
B. Area Map
C. Staff Report
D. Draft SCUP
E. Site/Sketch Plan
F. Public Notice Response
Special Conditional Use Permit #SCU08-006
Planning and Zoning Commission
August 21, 2008
Location of Proposed Development 100 Block of North 5th Street
Legal Description Approximately 0.35 acre tract of land described as
lots 24-29, Block 55, Town of La Porte, Johnson
Hunter Survey, Abstract 35, La Porte, Harris
County, Texas.
~Iicant Brent Heckendorn for Allen & Kerber
Present Zoning Main Street District (MSD)
Acreage 0.35 acre
Surrounding Zoning North Low-density Residential (R-l)
East Main Street District (MSD)
South Main Street Overlay (MSO)
West Main Street District (MSD)
Land Use Map Commercial
Activity Proposed Off-site Parking
Summary:
· The applicant is requesting a special conditional use permit for a proposed development of off-site parking
for Allen & Kerber Auto Supply at 518 West Main Street.
· Per Section 106-441 of the Code of Ordinances, off-site parking is classified as a Conditional Use.
· The business has grown tremendously over the past years.
· There is not enough space at the primary facility to accommodate on-site parking. In addition, there is no
other reasonable site available nearby this facility.
· Off-site parking will serve as an employee parking and will help to alleviate parking problems associated
with this facility.
· Parking lot will be constructed in compliance with the City's Public Improvement Criteria Manual
(PICM) paving section.
· Landscaping shall be maintained by the owner/developer.
· Traffic impact should be minimal with public services unaffected.
Recommendation:
Staff recommends approval of Special Conditional Use Permit #SCU08-006
with the following conditions:
1. This Special Conditional Use Permit is specifically for off-site parking for 516 & 518 W. Main Street.
2. Parking lot will be constructed in compliance with the City's Public Improvement Criteria Manual
(PICM) for paving.
3. Off-site parking shall comply with all parking design standards.
4. Screening and/or landscaping of parking lot shall be required in accordance with Section 106-444(a)
of the Code of Ordinances.
5. Per Code of Ordinances, exterior building design standards shall be applied to the recently built
facility at 516 W. Main Street.
6. The Developer shall comply with all applicable laws and ordinances of the City and the State of Texas.
Options available to the Commission are:
· Recommend to Council approval of this SCUP.
· Recommend to Council denial of this SCUP.
· Table this item for further consideration by the Commission.
;p"
N
W$Ei
I$";
2'1
, ' ~
.-~ . .. ,
tilll
,;,},., ~
~--
..
...
~..
J ,p:t
~
......'1~~,.
" . -:r ...
.~
..,.
, '
). - - ..
J d
Sa
... .
.a;.
..
,I
Staff Report
August 21, 2008
ReQuest:
ReQuested Bv:
ReQuested For:
Present Zonin2:
ReQuested Use:
Back2:round:
Analvsis:
Off-Site Parking
Allen & Kerber Auto Supply
Special Conditional Use Permit #08-006
Consideration of Special Conditional Use Permit Request #SCU08-006
Allen & Kerber Auto Supply c/o Brent Heckendorn
Approximately 0.35 acre tract of land described as lots 24-29, Block 55,
Town of La Porte, Johnson Hunter Survey, Abstract 35, La Porte, Harris
County, Texas. The primary facility is located at 518 W. Main Street.
Main Street District (MSD)
The applicant is seeking a Special Conditional Use Permit (SCUP) for the
purpose of allowing construction of an off-site parking lot for use by
employees at Allen & Kerber Auto Supply. Off-site parking is classified as
a conditional use per Section 106-441, Table A, Commercial Uses of the
Code of Ordinance (Chapter 106).
Allen & Kerber Auto Supply (NAP A Auto Parts) has been in business over
twenty years in La Porte. The nature of business pertains to the retail of auto
parts, accessories, and other supplies. Over the past years, a number of
employees increased with the tremendous growth of business. Limited
parking is available at this business. It is staff s opinion that appropriate
parking should be provided to keep vehicles from parking on the sides of
the streets in the Main Street District.
The applicant owns this property and has decided to provide parking for its
employees and other workers at this facility. Off-site parking will serve as
auxiliary parking and will help to alleviate parking problems associated with
this development.
The Code of Ordinance Section 106-217 establishes the following review
criteria and conditions for approval of Special Conditional Use Permits:
· That the specific use will be compatible with and not injurious to the use
and enjoyment of the other property, nor significantly diminish or impair
property values within the immediate vicinity.
· That the conditions placed on such use, as specified in each district, have
been met by the applicant.
· That the applicant has agreed to meet any additional conditions imposed,
based on specific site constraints necessary to protect the public interest
and welfare ofthe community.
The tract intended for a parking area is across the street from the auto parts
store. In addition, there is no reasonable location on the existing site and
surrounding area to provide off-site parking.
Off-site Parking
SCU08-006
Page 2 of2
Conclusion!
Recommendations:
Section 106-444, Special Use Performance Standards for off-site parking
addresses the following issues pertaining to the subject use within a
commercial zone.
· Such off-site parking shall comply with all parking standards stated in
the Code of Ordinances and the Public Improvement Criteria Manual.
· Reasonable access from an off-site parking facility to the use served shall
be provided.
· In addition, off-site parking shall be within 300 feet of the use served.
· Should have good access to secondary and primary streets.
As proposed, 34'x125' (4,250 sq. ft.) of concrete parking lot shall be
constructed with concrete with no fence around the property. Access from
off-site parking to the main building appears to be reasonable. It will benefit
the area by moving cars off the street into a proper and adequate parking
. area. If the special conditional use permit is approved by the City, the
applicant must submit a certified site plan for development of the parking lot
showing access, parking spaces, maneuvering aisles, and
landscaping/screening etc.
This site and the proposed use meet the criteria to satisfy applicable
ordinance requirements. This facility and the proposed use are compatible
with the surrounding properties and should not be injurious to the use,
enjoyment or value of surrounding properties
Staff met with the owner to discuss applying exterior building design
standards to the recently completed project (additional building for NAPA
Auto Parts) at 516 W. Main Street. The metal portion needs to be blocked
with a masonry product. The owner is receptive to this idea and shall
implement with the development of a proposed breezeway connecting two
buildings along Main Street.
Staff recommends the approval of Special Conditional Use Permit #SCU08-
006 with the following conditions:
1. This Special Conditional Use Permit is specifically for off-site parking.
2. Parking lot will be constructed in compliance with the City's Public
Improvement Criteria Manual (PICM) for paving.
3. Off-site parking shall comply with all parking design standards.
4. Screening and/or landscaping of parking lot shall be required ill
accordance with Section 106-444(a) of the Code of Ordinances.
5. Per Code of Ordinances, exterior building design standards shall be
applied to the recently built facility at 516 W. Main Street.
6. The Developer shall comply with all applicable laws and ordinances of
the City and the State of Texas.
Options available to the Commission are:
· Recommend to Council approval of this SCUP.
· Recommend to Council denial of this SCUP.
· Table this item for further consideration by the Commission.
Draft
City of La Porte
Special Conditional Use Permit # SCU 08-006
This permit is issued to:
Allen & Kerber Auto Supply c/o Brent Heckendorn
Owner or Agent
516 & 518 West Main Street. La Porte TX 77571
Address
For Development of:
Parkinq Lot (Off-site)
Development Name
100 Block of North 5th Street. La Porte
Address
Legal Description:
Lots 24-29 Block 55. Town of La Porte. Johnson Hunter Survey.
Abstract No. 35. La Porte. Harris County. Texas.
Zoning:
Main Street District (MSD)
Use:
Parkin!:! Lot
Permit Conditions:
1. This Special Conditional Use Permit is specifically for off-site parking for 516 & 518 W. Main Street.
2. Parking lot will be constructed in compliance with the City's Public Improvement Criteria Manual
(PICM) for paving.
3. Off-site parking shall comply with all parking design standards.
4. Screening and/or landscaping of parking lot shall be required in accordance with Section 106-
444(a) of the Code of Ordinances.
5. Per Code of Ordinances, exterior building design standards shall be applied to the recently built
facility at 516 W. Main Street.
6. The Developer shall comply with all applicable laws and ordinances of the City and the State of
Texas.
Failure to begin construction within 12 months after issuance or as scheduled under the terms of a special
conditional use permit shall void the permit as approved, except upon an extension of time granted after
application to the Planning and Zoning Commission.
If construction is terminated after completion of any stage and there is ample evidence that further development is
not contemplated, the ordinance establishing such special conditional use permit may be rescinded by the City
Council, upon its own motion or upon the recommendation of the Planning and Zoning Commission of the City of La
Porte, and the previous zoning of the entire tract shall be in full effect on the portion which is undeveloped.
Validation Date:
Director of Planning
City Secretary
133~lS 419 Hl~ON
'M'O'~
1--------1
I-
I
b
CO
~
b
(0
~
-I
..-...
W
>
C/) ~
W 0
() ---
<C >-
0... ~ w
b C/) .....J
I.{) (9 0 .....J
N Z <C
~ ~ b
~
~ (0
<C ~
0...
b 0'>
0
0'>
--------~
L::~
'<:t
("')
-------
to Consider
A Meeting of the La Porte
Scheduled for
August 21, 2008
(Date of Meeting)
Special Conditional Use Permit#SCU08-006
(Type of Request)
I have received notice of the above referenced public hearing.
I om ill FA VO R of "''2] thj, ,eque" fo' th~following =on" 1-'1
~l:n1AO'j"'Zr ~w.--f',~~ ~?.1 . ~~
Z:Zt;4~~ /~
~/~ ~ /J4:1~
I am OPPOSED to granting this request for the following reasons:
~(J~ J}, ~;j
Address ---"
.L;fhAZ-~ f(:,7?J"j J
City, State, Z.
----
A Meeting of the La Porte
D~@~OW~riI
AUG 1 4 2008 UJj
Scheduled for
By=-
August 21, 2008
(Date of Meeting)
to Consider
.. ST\f"r.i~l C:ondirional Use Permit#SCl}Q~-:-006
.....t-"".....-----..-..---- -.. -.
(Type of Request)
I have received notice of the above referenced public hearing.
I am in FAVOR of granting this request for the following reasons:
1/1 CI ed-f' a..f c:r tfk.J"- .s rtJ/'e:--- 'tl/). /ih R/'/h :'.
fi$)//.a-.IJ' ~P?I//'(' d~/ ddd~ t2'c:/c/r~ /tZ )~
It? 4)/1 yr:.~~ #$L-- k/;~~ 4#4-Lldf./,?'t2../J' ~#9"'/.r
4e'ilzr tZ~~k CP'/?~ef7?C/,/f
/ /
I am OPPOSED to granting this request for the following reasons:
Signature
/'
5/c& ~ ~~:,-
/ d Address
/-/L/t;/'4- rx 77~?/
City, Sta{~, Zip
Special Conditional Use Permit
#SCU08-007
Exhibits
A. Commission's Action Request
B. Area Map
C. Staff Report
D. Draft SCUP
E. Site Plan
F. Public Notice Response
Special Conditional Use Permit #SCU08-007
Planning and Zoning Commission
August 21, 2008
ment
8727 Fairmont Parkwa
5.637 acre tract, out of W. M. Jones Survey,
Abstract No. 482, La Porte, Harris Coun , Texas.
Crai Puccetti, on behalf of Parsons Grou
Medium Densit Residential (R-2
5.637 acres
Low-Density Residential, General Commercial
Residential
Senior Citizen Assisted Livin Center
A licant
Present Zonin
Acreage
Surrounding Zoning
Land Use Plan
Activit Pro osed
Summary:
· Applicant is requesting a Special Conditional Use Permit for a proposed addition to the senior citizen assisted
living facility known as Parsons House, formerly Fairmont House.
· The subject property is located at 8727 Fairmont Parkway adjacent to Brookglen Subdivision.
· As per provision of the previous Special Conditional Use Permit issued for this facility, additional development is
subject to a new Special Conditional Use Permit from the City.
· Previous development was permitted as Intra-district P.U.D. created within Medium Density Residential (R-2)
zoning district, other than Planned Unit Development (PUD) zone.
· Staff recognizes that development of the proposed addition at the current facility may not create a problem but
density and drainage issues need to be considered.
· Commission's fmal consideration is whether granting this request observes the previous determination of Intra-
District P.U.D. classification and spirit of the current ordinances.
· The development is compatible with the surrounding properties.
· The subject request should not be injurious to the health, safety and welfare of the general public.
· The overall impact on public services should be minimal.
Recommendation:
All applicable elements of the Comprehensive Plan were reviewed and incorporated into this development
proposal. If the Commission wishes to consider approval of this Special Conditional Use Permit, staff suggests
following conditions be added:
1. This Special Conditional Use Permit is specifically limited for an additional 41 unit facility at 8727 Fairmont Parkway.
2. No future Special Conditional Use Permit submittal shall hereafter authorize an aggregate total of more than
101 units on the site.
3. The use of this property is limited to senior citizen "assisted living center" as defmed in SIC #8361. A senior
citizen is defmed as a person who is 55 years of age or older.
4. If intra-district P.U.D. remains, covenants shall be submitted for the City's review and approval.
5. An overall density of the assisted living center shall not exceed 17.91 dwelling units per acre.
6. A development site plan shall be reviewed and approved by the City prior to any construction at site.
7. Internal access to the northern portion of the tract shall be provided for by provision ofa private street (min. 24' wide)
8. Adequate provisions are made for fire protection and other utility services to additional building.
9. Outdoor activities shall be restricted to the parking area and concrete pavement on the east and west sides of the building.
10. All lighting in the parking lot shall be hooded and arranged to deflect lights away from the nearby
residential properties in compliance with Section I06-521(a) of the Code of Ordinances.
I I. Any new signage requires a separate sign permit from the City.
12. The roofed-over structures on the property shall not accumulatively exceed the current lot coverage or
maximum (75%).
13. Height of the building shall be the same as existing one.
14. Exterior building design standards shall be approved by the City.
15. Landscaping/screening shall be required as per Section 106-444(a) within said setback areas along east and
west of the perimeter adjacent to the residential zoned properties.
16. Provide landscape buffer along east side of the facility as well.
17. Landscaping shall be maintained by the owner/developer.
18. On and off-site drainage whether existing or planned shall have a net zero effect for storm water runoff to
surrounding areas and mitigate drainage issues at the driveways along Fairmont Parkway.
19. The Developer shall comply with all applicable laws and ordinances of the City and the State of Texas.
Actions required by the Commission:
· Recommend to Council approval of this SCUP with conditions.
· Recommend to Council denial of this SCUP.
· Recommend tabling this SCUP for further review.
Staff Report
August 21, 2008
Request:
Requested Bv:
Requested For:
Present Zonine::
Requested Use:
Back2round:
Parsons House
Special Conditional Use Permit #08-007
Special Conditional Use Permit Request #08-007
Craig Puccetti on behalf of Bob Parsons, Chairman Parsons Group
A 5.637 acre tract of property out of the W. M. Jones survey, Abstract
No.482, La Porte, Harris County, Texas. The property is located at 8727
Fairmont Parkway.
Medium Density Residential (R-2)
Applicant is seeking a Special Conditional Use Permit (SCUP) for the
purpose of constructing a building addition of 41 dwelling units to the
current assisted living facility which contains 60 dwelling units located at
8727 Fairmont Parkway.
Applicant is working towards developing a development site plan for a
proposed addition to the existing facility known as Parsons House (formerly
Fairmont House). The current assisted living facility contains 60 dwelling
units and Parsons Group is proposing an additional 41 units and other
associated internal services that are required to support the growth of the
facility. The addition is being proposed in order to increase the facility's
capacity to house the growing population of the senior citizens.
The Planning and Zoning Commission, at its February 15, 1996, meeting,
conducted a public hearing for the purpose of receiving citizen comments
regarding Special Conditional Use Permit Request #SCU96-001, for the
first phase of the development. After receiving comments and questions,
the Commission suspended the hearing with an intention of reopening it at
the next meeting. At the March 21, 1996, meeting, the request was brought
in an amended form. It was presented as an Intra-District P.U.D. As such,
it required a Special Conditional Use Permit. The need for rezoning,
however, was eliminated.
A Special Conditional Use Permit was approved with the following
additional conditions:
1. Any development beyond the presented plan shall require a separate
Special Conditional Use Permit.
2. No changes, or amendments shall be made to the recorded site plan
and covenants without first obtaining authorization from the City of La
Porte.
3. It should be noted in the Special Conditional Use Permit and in the
deed covenants that the use of this property is limited to a 61 unit
"senior citizen" assisted living center, as defined in SIC #8361. A
senior citizen is defined as a person who is 55 years of age or older.
Parsons House
SCUD8-DD7
Page 2 of 5
Analvsis:
Staff had determined that an intra-district P.U.D. is simply a Planned Unit
Development located in a district zoned something other than P.U.D. When
considering an intra-district P.U.D., adherence to performance standards was
one of the primary concerns.
Using the subject request as an example, the facility has an assigned SIC
Code #8361. This use is listed as conditional in High Density Residential (R-
3) zones and not permitted in R-2 zoning districts. However, the tract in
question is zoned Medium Density Residential (R-2). As an intra-district
P.U.D., the issue was not whether the use is allowed in an R-2 zone, but
rather, will the specific facility conform with performance standards
applicable within R-2 zones.
In addition to performance standards there are a number of development
standards that are specified by the Code of Ordinances. Zoning Ordinance
Section 106-217 establishes the following review criteria and conditions for
approval of Special Conditional Use Permits:
· That the specific use will be compatible with and not injurious to the use
and enjoyment of the other property, nor significantly diminish or impair
property values within the immediate vicinity.
· That the conditions placed on such use, as specified in each district, have
been met by the applicant.
· That the applicant has agreed to meet any additional conditions imposed,
based on specific site constraints necessary to protect the public interest
and welfare of the community.
Land Use - Review of the City's Land Use Plan shows the subject tract is
envisioned as developing for residential uses. The property is abutting a
residential subdivision (Brookglen) in the rear and a commercial tract to the
west along Fairmont Parkway. The proposed use should have minimal
impact on the surrounding properties.
Roadways - The tract in question has primary access along Fairmont
Parkway. The transportation system should adequately accommodate
through traffic and continue to provide for free flow of people, goods and
services. There will be no new driveway added to this facility. The traffic
flow within and between neighborhoods and throughout the community
should not be affected by the proposed development.
Internal roadways within the project area have an improved surface to
twenty four feet in width and are designed to permit the City fire trucks to
provide protection to each building. No portion of this required twenty four
feet fire lane may be used in calculating required off-street parking space or
be used for parking.
Parsons House
SCD08-007
Page 3 of5
Topography - This area is relatively flat and stable and should not be an
obstacle to this type of development.
Density - Based on the current 60 units of the facility and 5.637 acres
available, the overall density equals 10.64 units per acre. This is close to the
10 unit per acre limit established for quadraplex, townhomes, one of the
highest densities permitted for R - 2 uses. The additional 41 units constructed
on the undeveloped portion of the tract would significantly impact overall
density. The net density would be 17.91 units per acre exceeding the current
10 dwelling units per acre for R-2 uses and 14 DU/A permitted for multi-
family development in R-3 zoning districts.
Staff's research shows that the neighboring CItIes use criteria of 18-20
dwelling units per acre for any type of housing for senior citizen that is rent
controlled or rental housing units. In this case, the owner/builder may request
a density allowance to be approved by the Commission and City Council.
Utilities and Drainage - The proposed project shall be served by the City
water and sewer system and fire hydrants shall be installed at such locations
as necessary to provide fire protection. Potable water is readily available.
Water line extension shall be required for the purpose of providing internal
fire protection to the proposed addition. This extension must run north from
the existing valve and will have one or more fire hydrants installed on the
line in compliance with the current fire codes. The water line and fire
hydrants must be located within a 10' wide dedicated utility easement along
the eastern property line.
Sanitary sewer is also available to the property from the adjacent Brookglen
Subdivision. The capacity of an existing service has been field verified by
the Public Works Department. As proposed, sewer demand from the facility
may impact the ability to provide service to future residential development in
the area specifically to the east of the subject tract.
The facility has on-site detention located just north of the current assisted
living center. The addition is proposed at the site of the present detention
system, the detention basin is planned to move further north of the facility.
This project would add a significant amount of storm runoff due to an
increase in impervious cover (pavement). Particular attention must be given
to the impacts of storm water runoff effects to the residential subdivision to
the north.
Storm water management techniques and proper maintenance of the
detention system is suggested. In addition, Harris County Flood Control
District (HCFCD) approval shall be required for overall detention of the
facility.
Parsons House
SCU08-007
Page 4 of 5
Conclusion &
Recommendations:
Landscaping & Screening - Conceptually, the proposed development
appears to be compatible with the existing land uses. However, landscaping
and screening of the parking areas from the abutting residential shall be
required in compliance with Section 106-444(a) of the Code of Ordinances.
Parking - If approved, the building and parking lot should comply with all
applicable zoning regulations. Striping of the existing and proposed parking
lot shall be required. The City's design standard per Section 106-835 of the
Code of Ordinances shall be applicable for standard and accessible parking
space size, and maneuvering aisle width. The location of handicap parking
spaces should be appropriate. Access from the adjoining parking lot to the
new building should be reasonable.
This application for a Special Conditional Use Permit does not comply with
the ordinance requirements. The Commission needs to review and carefully
determine if the originally imposed conditions of the intra-district P.U.D.
should still be applicable in this case. In addition, performance standards,
e.g. density intensity in R-2 zone, and drainage are concerns and will remain
outstanding issues. If the Planning and Zoning Commission wishes to
consider approval of this Special Conditional Use Permit request, staff
recommends the following conditions as a minimum be considered:
1. This Special Conditional Use Permit is specifically limited for an
additional 41 unit facility at 8727 Fairmont Parkway.
2. No future Special Conditional Use Permit submittal shall hereafter
authorize an aggregate total of more than 101 units on the site.
3. The use of this property is limited to senior citizen "assisted living
center" as defmed in SIC #8361. A senior citizen is defined as a person
who is 55 years of age or older.
4. If intra-district P.U.D. remains, covenants shall be submitted for the
City's review and approval.
5. An overall density of the assisted living center shall not exceed 17.91
dwelling units per acre.
6. A development site plan shall be reviewed and approved by the City
prior to any construction at site.
7. Internal access to the northern portion of the tract shall be provided for
by provision of a private street (min. 24' wide).
8. Adequate provisions are made for fire protection and other utility
services to additional building.
9. Outdoor activities shall be restricted to the parking area and concrete
pavement on the east and west sides of the building.
10. All lighting in the parking lot shall be hooded and arranged to deflect
lights away from the nearby residential properties in compliance with
Section 106-521(a) of the Code of Ordinances.
11. Any new signage requires a separate sign permit from the City.
12. The roofed-over structures on the property shall not accumulatively
exceed the current lot coverage or maximum (75%).
Parsons House
SCU08-007
Page 5 of5
13. Height of the building shall be the same as existing one.
14. Exterior building design standards shall be approved by the City.
15. Landscaping/screening shall be required as per Section 106-444(a)
within said setback areas along east and west of the perimeter adjacent to
the residential zoned properties.
16. Provide landscape buffer along east side of the facility as well.
17. Landscaping shall be maintained by the owner/developer.
18. On and off-site drainage whether existing or planned shall have a net
zero effect for stormwater runoff to surrounding areas and mitigate
drainage issues at the driveways along Fairmont Parkway.
19. The Developer shall comply with all applicable laws and ordinances of
the City and the State of Texas.
Options available to the Commission:
· Recommend to Council approval of this SCUP with additional
conditions.
· Recommend to Council denial of this SCUP.
· Table the item for further consideration by the Commission.
A recommendation from the Commission on this Special Conditional Use
Permit will be forwarded to City Council for final consideration.
Draft
City of La Porte
Special Conditional Use Permit # SCU 08-007
This permit is issued to:
The Parsons Group
Owner or Agent
200 West Victoria Street. Santa Barbara, California 93101
Address
For Development of:
Parsons House
Development Name
8727 Fairmont Parkway, La Porte, TX 77571
Address
Legal Description:
5.637 acres out of the W. M. Jones Survey, Abstract 482
La Porte Outlots, La Porte, Harris County, TX
Zoning:
Medium Density Residential (R-2)
Use:
Senior Citizen Assisted Livinq Center
Permit Conditions:
1. This Special Conditional Use Permit is specifically limited for an additional 41 units facility at 8727 Fairmont
Parkway.
2. No future Special Conditional Use Permit submittal shall hereafter authorize an aggregate total of more
than 101 units on the site.
3. The use of this property is limited to senior citizen "assisted living center" as defined in SIC #8361. A
senior citizen is defined as a person who is 55 years of age or older.
4. If intra-district P.U.D. remains, covenants shall be submitted for the City's review and approval.
5. An overall density of the assisted living center shall not exceed 17.91 dwelling units per acre.
6. A development site plan shall be reviewed and approved by the City prior to any construction at site.
7. Internal access to the northern portion of the tract shall be provided for by provision of a private street
(min. 24' wide).
8. Adequate provisions are made for fire protection and other utility services to additional building.
9. Outdoor activities shall be restricted to the parking area and concrete pavement on the east and west
sides of the building.
10. All lighting in the parking lot shall be hooded and arranged to deflect lights away from the nearby
residential properties in compliance with Section 106-521 (a) of the Code of Ordinances.
11. Any new signage requires a separate sign permit from the City.
12. The roofed-over structures on the property shall not accumulatively exceed the current lot coverage or
maximum (75%).
13. Height of the building shall be the same as existing one.
14. Exterior building design standards shall be approved by the City.
15. Landscaping/screening shall be required as per Section 106-444(a) within said setback areas along
east and west of the perimeter adjacent to the residential zoned properties.
16. Provide landscape buffer along east side of the facility as well.
17. Landscaping shall be maintained by the owner/developer.
18. On and off-site drainage whether existing or planned shall have a net zero effect for stormwater runoff
to surrounding areas and mitigate drainage issues at the driveways along Fairmont Parkway.
19. The Developer shall comply with all applicable laws and ordinances of the City and the State of Texas.
Failure to begin construction within 12 months as scheduled under the terms of a special conditional use permit shall void
the permit as approved, except upon an extension of time granted after application to the Planning and Zoning Commission.
If construction is terminated after completion of any stage and there is ample evidence that further development is not
contemplated, the ordinance establishing such special conditional use permit may be rescinded by the City Council, upon its own
motion or upon the recommendation of the Planning and Zoning Commission of the City of La Porte, and the previous zoning of
the entire tract shall be in full effect on the portion which is undeveloped.
Validation Date:
Director of Planning
City Secretary
NPDES
STORM WATER MANAGEMENT PROGRAM
Excerpt from City of La Porte Storm Water Management Plan
2.3.1.3 Responsible Persons
The La Porte City Secretary is responsible for implementation of B:MPl to meet
Measurable Goal 2.3 .1.1.
2.3.2 BMP2 -Advisory Committee
La Porte will use its Planning and Zoning Commission as an "Advisory Committee" as
part of this Storm Water Management Program. The Commission represents different
segments of the comro.unity that will be affected by the La Porte Storm Water Management
Program (LPSWMP) implementation. The commission will review plans for storm water
quality and offer recommendations to facilitate implementation. They will also review this
Storm Water Management Program and may provide recommendations to facilitate
implementation. They will be updated periodically regarding the ongoing program
implementation.
2.3.2.1 Measurable Goals
The measurable goal for implementation of this B:MP is to form the Advisory Committee.
2.3.2.2 Schedule
Pro am
? Public
Involvement
BMP
Advisory
Cornmittee
Activi
1. Form Advisory
ommittee.
. Continue updating
oup on
. mplementation of
he SWMP.
. Implementation
com lete.
Date Due
2003-2004
Years 1-5
Year 5
2.3.2.3 Responsible Persons
The Planning Division Director is responsible for implementation of this B:MP to meet
Measurable Goal 2.3 .2.1.
2.3.3 BMP3 - Public Meeting
Following review and comment of the storm water management/maintenance plan and this
Storm Water Management Plan by the Advisory Committee, the City of La Porte will hold
a Public Meeting to present the plans to the public.
&EPA
Stormwater Phase II
Final Rule
Fact Sheet Series
Overview
1.0 - Stormwater Phase II Final
Rule: An Overview
Small MS4 Program
2.0 - Small MS4 Stormwater
Program Overview
2.1 - Who's Covered? Designation
and Waivers of Regulated Small
MS4s
2.2 - Urbanized Areas: Definition
and Description
Minimum Control Measures
2.3 - Public Education and
Outreach
2.4 - Public Participation/
Involvement
2.5 -Illicit Discharge Detection
and Elimination
2.6 - Construction Site Runoff
Control
2.7 - Post-Construction Runoff
Control
2.8 - Pollution Prevention/Good
Housekeeping
2.9 - Permitting and Reporting:
The Process and Requirements
2.10 - Federal and State-Operated
MS4s: Program Implementation
Construction Program
3.0 - Construction Program
Overview
3.1 - Construction Rainfall
Erosivity Waiver
Industrial "No Exposure"
4.0 - Conditional No Exposure
Exclusion for Industrial Activity
United States
Environmental Protection
Agency
Office of Water EPA 833-F-OO-001
(4203) January 2000 (revised December 2005)
FaclSheet 1.0
Stormwater Phase II
Final Rule
An Overview
Why Is the Phase IT Stormwater Program Necessary?
Since the passage of the Clean Water Act (CW A), the quality of our Nation's waters has
improved dramatically. Despite this progress, however, degraded waterbodies still exist.
According to the 2000 National Water Quality Inventory (Inventory), a biennial summary of
State surveys of water quality, approximately 40 percent of surveyed U.S. waterbodies are
still impaired by pollution and do not meet water quality standards. A leading source of this
impairment is polluted runoff. In fact, according to the Inventory, 13 percent of impaired
rivers, 18 percent of impaired lake acres and 32 percent of impaired estuaries are affected by
urban/suburban stormwater runoff.
Phase I of the U.S. Environmental Protection Agency's (EPA) stormwater program was
promulgated in 1990 under the CW A. Phase I relies on National Pollutant Discharge
Elimination System (NPDES) permit coverage to address stormwater runoff from:
(1) "medium" and "large" municipal separate storm sewer systems (MS4s) generally serving
populations of 100,000 or greater, (2) construction activity disturbing 5 acres ofland or
greater, and (3) ten categories of industrial activity.
The Stormwater Phase II Final Rule is the next step in EPA's effort to preserve, protect,
and improve the Nation's water resources from polluted stormwater runoff. The Phase II
program expands the Phase I program by requiring additional operators ofMS4s in urbanized
areas and operators of small construction sites, through the use ofNPDES permits, to
implement programs and practices to control polluted stormwater runoff. See Fact Sheets 2.0
and 3.0 for overviews ofthe Phase II programs for MS4s and construction activity.
Phase II is intended to further reduce adverse impacts to water quality and aquatic habitat by
instituting the use of controls on the unregulated sources of stormwater discharges that have
the greatest likelihood of causing continued environmental degradation. The environmental
problems associated with discharges from MS4s in urbanized areas and discharges resulting
from construction activity are outlined below.
MS4s in Urbanized Areas
Stormwater discharges from MS4s in urbanized areas are a concern because of the high
concentration of pollutants found in these discharges. Concentrated development in
urbanized areas substantially increases impervious surfaces, such as city streets, driveways,
parking lots, and sidewalks, on which pollutants from concentrated human activities settle and
remain until a storm event washes them into nearby storm drains. Common pollutants include
pesticides, fertilizers, oils, salt, litter and other debris, and sediment. Another concern is the
possible illicit connections of sanitary sewers, which can result in fecal coliform bacteria
entering the storm sewer system. Stormwater runoff picks up and transports these and other
harmful pollutants then discharges them - untreated - to waterways via storm sewer systems.
When left uncontrolled, these discharges can result in fish kills, the destruction of spawning
and wildlife habitats, a loss in aesthetic value, and contamination of drinking water supplies
and recreational waterways that can threaten public health.
>'
Fact Sheet 1.0 - Stormwater Phase II Final Rule: An Overview
Page 2
Construction Activity
Uncontrolled runoff from construction sites is a water quality
concern because of the devastating effects that sedimentation
can have on local waterbodies, particularly small streams.
Numerous studies have shown that the amount of sediment
transported by stormwater runoff from construction sites with
no controls is significantly greater than from sites with
controls. In addition to sediment, construction activities yield
pollutants such as pesticides, petroleum products, construction
chemicals, solvents, asphalts, and acids that can contaminate
stormwater runoff. During storms, construction sites may be
the source of sediment-laden runoff, which can overwhelm a
small stream channel's capacity, resulting in streambed scour,
streambank erosion, and destruction of near-stream vegetative
cover. Where left uncontrolled, sediment-laden runoff has
been shown to result in the loss of in-stream habitats for fish
and other aquatic species, an increased difficulty in filtering
drinking water, the loss of drinking water reservoir storage
capacity, and negative impacts on the navigational capacity of
waterways.
Are Municipally Operated Sources Exempted
by the Intermodal Surface Transportation
Efficiency Act (ISTEA) of 1991 Affected by
the Final Rule?
Provisions within ISTEA temporarily delayed the deadline
for Phase I industrial activities (with the exception of
power plants, airports, and uncontrolled sanitary landfills)
operated by municipalities with populations of less than
100,000 people to obtain an NPDES stormwater discharge
permit. Congress delayed the permitting deadline for these
facilities to allow small municipalities additional time to
comply with NPDES requirements. The Phase II Final Rule
ended this temporary exemption from permitting. Since March
10,2003, all ISTEA-exempted municipally operated
industrial activities were required to obtain permit coverage.
How Was the Phase II Final Rule Developed?
EPA developed the Phase II Final Rule during extensive
consultations with a cross-section of interested
stakeholders brought together on a subcommittee chartered
under the Federal Advisory Committee Act, and with
representatives of small entities participating in an advisory
process mandated under the Small Business Regulatory
Enforcement Fairness Act. In addition, EPA considered
comments submitted by over 500 individuals and
organizations during a 90-day public comment period on
the proposed rule.
Why Does Part of the Phase II Final Rule Use a
Question and Answer Format?
The provisions pertaining to operators of small MS4s are
written in a "readable regulation" form that uses the "plain
language" method. Questions and answers are used to create
more reader-friendly and understandable regulations. The
plain language method uses "must" instead of "shall" to
indicate a requirement and words like "should," "could," or
"encourage" to indicate a recommendation or guidance.
Who Is Covered by the Phase II Final Rule?
The final rule "automatically" covers two classes of
stormwater dischargers on a nationwide basis:
(1) Operators of small MS4s located in ''urbanized
areas" as delineated by the Bureau of the Census. A
"small" MS4 is any MS4 not already covered by
Phase I of the NPDES stormwater program. See
Fact Sheets 2.1 and 2.2 for more information on
small MS4 coverage.
(2) Operators of small construction activities that
disturb equal to or greater than I (one) and less than
5 (five) acres ofland. See Fact Sheet 3.0 for more
information on small construction activity coverage.
Waivers
Permitting authorities may waive "automatically designated"
Phase II dischargers if the dischargers meet the necessary
criteria. See Fact Sheets 2.1 (small MS4 waivers overview),
3.0 (construction waivers overview) and 3.1 (construction
rainfall erosivity waiver) for details.
Phased-in Permit Coverage
Permitting authorities may phase-in permit coverage for small
MS4s serving jurisdictions with a population under 10,000 on
a schedule consistent with a State watershed permitting
approach.
Additional Designations hv the Permitting Authority
Small MS4s located outside of urbanized areas, construction
activity disturbing less than 1 acre, and any other stormwater
discharges can be designated for coverage if the NPDES
permitting authority or EP A determines that stormwater
controls are necessary. See Fact Sheet 2.1 for more
information on the designation of small MS4s located outside
of urbanized areas.
Fact Sheet 1.0 - Stormwater Phase II Final Rule: An Overview
Page 3
What Does the Phase II Final Rule Require?
Operators of Phase II-designated small MS4s and small
construction activity are required to apply for NPDES
permit coverage, most likely under a general rather than
individual permit, and to implement stormwater discharge
management controls (known as "best management practices"
(BMPs)). Specific requirements for each type of discharge
are listed below.
Small MS4s
o A regulated small MS4 operator must develop,
implement, and enforce a stormwater management
program designed to reduce the discharge of
pollutants from their MS4 to the "maximum extent
practicable," to protect water quality, and to satisfY
the appropriate water quality requirements of the
CW A. The rule assumes the use of narrative, rather
than numeric, effluent limitations requiring
implementation ofBMPs.
o The small MS4 stormwater management program
must include the following six minimum control
measures: public education and outreach; public
participation/involvement; illicit discharge detection
and elimination; construction site runoff control;
post-construction runoff control; and pollution
prevention/good housekeeping. See Fact Sheets 2.3
through 2.8 for more information on each measure,
including BMPs and measurable goals.
o A regulated small MS4 operator must identifY its
selection ofBMPs and measurable goals for each
minimum measure in the permit application. The
evaluation and assessment of those chosen BMPs and
measurable goals must be included in periodic
reports to the NPDES permitting authority. See Fact
Sheet 2.9 for more information on permitting and
reporting.
Small Construction Activity
o The specific requirements for stormwater controls on
small construction activity will be defined by the
NPDES permitting authority on a State-by-State
basis.
o Many NPDES permitting authorities have adapted
their existing Phase I general permits for large
construction activity to also include small
construction activity. Where this has occurred, a
stormwater pollution prevention plan is required for
small construction activity. See Fact Sheet 3.0 for
more information on potential program requirements
and appropriate BMPs for small construction activity.
What Is the Phase II Program Approach?
The Phase II program, based on the use of federally
enforceable NPDES permits:
o
Encourages the use of general permits;
o Provides flexibility for regulated operators to
determine the most appropriate stormwater controls;
o Allows for the recognition and inclusion of existing
NPDES and non-NPDES stormwater programs in
Phase II permits;
o Includes public education and participation efforts
as primary elements ofthe small MS4 program;
o Attempts to facilitate and promote watershed
planning and to implement the storm water program
on a watershed basis; and
o Works toward a unified and comprehensive NPDES
stormwater program with Phase I ofthe program.
How Does the Phase II Final Rule Address the
Phase I Industrial "No Exposure" Provision?
In addition to establishing a deadline for ISTEA facilities
and designating two new classes of dischargers, the
Phase II Final Rule revises the "no exposure" provision
originally included in the 1990 regulations for Phase Iofthe
NPDES stormwater program. The provision was remanded to
EPA for further rulemaking and, subsequently, included in its
revised form in the Phase II rule.
Under the Phase 11 Final Rule, a conditional no exposure
exclusion is available to operators of all categories of Phase I
regulated industrial activity (except category (x) construction
activity) who can certifY that all industrial materials and
activities are protected by a storm resistant shelter to prevent
exposure to rain, snow, snowmelt, and/or runoff. To obtain
the no exposure exclusion, written certification must be
submitted to the NPDES permitting authority. The final rule
includes a No Exposure Certification form for use only by
operators of industrial activity in areas where EP A is the
NPDES permitting authority. See Fact Sheet 4.0 for more
information on the conditional no exposure exclusion for
industrial activity.
Fact Sheet 1.0 - Stormwater Phase II Final Rule: An Overview
Page 4
What Resources are Available for Phase II
Communities?
Ep A is committed to providing tools to facilitate
implementation of the final Phase II stormwater program
in an effective and cost-efficient manner. The stormwater
Web site includes fact sheets, case studies, guidance
documents, the National Menu of BMPs, and the Measurable
Goals Guidance, as well as other compliance assistance
information. This information can be accessed at EPA's
stormwater Web site at www.epa.gov/npdes/stormwater.
What Is the Schedule for the Phase II Rule?
o
The Phase II Final Rule was published in the Federal
Register on December 8, 1999 (64 FR 68722).
For Additional Information
Contacts
IlW U.S. EPA Office of Wastewater Management
hUp:/lwww .cpa.gov Inodes/stormwatcr
Phone: 202-564-9545
IlW Your NPDES Permitting Authority. Most States and
Territories are authorized to administer the NPDES.
Program, except the following, for which EP A is the
permitting authority:
Alaska
District of Columbia
Idaho
Massachusetts
New Hampshire
New Mexico
American Samoa
Guam
Johnston Atoll
Midway and Wake Islands
Northern Mariana Islands
Puerto Rico
Trust Territories
o
The Conditional No Exposure Exclusion option is
available in States where EP A is the permitting
authority (see http://www.epa.l.wv/npdcs/authorization).
IlW A list of names and telephone numbers for each EP A
Region and State is located at htlp:l/www.epa.gov/
npdcs/stormwatcr (click on "Contacts").
Reference Documents
IlW EPA's Stormwater Web Site
http:// www.cpa.gov/npdes/stnrmwaler
. Stormwater Phase II Final Rule Fact Sheet Series
. Stormwater Phase II Final Rule (64 FR 68722)
. National Menu of Best Management Practices
for Stormwater Phase II
. Measurable Goals Guidance for Phase II Small
MS4s
. Stormwater Case Studies
. And many others
o
The NPDES permitting authorities were required to
issue general permits for Phase II-designated small
MS4s and small construction activity by December 9,
2002.
o
Operators of Phase II "automatically" designated
regulated small MS4s and small construction activity
were required to obtain permit coverage within 90 days
of permit issuance.
o
The NPDES permitting authority may phase-in
coverage for small MS4s serving jurisdictions with a
population under 10,000 on a schedule consistent with
a State watershed permitting approach.
o
Operators of regulated small MS4s must fully
implement their storm water management programs
by the end of the first permit term, typically a 5-year
period.