HomeMy WebLinkAbout03.13.2025 TIRZ agenda packet
Agendas and Agenda Materials
Meetings of the Boards of Directors
La Porte
Redevelopment Authority
La Porte Tax Increment
Reinvestment Zone
March 13, 2025
*Persons with disabilities who plan to attend this meeting and would like to request auxiliary aids or services are requested to contact the Authority’s Administrator at (713) 595-1200 at least three business days
prior to the meeting so that the appropriate arrangements can be made. Pursuant to V.T.C.A Government Code, Chapter 551, as amended, the Board of Directors may convene in closed session to receive advice
from legal counsel and discuss matters relating to pending or contemplated litigation, personnel matters, gifts and donations, real estate transactions, the deployment, or specific occasions for the implementation
of, security personnel or devices and or economic development negotiations .
NOTICE OF JOINT MEETING OF LA PORTE REDEVELOPMENT AUTHORITY
AND THE LA PORTE TAX INCREMENT REINVESTMENT ZONE
NOTICE is hereby given of the joint meeting of the La Porte Redevelopment Authority and La Porte Tax Increment Reinvestment Zone
to be held Thursday, March 13, 2025, at 6:00 p.m. in the City Council Chambers at City Hall, 604 West Fairmont Parkway, La
Porte, Texas, open to the public, to consider, discuss, and adopt such orders, resolutions or motions, and take direct actions as may be
necessary, convenient, or desirable, with respect to the following matters:
AGENDA
1. Determine Quorum; and Call to Order.
2. Receive public comments.
3. Accept Oath of Office and Sworn Statement of newly appointed board member DeeAnne Thomson, Position 8.
4. Approve Minutes of the joint La Porte Redevelopment Authority and La Porte Tax Increment Reinvestment Zone meeting
held on February 13, 2025.
5. Gauge Engineering:
a. M Street.
b. Lakes at Fairmont Green Detention.
i. Consider Gauge Task Order for design and bid services for Lakes at Fairmont Green Detention.
c. 16th Street Intersection
d. Main Street
i. Consider Gauge Task Order for preliminary engineering report and traffic analysis services for Main
Street Revitalization.
6. Receive Bookkeeper’s Report and consider approval or other action regarding authority invoices.
7. Receive updates from the city, developers, and staff about development within the Zone.
8. Adjournment.
In compliance with the American Disabilities Act, the City of La Porte City will provide for reasonable accommodations for pe rsons attending public
meetings. To better serve attendees, requests should be received 24 hours prior to the meetings. Please cont act the City Secretary, at 281-470-5019 or
TDD 281-471-5030. A possible quorum of City Council members may be present at this meeting and participate in discussions but will take no action.
_________________________
David W. Hawes, Zone Administrator
LA PORTE REDEVELOPMENT AUTHORITY,
CITY OF LA PORTE, TEXAS
AGENDA MEMORANDUM
TO: La Porte Redevelopment Authority Board of Directors
FROM: Zone Administrator
SUBJECT: Agenda Item Materials
LA PORTE REDEVELOPMENT AUTHORITY
c/o Hawes Hill & Associates LLP
P.O. Box 22167
Houston TX 77227-2167
713-595-1200 or FAX 281-888-6314
3. Accept Oath of Office and Sworn Statement of newly appointed board member DeeAnne Thomson,
Position 8.
LA PORTE REDEVELOPMENT AUTHORITY,
CITY OF LA PORTE, TEXAS
AGENDA MEMORANDUM
TO: La Porte Redevelopment Authority Board of Directors
FROM: Zone Administrator
SUBJECT: Agenda Item Materials
LA PORTE REDEVELOPMENT AUTHORITY
c/o Hawes Hill & Associates LLP
P.O. Box 22167
Houston TX 77227-2167
713-595-1200 or FAX 281-888-6314
4. Approve Minutes of the joint La Porte Redevelopment Authority and La Porte Tax Increment
Reinvestment Zone meeting held on February 13, 2025.
MINUTES OF THE JOINT MEETING OF THE
LA PORTE REDEVELOPMENT AUTHORITY and
LA PORTE TAX INCREMENT REINVESTMENT ZONE
BOARD OF DIRECTORS
February 13, 2025
DETERMINE QUORUM; CALL TO ORDER.
The Board of Directors of the La Porte Redevelopment Authority, City of La Porte, Texas, and La Porte
Tax Increment Reinvestment Zone, held a regular joint meeting, open to the public, on Thursday,
February 13, 2025, at 6:00 p.m., in the Council Chambers of City Hall, 604 West Fairmont Parkway,
La Porte, Texas, and the roll was called of the duly appointed members of the Board, to-wit:
Position 1 Peggy Antone, Secretary Position 6 Mark Goodwin, Chairman
Position 2 Barry Beasley Position 7 Mercy Estrada
Position 3 Alton Porter Position 8 Dee Anne Thomson
Position 4 Kent Remmel Position 9 Kristen Lee, Asst. Secretary
Position 5 Nicole Havard
and all of the above were present, with the exception of Directors Beasley, Lee and Thomson, thus
constituting a quorum. Also present were David Hawes, Naina Magon and Linda Clayton, Hawes Hill
& Associates, LLP; Matt Daeumer, Haley Bower and Sherry Rodriguez, City of La Porte; Muhammad
Ali and Ian Hudson, Gauge Engineering; Gloria Brutscher; and David Williams. Chairman Goodwin
called the meeting to order at 6:02 p.m.
RECEIVE PUBLIC COMMENTS.
There were no public comments.
ACCEPT OATH OF OFFICE AND SWORN STATEMENT OF NEWLY APPOINTED BOARD MEMBER
DeeAnne THOMSON, POSITION 8.
Tabled.
APPROVE MINUTES OF THE JOINT LA PORTE REDEVELOPMENT AUTHORITY AND LA PORTE
TAX INCREMENT REINVESTMENT ZONE MEETING HELD ON JANUARY 9, 2025.
Upon a motion made by Director Porter, and seconded by Director Estrada, the Board voted
unanimously to approve the Minutes of the January 9, 2025, Board meeting, as presented.
GAUGE ENGINEERING:
a. M Street Improvements.
i. Consider Change Order No. 1, M Street Improvements, from Carter Construction
LLC.
Mr. Ali reviewed Change Order No. 1, M Street Improvements, from Carter Construction LLC
decreasing the construction contract in the amount of ($129,025.41), included in the Board materials.
He reported the change order adjusts item quantities and reconciles the final quantities and items of
2 | P a g e
work to close out the project. He reported he has reviewed the change order and concurs with the
amount and is recommending for approval.
ii. Consider Pay Application No. 10 (FINAL), M Street Improvements, from Carter
Construction LLC.
Mr. Ali reviewed Pay Application No. 10 (FINAL), M Street Improvements, from Carter Construction
LLC in the amount of $118,144.98, included in the Board materials. He reported he has reviewed the
pay application and concurs with the amount and quantities and is recommending for approval.
Upon a motion made by Director Havard, and seconded by Director Estrada, the Board voted
unanimously to (i) approve Change Order No. 1, M Street Improvements, from Carter Construction
LLC decreasing the construction contract in the amount of ($129,025.41), as presented; and (ii)
approve Pay Application No. 10 (FINAL), M Street Improvements, from Carter Construction LLC in
the amount of $118,144.98, as presented.
b. Lakes at Fairmont Green Detention.
i. Receive analysis and consider options.
Mr. Hudson presented an analysis and solutions for the Lakes at Fairmont Green Detention, a copy of
the presentation is included in the Board materials. He reported overall the basin has experienced
more sedimentation than erosion. He recommended de-silting to remove the sedimentation and
overgrowth. He reported installing aeration would be recommended for long-term after the desilting
was done. He answered questions regarding installing landscaping to help future sedimentation and
erosion. Upon a motion made by Director Antone, and seconded by Director Porter, the Board voted
unanimously to authorize Gauge Engineering to prepare a task order for design and bid services for
the detention.
c. 16th Street Intersection.
Ms. Magon reported the 16th Street intersection project was ranked #1 in the feasibility rankings for
projects. Mr. Daeumer reported the City is requesting a preliminary engineering report and detailed
design services for the project. He reported the County will take the lead in Construction and split
the costs 50/50 with the TIRZ. Ms. Magon noted the TIRZ currently has $6 Million of County funds.
i. Consider Gauge Engineering Task Order for preliminary engineering report
and detailed design services.
Mr. Ali reviewed Task Order No. 6 for preliminary engineering report and detailed design services
for 16th Street intersection in the amount of $302,000.00, included in the Board materials. He
provided an overview of the scope of services and answered questions. Upon a motion made by
Director Havard, and seconded by Director Estrada, the Board voted unanimously to approve Gauge
Engineering Task Order No. 6 for preliminary engineering and detailed design services for the 16th
Street intersection project in the amount of $302,000.00, as presented.
RECEIVE BOOKKEEPER’S REPORT AND CONSIDER APPROVAL OR OTHER ACTION REGARDING
AUTHORITY INVOICES.
Ms. Magon presented the Bookkeeper’s Report and review of current invoices for payment, included
in the Board materials. Upon a motion made by Director Remmel, and seconded by Director Havard,
the Board voted unanimously to accept the Bookkeeper’s Report and approved payment of invoices,
as presented.
3 | P a g e
RECEIVE UPDATES FROM THE CITY, DEVELOPERS, AND STAFF ABOUT DEVELOPMENT WITHIN
THE ZONE.
Mr. Daeumer provided an update on the Main Street improvement project. He reported a meeting
with stakeholders is scheduled next Wednesday to discuss the project. He reported if positive
feedback is received to move forward with the project, the City will be requesting the Board to
consider a task order for preliminary engineering services for the project. He requested the Board
to reconsider looking at G Street and having a traffic analysis report done. He reported M Street was
added to the truck route. No action from the Board was required.
BOARD MEMBER COMMENTS.
a. Matters appearing on agenda; and
b. Inquiry of staff regarding specific factual information or existing policy.
None.
ADJOURNMENT.
There being no further business to come before the Board, Chairman Goodman adjourned the
meeting at 6:46 p.m.
_______________________________________________
Secretary
LA PORTE REDEVELOPMENT AUTHORITY,
CITY OF LA PORTE, TEXAS
AGENDA MEMORANDUM
TO: La Porte Redevelopment Authority Board of Directors
FROM: Zone Administrator
SUBJECT: Agenda Item Materials
LA PORTE REDEVELOPMENT AUTHORITY
c/o Hawes Hill & Associates LLP
P.O. Box 22167
Houston TX 77227-2167
713-595-1200 or FAX 281-888-6314
5. Gauge Engineering:
a. M Street.
b. Lakes at Fairmont Green Detention.
i. Consider Gauge Task Order for design and bid services for Lakes at Fairmont
Green Detention.
c. 16th Street Intersection
d. Main Street
i. Consider Gauge Task Order for preliminary engineering report and traffic
analysis services for Main Street Revitalization.
PROGRESS REPORT
MARCH 2025
LA PORTE REDEVELOPMENT AUTHORITY/TIRZ 1
11750 Katy Freeway, Suite 400
Houston, TX 77079
TASK ORDER #3: M STREET IMPROVEMENT PROJECT (CONSTRUCTION) (COMPLETE)
Activities This Period:
• Evaluated curb return radii at 16th and Highway 146 Frontage. See the attached exhibit on the following
page.
Activities In the Next Period:
• Compile as-built plans and submit them to the City of La Porte.
TASK ORDER #5: LAKES AT FAIRMONT GREENS DETENTION BASIN EVALUATION
Activities This Period:
• Drafted and finalized design proposal.
TASK ORDER #6: 16TH STREET AND SPENCER HWY INTERSECTION IMPROVEMENTS
Activities This Period:
• Issued subconsultant agreements with United and Terracon.
• Began traffic count effort.
Activities In the Next Period:
• Kick-off sub consultants and complete traffic counts.
• Begin preliminary engineering phase.
PROGRESS REPORT
MARCH 2025
LA PORTE REDEVELOPMENT AUTHORITY/TIRZ 1
11750 Katy Freeway, Suite 400
Houston, TX 77079
11011 Richmond Avenue | Suite 200 | Houston, TX 77042
Main 713.965.9996 + Fax 713.965.0044 + TBPE Firm F-11278
HRGREEN.COM
March 6, 2025
Mr. David Hawes, Administrator
La Porte Redevelopment Authority/TIRZ #1
9600 Long Point Road, Suite 200
Houston, Texas 77035
Re: Design, Bid, and Construction Phase Services Proposal
The Lakes at Fairmont Greens – Detention Basin Improvements
Dear Mr. Hawes,
HR Green is pleased to present our attached proposal to provide Design, Bid and Construction Phase Services for
the referenced project. The purpose of the design is to address erosion, siltation, and stagnant water in the existing
detention basin serving The Lakes at Fairmont Greens subdivision. A summary of the proposed costs is included
below:
Task Description Cost
1 Project Coordination and Meetings $2,464.00
2 Data Collection and Review $2,144.00
3 Construction Documents $22,976.00
4 Bid and Construction Phase Services $11,172.00
Total Cost $38,756.00
The scope of services are as follows:
Task 1: Project Coordination and Meeting
We will coordinate project status updates internally and with the client to facilitate the delivery of the project
· One (1) Kickoff Meeting with the Client and three (3) monthly progress meetings with the Client including
preparation and meeting minutes
· Monthly Schedule updates, Invoicing, and Project Controls
Task 2: Data Collection and Review
We will collect information to assist in the design and bidding of the proposed construction project. Tasks required
for data collection and review are listed below:
· Topographic survey was collected under prior authorization and will be leveraged for the design effort
· Review existing drainage studies, record drawings, survey data, and proposed future developments.
· Obtain and review utility information from CenterPoint Energy, AT&T, and Comcast.
Mr. David Hawes
March 6, 2025
2
3-13-25
Task 3: Construction Documents
The proposed design will analyze improvements to the basin including removal of accumulated sediment,
overgrowth, and sediment forebays, repairing eroded slopes, incorporating backslope interceptor systems where
feasible, removal and replacement of the existing fence along the golf course, and review aeration systems to
recommend for installation. The following items will be submitted for the 60% and 100% design submittals to be
sued for public bidding.
· Construction drawings, SWPPP, and Details
· Project manual with necessary front-end documents & specifications
· Opinions of probable construction costs
Task 4: Bid and Construction Phase Services
HR Green will assist the La Porte TIRZ with bidding the project and providing construction phase services as listed
below:
· Assist with Advertisement of the project
· Attend and conduct pre-bid meeting
· Furnish the Project Manual with necessary Front-End Documents & Specifications
· Prepare the necessary addenda to address issues or clarifications
· Conduct Bid Opening meeting and tabulation of bids
· Review bid results and provide a recommendation of award
· Review Contractor submittals and RFI’s
· Attend the Pre-Construction meeting and three (3) monthly construction meetings
· Attend substantial completion and final completion walkthroughs
· Review As-Builts and complete Record Drawings
The total cost for this proposal is $38,756.00. We propose to perform these services on a lump sum fee basis and
will not begin work until authorized by the client. Thank you for the opportunity to provide this proposal, we look
forward to working with you and your staff on this assignment.
Sincerely, Accepted For
HR GREEN, INC La Porte Redevelopment Authority/TIRZ #1
Scott L. Cunningham, P.E., CFM, ENV SP ___________________________________
Project Manager Signature Date
___________________________________
Print
Attachments: Exhibit A – Level of Effort
Mark Goodwin, Chair
LEVEL OF EFFORT
The Lakes at Fairmont Greens Sec. 1 - Detention Pond Improvements
March 2025
Title Sr. PM PM SE CAD Admin
Rate/Hr 250.00$ 220.00$ 158.00$ 155.00$ 113.00$
Task Description Cost
REQUIRED TASKS
1 Project Coordination and Meetings 2,464.00$ 2 4 4 4
2 Data Collection and Review 2,144.00$ 4 8
3 Construction Documents 22,976.00$ 8 16 32 80
4 Bid and Construction Phase Services 11,172.00$ 20 40 4
38,756.00$ 10 44 84 80 8Subtotal
\\hrghus\data\La Porte\From Ian_2025-02-20\LaPorte\Proposal\loe-detention pond rehab-2025-03
ATTACHMENT A
TASK ORDER NO. 7
11750 Katy Freeway, Suite 400 • Houston, Texas 77079 • 832.318.8800
March 5, 2025
Mr. David Hawes, Administrator
La Porte Redevelopment Authority/TIRZ #1
9600 Long Point Road, Sute 200
Houston TX 77035
Re: West Main Street – Preliminary Engineering Report
Dear Mr. Hawes,
Gauge Engineering, LLC (Gauge) is pleased to submit this proposal for providing professional engineering services in the
form of a preliminary engineering report (PER) for the West Main Street corridor from State Highway 146 Frontage Road to
South Virginia Street (over 6,400 LF, including side streets). West Main Street was identified in the City of La Porte’s
Improvements Master Plan as a priority corridor. The project will involve full roadway reconstruction that will include
drainage improvements, public utility upgrades and relocations.
The preliminary engineering report (PER) is the first phase of the overall design process and will identify the key
information associated with the implementation of the PER recommendations. We propose to perform this work for a
Lump Sum amount of $260,000 over 6 months. A detailed breakdown of the scope items and fee can be found under
Exhibits “A” through “D”. Please feel free to contact me at (713) 254-5946 if you have any questions or need additional
information.
Sincerely, Accepted For
La Porte Redevelopment Authority/TIRZ #1
Muhammad Ali, P.E. 3-13-25
Principal Signature Date
Print
Attachments: Exhibit A – Scope of Services
Exhibit B – Level-of-Effort
Exhibit C & D – Traffic Engineering Services – HR Green
Mark Goodwin, Chair
3/5/2025
Page 1 of 4
EXHIBIT A
SCOPE OF SERVICES
LA PORTE REDEVELOPMENT AUTHORITY – TIRZ 1
WEST MAIN STREET RECONSTRUCTION
PRELIMINARY ENGINEERING REPORT
This proposal is for providing preliminary engineering services in the form of a preliminary engineering report (PER)
for the West Main Street Corridor from State Highway 146 Frontage Road to South Virginia Street (over 6,400 LF,
including side streets). West Main Street was identified in the City of La Porte’s Improvements Master Plan as a
priority corridor. The City of La Porte hired a landscape architectural firm to draft a multimodal conceptual plan to
enhance and beautify the corridor. Gauge Engineering will incorporate all information collected for the master plan
and incorporate it into the preliminary engineering design. All efforts completed in this PER phase will be directly
applicable to the final design phase to prevent any loss of design time.
The project scope includes the following:
• Develop a Preliminary Engineering Report (PER) for the project limits to fully scope out the project based on
current conditions and standards to present to TIRZ 1, City of La Porte, Harris County, and TxDOT.
• Build on all previous analysis and design efforts.
• Collect traffic data and develop traffic engineering report.
• Develop a roadway schematic/30% roadway and drainage plans.
• Develop utility plans.
• Utilize ATLAS 14 analysis to meet drainage criteria.
• Develop a detailed cost estimate.
• Develop initial utility matrix.
Figure 1: Project Location
3/5/2025
Page 2 of 4
The following scope describes the procedures that will be followed to provide Preliminary Engineering services and
produce the Preliminary Engineering Report. The details of the scope are as follows:
I. PRELIMINARY ENGINEERING
A. BASIC SERVICES
1. Site Visits and Data Collection
a. Site visits are necessary to account for current site conditions. The area will be reviewed to confirm
record drawings. Survey needs for detailed design will be identified and documented. Photographs and
field verification of existing features will be completed during the field visit.
2. Review Record Drawings, Studies, and CCTV videos
a. All available record drawings and information on the project area will be collected, reviewed, and used to
the maximum degree possible.
b. CCTV videos will be obtained from the City/Harris County and fully reviewed to better understand the
condition of the sanitary sewer pipes.
3. Public Utilities Assessment
Existing public utilities such as storm, water and wastewater infrastructure will all be compiled, investigated,
evaluated and depicted in exhibits per City’s requirements. Gauge will coordinate with the La Porte Public Works
department and Harris County to identify the ages of the utilities, rehabilitation dates and if they need to be
replaced.
B. ROADWAY DESIGN
1. Alternative Analysis
Based on the conceptual architectural plan completed by Burditt and stakeholders outreach by the City, Gauge
will evaluate a full reconstruction and retrofit alternatives of the proposed multi modal corridor.
2. Existing/Proposed Typical Sections
Typical Sections for proposed and existing roadways will be developed. Typical sections shall include width of
travel lanes, sidewalks, outer separations, border widths, curb offsets, and right-of-way (ROW).
3. Preliminary Roadway Schematic
The preferred preliminary roadway option for the corridor will be laid out based on ROW survey. The exhibits will
depict proposed roadway alignment, sidewalks, and driveways.
4. Preliminary Public Utilities Schematic
A preliminary storm sewer, water and sanitary sewer alignment will be laid out on current aerial photography.
5. Sight Distance/Unobstructed Visibility Easement (UVE) Analysis
Sight Distance Triangles and Unobstructed Visibility Easement’s (UVEs) will be evaluated for the intersections at
4th, 2nd, and Broadway.
These intersections will include:
• Evaluation of sight distance triangles for 15-, 20- and 25 - Feet for all 4 quadrants.
• Actual pictures of what driver is seeing at all 4 quadrants
• Identify Unobstructed Visibility Easement’s (UVEs)
C. DRAINAGE DESIGN/ANALYSIS
1. Prepare and Evaluate Existing Drainage Area Maps
Existing conditions drainage area maps will be developed for the project area. Inlet /manhole level drainage
areas will be developed for any storm sewers within the project limits. Trunkline analysis point drainage areas
3/5/2025
Page 3 of 4
will be delineated for storm sewer systems outside the project limits. The existing conditions drainage area
boundaries will be based on the best available data. Means for determining drainage area boundaries include
but are not limited to as-built information, LiDAR, field visits, and City of La Porte’s GIS Portal. Extreme event
and offsite drainage areas developed and included as part of the existing drainage area map.
2. Proposed Conditions Storm Sewer Drainage Area Map
Proposed conditions storm sewer drainage area maps for the preferred alternative will be developed at both
the overall and inlet/manhole level. The overall drainage area map will consist of drainage areas, 5-year
storm sewer runoff rates, and flow direction arrows, and will include a preliminary layout of all proposed storm
sewer trunk lines and inlets. Drainage areas will be delineated based on the improvements evaluated in the
Proposed System Analysis.
3. Proposed Conditions Drainage Schematic
A schematic of the proposed drainage improvements will be developed to accurately communicate the
planned improvements.
4. Storm Sewer Cost Estimates/Quantities
Cost estimates will be prepared for each of the proposed improvement alternatives and proposed storm
sewer system elements.
5. Drainage Impact Assessment and Mitigation
Drainage impacts associated with the proposed roadway improvement will be evaluated and mitigation
measures necessary to ensure no adverse impacts will be proposed. Potential drainage impacts associated
with the proposed improvements include effects of additional increased impervious cover, a reduction in storm
water storage, and modifications to overland sheet flow patterns. Zero increase in runoff will be allowed.
a. Increased Impervious Cover – An evaluation of the existing and proposed impervious cover will be
performed to identify the changes associated with the proposed roadway improvements.
b. Changes in Storage – The proposed roadway will be evaluated to account for any changes in
storage.
c. SWMM Model Development – An evaluation of the existing and proposed storm sewer will be
performed to ensure no adverse impacts to Harris County’s or TxDOT’s drainage facilities.
6. Drainage Documentation for PER
The drainage portion of the PER will document the existing conditions and proposed improvements and will
address the potential for adverse impacts including necessary mitigation measures. Floodplain mitigation
requirements will be included as part of the drainage documentation to implement in the detailed design
phase. The City of La Porte and/or Harris County/TxDOT modeling guidelines will be followed, including the
development of output tables that allow the City, Harris County, and TxDOT to review the modeling effort.
D. UTILITY ENGINEERING INVESTIGATION
• Existing private utilities such as existing underground electrical, communication service lines and
distribution gas lines; and locations of existing overhead power and communication lines and poles will
all be compiled, investigated, evaluated, and depicted in exhibits per City’s requirements.
• Preliminary Private Utilities Exhibits will be prepared as per PER requirements and will assist with
identifying the key utility relocation impacts, as the design is developed.
3/5/2025
Page 4 of 4
i. An exhibit drawing showing existing conditions of private utilities, based on records received
from utility owners, will be laid out on current aerial photography.
ii. A table exhibit cataloging impacts to existing private utilities based on proposed design
recommendation or new requirement considerations.
E. PROJECT MANAGEMENT/AGENCIES & TEAM COORDINATION//QUANTITIES/OPCC
1. Project Management and Coordination:
Project management activities are ongoing throughout the period of the contract and include items such as
internal project management, kickoff meeting, monthly progress reports, invoices, and coordination with client
and all relevant agencies.
2. Quantities
Preliminary engineering level quantities will be computed.
3. Construction Cost Estimate
Construction Cost Estimate will be developed for each alternative that will include the necessary level of
detail to enable the evaluation of each alternative but will not be comprehensive.
4. PER Report Preparation
The PER Report will be prepared in accordance with the City of La Porte’s and/or Harris County’s PER form
requirements. A draft electronic report will be compiled to include text, model output, exhibits, and
appendices for the City and Harris County’s review. A signed and sealed electronic report will be submitted
after the comments have been addressed and incorporated as necessary.
5. PER Presentation and Meeting
Gauge will present the proposed improvements to the TIRZ and City of La Porte for approval. A presentation
will be prepared and will include alternatives, recommendations, and estimated OPCC.
6. Documentation and Implementation of PER Comments
Upon completion of the PER meeting, Gauge will develop a letter report to document all the decisions,
comments, and action items to be included in the PER report.
7. Quality Assurance / Quality Control
A thorough Quality Assurance/Quality Control (QA/QC) Plan will be implemented to ensure overall project
constructability, cost estimate accuracy, and design conformance with industry standards and client-specific
requirements and preferences are met.
II. EXPENSES/SUBS
1. Printing, Deliveries and Reproduction, Mileage
Expenses include printing for the public meeting, any deliveries and reproduction, and mileage at the current
rate.
2. Traffic Engineering Analysis – HR Green (Exhibit C & D)
HR Green will perform the Traffic Engineering Analysis. Exhibit C & D for additional information.
3. Community Meeting (if needed)
Gauge will present the proposed improvements to the TIRZ and City of La Porte for approval.
I.PRELIMINARY ENGINEERING
DESCRIPTION OF WORK TASKS PRINCIPAL PROJ MGR
Sr. PROJ
ENGINEER
GRAD
ENGINEER
SENIOR
DESIGNER
ADMIN
ASST
TOTAL
HOURS
LABOR
COSTS
A. BASIC SERVICES
1 Site Visits and Data Collection 1 4 56 2 63 $8,675.00
2 Review Record Drawings, Studies and CCTV videos 1 2 8 11 $1,595.00
3 Public Utilities Assessment 1 2 16 8 27 $3,755.00
Total 0 3 8 80 10 0 101 $14,025.00
B. ROADWAY DESIGN
1 Alternative Analysis 2 4 12 24 8 50 $7,490.00
2 Existing/Proposed Typical Sections 4 4 16 16 40 $5,720.00
3 Preliminary Roadway Schematic (Scale 1"-40')2 4 16 80 40 142 $20,030.00
4 Preliminary Water/Sanitary Schematic (Scale 1"-40')2 4 16 24 24 70 $10,310.00
5 Sight Distance/Unobstructed Visibility Easement (UVE) Analysis 2 4 24 8 38 $5,350.00
Total 6 18 52 168 96 0 340 $48,900.00
C. DRAINAGE ANALYSIS
1 Existing Drainage Area Maps 2 4 16 8 30 $4,270.00
2 Proposed Storm Sewer Drainage Area Maps 2 4 16 8 30 $4,270.00
3 Proposed Conditions Drainage Schematic 2 4 40 24 70 $9,670.00
4 Storm Sewer Cost Estimates/Quantities 2 2 8 12 $1,780.00
5 Drainage Impact Assessment and Mitigation 2 6 32 72 112 $16,560.00
6 Drainage Documentation for PER 2 8 16 48 12 86 $12,670.00
Total 4 22 62 200 52 0 340 $49,220.00
D. UTILITY ENGINEERING INVESTIGATION
1 Gather and document Quality Level C & D 1 4 4 9 $1,385.00
2 Compile As-built information provided by the utility owners 4 8 12 $1,740.00
3 Private Utility Exhibit drawings 1 1 2 8 4 16 $2,360.00
4 Pubic Utility Exhibit drawings 1 1 2 8 4 16 $2,360.00
5 Private Utility Coordination - Table exhibit 1 1 8 10 $1,430.00
6 Public Utility Coordination - Table exhibit 1 1 8 10 $1,430.00
Total 2 5 14 44 8 0 73 $10,705.00
E. Project Management/Agencies & Team Coordination/Quantities/OPCC
1 Project Management
a.Overall Project Mgmt/Team Coordination/ Project Controls 4 24 24 2 54 $9,460.00
b.Project Coordination/Agency Coordination Meetings 2 16 8 6 4 36 $6,080.00
2 Quantities 4 16 20 $2,820.00
3 Opinion of Probable Construction Cost 1 4 8 2 15 $2,555.00
4 PER Report Preparation 1 4 16 48 16 85 $12,245.00
5 PER Presentation and Meeting 2 4 8 16 4 4 38 $5,530.00
6 Documentation and Implemenation of PER Comments 2 2 4 8 $1,240.00
7 Quality Assurance / Quality Control 2 4 8 4 8 26 $4,130.00
Total 12 58 78 96 32 6 282 $44,060.00
TOTAL HOURS 24 106 214 588 198 6 1136
Contract Labor Rate $225.00 $185.00 $165.00 $135.00 $135.00 $80.00
TOTAL LABOR COSTS BASIC ENGINEERING SERVICES $5,400.00 $19,610.00 $35,310.00 $79,380.00 $26,730.00 $480.00 $166,910.00
II.EXPENSES/SUBS TOTAL
1 Printing (includes Boards for Public Meeting), Deliveries and Reproduction, Mileage $1,810.00
2 $86,280.00
3 Community Meeting (if needed)$5,000.00
TOTAL REIMBURSABLE EXPENSES $93,090.00 TOTAL
EXHIBIT B
WEST MAIN STREET RECONSTRUCTION
PRELIMINARY ENGINEERING REPORT- LEVEL OF EFFORT
Traffic Engineering Analysis - HR Green (Exhibit C & D)
$260,000.00
Project: Corridor Study – W Main Street, SH 146 to Virginia Street
EXHIBIT C
Exhibit A Scope of Work_Main Street Study Phase_Traffic_v2_0304202511
SCOPE OF WORK – TRAFFIC ENGINEERING
Road Name: West Main Street (Business SH-146)
Road Classification: Collector
Project Limits: SH 146 to Virginia Street
Project Length: 3,600 linear feet
Adjacent/Affected Agencies: City of La Porte, TxDOT, Harris County
Project Description: Study of approximately 3,600 linear feet, of improvements of Main Street from SH
146 to Virginia Street to reconstruct existing roadway with new roadway section to reduce lanes and
include two-way center turn lane improvements for public safety.
STUDY PHASE
The Study Phase shall consist of a series of Engineering studies and technical reports to support the Design
Concept Report. Engineer shall perform all Study Phase outlined tasks in accordance to all adopted Harris
County and/or TxDOT standards, guidelines, and specifications.
The Scope of Work for the Study Phase:
A. BASIC SERVICES
1. Site Visits and Data Collection
a. Photographs and field verification of existing features will be completed during
the field visit.
b. Previously completed reports and studies will be obtained and reviewed for
relevant information regarding the proposed roadway improvements including
relevant design criteria and national and international best practices for road
safety (NCATO, The Netherland’s CROW manual).
c. Collect Intersection Peak Hour traffic counts at the following intersections along
Main Street:
i. SH 146 SB Ramps
ii. SH 146 NB Ramps
iii. 8th Street
iv. 7th Street
v. 6th Street
vi. 5th Street
vii. 4th Street (Signalized)
viii. 3rd Street
ix. 2nd Street (Signalized)
x. 1st Street
xi. S. Broadway Street (Signalized)
xii. Virginia Street
Project: Corridor Study – W Main Street, SH 146 to Virginia Street
EXHIBIT C
Exhibit A Scope of Work_Main Street Study Phase_Traffic_v2_0304202511
Peak period traffic turning movement counts will be recorded on a typical
weekday between 6:00 AM and 7:00 PM, and will include vehicle classification,
pedestrian and bicycle data.
d. Collect & Review Crash Data
i. Collect available crash data for the previous five years available from the
TxDOT CRIS database. Calculate intersection crash rates for signalized
intersections and use the crash data to identify hot spots along the
corridor for an enhanced review to help identify countermeasures to
mitigate crash frequency and severity to include with corridor design.
Identify common crash types in the data. This information will also
inform elements and treatments to be used in the proposed design.
Identify if any segments of the corridor or cross-streets are part of the
City of Houston’s Vision Zero High Injury Network.
ii. Conduct field visits utilizing relevant elements from FHWA Road Safety
Audit guidelines.
iii. Crash data (bike, ped, motorist), identification of hot spot area, crash
trend analysis from 2014-2022, signalization and intersection, midblock,
roadside safety features (signalized/unsignalized, median, crossing,
hatching, rumble strips, center turn lane, sidewalk, ditch, lighting, etc.)
iv. Conduct individual crash analysis including reviewing crash types with
contributing factor information at crash hot spots along the corridor.
v. Identify vulnerable road users (school zones, pedestrian tracks, bike/ped
fatality and serious injury locations).
e. Collect and Review Transit Data
i. Collect available transit data for the corridor available from METRO. This
will include existing and pre-COVID boarding and alighting data by stop
and existing local services routes and headways. Existing METRO data for
stop accessibility, and amenities such as benches and shelters will be
assessed.
f. Review Plans & Studies and Corridor Data
i. Review plans and studies pertaining to the corridor.
g. Collect & Review Traffic Signal Timing
i. Coordinate with the Harris County, TxDOT and/or City of La Porte
and conduct field work as needed to obtain the existing traffic
signal timings for the signalized intersections listed in Subtask 1A.
h. Existing bike/ped connectivity
i. Circulation patterns, facility condition, existing crossing locations
2. Future Traffic Volumes
a. Establish growth rates to be used for construction year and twenty-year
planning traffic volume scenarios
i. Review historic traffic volumes from TxDOT TPP, Harris County, and City
Project: Corridor Study – W Main Street, SH 146 to Virginia Street
EXHIBIT C
Exhibit A Scope of Work_Main Street Study Phase_Traffic_v2_0304202511
of La Porte
ii. Review available Travel Demand Models from Houston-Galveston MPO
(HGAC)
iii. Review City of La Porte current land use plans
iv. Trip Generation of potential new development and redevelopment
areas
v. Consideration of lane reduction of Main Street
3. Conceptual Construction Sequencing, Detours & Impacts to Area
a. The construction sequence and a traffic control concept that will minimize
impacts to the region’s traffic movement pattern will be explored. Detours,
phasing, sequencing, construction zones, and temporary pavement
requirements will be identified. A detailed narrative will also be developed.
4. Transportation Deliverables (Traffic Engineering Report)
a. Corridor DCR materials including traffic engineering report write up, figures and
tables outlining
technical recommendations and alternatives covering:
i. Existing Corridor Conditions Assessment
a. Baseline traffic volume strip map
b. Results of crash analysis and High Injury Network
c. Existing lane configuration and traffic control
d. Intersection and corridor level of service assessments (i.e. delay,
queues, level-of-service). Assessment will be completed with
Synchro software.
e. Existing Transit Service and Usage
f. Existing Pavement Conditions
g. Existing Pedestrian Crossing Distances/Delays
h. Area Capital Projects and Bike Plan
i. Existing Land Use
j. Existing Cross-Sections
ii. Future Corridor Conditions Analysis
a. Construction Year and Design-Year traffic volume strip map
b. Safety impacts of proposed improvements
c. Right turn lane warrants analysis, as needed
d. Intersection and corridor level of service assessments (i.e. delay,
queues, level-of-service). Assessment will be completed with
Synchro software.
e. Proposed Pedestrian Crossing Distances/Delays
f. Impact of improvements to Area Capital Projects and Bike Plan
g. Future Land Use
h. Proposed Cross-Sections
iii. Recommendations
Project: Corridor Study – W Main Street, SH 146 to Virginia Street
EXHIBIT C
Exhibit A Scope of Work_Main Street Study Phase_Traffic_v2_0304202511
a. Up to two cross-section alternatives for the corridor segments.
b. Lane assignments at signalized intersections, auxiliary lanes
c. High-comfort bikeway treatment along the corridor,
and at intersections.
d. Improved multimodal crossings between existing
signalized intersections.
e. Any proposed changes or updates to traffic control along the
corridor.
f. Corridor transit Improvements.
iv. Summary of the benefits, impacts, and trade-offs of the alternative
corridor concepts as required in the DCR Report.
v. Traffic Operations Analysis outlining the traffic analysis for baseline,
construction year, and design year, and up to two corridor scenarios.
TRAFFIC
Project Name
Consultant
Project No.
Date
BASIC SERVICES
TOTAL NO OF LABOR HRS
TASK DESCRIPTION LABOR HRS. DWGS PER SHEET
& COSTS
TRAFFIC ENGINEERING AND ANALYSIS FOR CORRIDOR
STUDY PHASE
Data Collection from Harris County, City of La Porte/TxDOT/METRO for Main St Corridor 2 2 6 10
Site Investigation/Road Safety Audit 4 2 16 22
Intersection Turning Movement Count Coordination with Subconsultant (12 Intersections)4 2 8 14
Review Traffic Data (Counts, previous studies, signal timing plans, etc.)4 2 16 22
Obtain and Review Transit Data 4 2 8 2 16
Obtain and Review Crash Data from 2014 to 2022 4 1 14 2 21
Calculate Crash Rates 4 1 16 21
Calculate Crashes by Type, Severity, Cause to identify patterns and hot spots 4 1 12 17
Identify bike/pedestrian/motorcycle crashes from 2014 to 2022 2 1 6 9
Identify vulnerable road users (school zones, pedestrian tracks, fatality or serious injury locations)4 1 12 17
Crash analysis based on HSM methodologies/Crash Modification Factors to predict crash frequency/severity 4 1 24 29
Intersection Capacity Analysis, Existing Conditions (Synchro, AM/PM Peak, 12 Intersections)4 1 24 29
Growth Rate Projections/Future Traffic Volumes (Const. Year 2027/Design Year 2047)6 1 16 23
Identification of up to 2 Alternatives for Intersection Layouts 6 1 16 23
Intersection Capacity Analysis of Alternatives (Synchro, AM/PM Peak, Const. Year 2027/Design Year 2047, 12 Intersections)4 1 36 41
Report Preparation 8 8 30 4 50
Present Results to City of La Porte 4 4 10 18
Update Report to address Agency Comments 4 4 10 18
Coordination/Progress Meetings (4 Meetings)4 4 8
0
0
0
0
0
SUBTOTAL STUDY PHASE 0 80 40 0 280 8 0 0 0 0 408
HOURS SUB-TOTALS 0 80 40 0 280 8 0 0 0 0 408
CONTRACT RATE PER HOUR (INCLUDE AVG HOURLY RATE TIME OVERHEAD AND FF)-$ 250.00$ 225.00$ -$ 150.00$ 110.00$ -$ -$ -$ -$
TOTAL LABOR COSTS -$ 20,000.00$ 9,000.00$ -$ 42,000.00$ 880.00$ -$ -$ -$ -$ 71,880.00$
% DISTRIBUTION OF STAFFING 0.00% 27.82% 12.52% 0.00% 58.43% 1.22% 0.00% 0.00% 0.00% 0.00%100%
BASIC SERVICES SUBTOTAL 71,880.00$
OTHER DIRECT EXPENSES QTY UNIT RATE COST
Subconsultant - Traffic Data Collection (13-hr counts per intersection @ $1,200/intersection)(Gram Traffic)12 each 1,200.00$ 14,400.00$
Toll Charges 0 each -$ -$
Standard Postage 0 letter -$ -$
Certified Letter Return Receipt 0 each -$ -$
Courier Services 0 each -$ -$
ODE SUBTOTAL 14,400.00$
TRAFFIC SUMMARY
TOTAL BASIC SERVICES 71,880.00$
TOTAL OTHER DIRECT EXPENSES 14,400.00$
TOTAL 86,280.00$
Project
Controls/Administ
rative
Corridor Study - Main Street (Business SH-146)
HR Green
2025-03-04
SR. Traffic
Engineer
Project
Manager
Engineer 1 -
Traffic
Engineer
Page 1 of 1 LOE
EXHIBIT D
LA PORTE REDEVELOPMENT AUTHORITY,
CITY OF LA PORTE, TEXAS
AGENDA MEMORANDUM
TO: La Porte Redevelopment Authority Board of Directors
FROM: Zone Administrator
SUBJECT: Agenda Item Materials
LA PORTE REDEVELOPMENT AUTHORITY
c/o Hawes Hill & Associates LLP
P.O. Box 22167
Houston TX 77227-2167
713-595-1200 or FAX 281-888-6314
6. Receive Bookkeeper’s Report and consider approval or other action regarding authority invoices.
La Porte Redevelopment Authority
Statement of Revenue & Expenditures - Actual vs. Budget
February 2025
Feb 25 Budget Oct - Feb 25 YTD Budget Annual Budget
Income
4000 · Tax Increments - County 107,237.00 107,237.00 536,185.00 536,185.00 1,286,848.00
4010 · Tax Increments - City 215,552.00 215,552.00 1,077,760.00 1,077,760.00 2,586,623.00
4020 · Tax Increments - ISD 328,971.00 328,971.00 1,644,855.00 1,644,855.00 3,947,649.00
4100 · Interest Income 62,904.50 58,333.00 363,528.90 291,665.00 700,000.00
Total Income 714,664.50 710,093.00 3,622,328.90 3,550,465.00 8,521,120.00
Expenses
TIRZ M&O Expenses
6010 · Administration & Project Mgmt 4,000.00 4,000.00 20,000.00 20,000.00 48,000.00
6015 · Legal 0.00 2,083.00 8,382.00 10,415.00 25,000.00
6020 · Agreed Upon Procedures Report 0.00 917.00 0.00 4,585.00 11,000.00
6025 · Annual Audit 0.00 958.00 11,700.00 4,790.00 11,500.00
6040 · Operating Expenses 292.95 250.00 1,145.74 1,250.00 3,000.00
6045 · Bank Fees 217.00 183.00 1,085.20 915.00 2,200.00
6050 · Planning Services 0.00 2,500.00 25,000.00 12,500.00 30,000.00
Total TIRZ M&O Expenses 4,509.95 10,891.00 67,312.94 54,455.00 130,700.00
Transfers
6101 · City Administration 10,778.00 10,778.00 53,890.00 53,890.00 129,331.00
6110 · Educational Facilities 38,474.00 38,474.00 192,370.00 192,370.00 461,687.00
Total Transfers 49,252.00 49,252.00 246,260.00 246,260.00 591,018.00
Capital Improvement Projects
6131 · M Street Improvement Project 0.00 45,833.00 336,095.88 229,165.00 550,000.00
6132 · Feasibility Study 0.00 5,000.00 80,138.10 25,000.00 60,000.00
6133 · Lakes at Fairmont Greens 0.00 0.00 20,292.95 0.00 0.00
6134 · Infrastructure & Capital Proj.0.00 250,000.00 0.00 1,250,000.00 3,000,000.00
TIRZ Developer Reimbursements
6152 · Beazer Homes Texas LP 0.00 11,831.00 0.00 59,155.00 141,972.00
6153 · Senior Associates 0.00 1,010.00 0.00 5,050.00 12,126.00
6154 · Jabez-LB1 LLC 0.00 23,340.00 0.00 116,700.00 280,082.00
6155 · Hawthorne at La Porte 0.00 65,128.00 0.00 325,640.00 781,542.00
6161 · 92 Fairmont Lakes, Inc.0.00 27,036.00 0.00 135,180.00 324,429.00
Total TIRZ Developer Reimbursements 0.00 128,345.00 0.00 641,725.00 1,540,151.00
Total Capital Improvement Projects 0.00 429,178.00 436,526.93 2,145,890.00 5,150,151.00
Total Expenses 53,761.95 489,321.00 750,099.87 2,446,605.00 5,871,869.00
Net Income 660,902.55 220,772.00 2,872,229.03 1,103,860.00 2,649,251.00
Page 1
La Porte Redevelopment Authority
Bank Registers
As of March 13, 2025
Type Date Num Name Memo Amount Balance
1001 · Amegy Bank Operating 24,364,760.35
Check 02/21/2025 DEBIT Amegy Bank January Acct Analysis Fee -217.00 24,364,543.35
Deposit 02/28/2025 DEP Amegy Bank February Interest 62,904.50 24,427,447.85
Bill Pmt -Check 03/13/2025 1053 Hawes Hill & Associates LLP February 2025 Prof Consulting & Admin Fee -4,292.95 24,423,154.90
Total 1001 · Amegy Bank Operating 58,394.55 24,423,154.90
TOTAL 58,394.55 24,423,154.90
Page 2
La Porte Redevelopment Authority
Contract Status Report
As of March 13, 2025
Invoice Amount Contract
Date Invoice #Invoiced Balance
J. Morales Inc.
M Street Improvement Project - Engineering Services
2/20/2020 19704, 19772 42,000.00
4/20/2020 19820, 19853 24,000.00
12/14/2020 20053 12,000.00
5/11/2021 20212, 20264 8,400.00
9/10/2021 20431 1,096.00
7/6/2022 20934 2,400.00
89,896.00
Gauge Engineering, LLC
M Street Improvement Project - Task Order No. 1
Miscellaneous Tasks & Bid Phase
Original Contract Amount 15,450.00
9/29/2022 2027 (2,855.00) 12,595.00
(2,855.00) 12,595.00
Gauge Engineering, LLC
M Street Improvement Project - Task Order No. 2
Design and Bid Phase Services
Original Contract Amount 217,660.50
12/7/2022 2068 (7,908.20) 209,752.30
1/30/2023 2181 (39,981.24) 169,771.06
6/16/2023 2340, 2402, 2438 (90,711.96) 79,059.10
9/18/2023 2494, 2557, 2604 (45,841.33) 33,217.77
11/14/2023 2677 (15,273.54) 17,944.23
10/31/2023 2772 (18,044.23) (100.00)
(217,760.50) (100.00)
Gauge Engineering, LLC
M Street Improvement Project - Task Order No. 3
Construction Phase, Materials Testing and Management & Inspection Services
Original Contract Amount 398,725.00
12/15/2023 2843 (12,000.00) 386,725.00
2/16/2024 2961 (1,289.20) 385,435.80
4/2/2024 3078 (21,247.58) 364,188.22
5/1/2024 3158 (31,894.61) 332,293.61
6/5/2024 3260 (34,554.58) 297,739.03
7/2/2024 3332 (45,417.13) 252,321.90
7/31/2024 3397 (65,861.86) 186,460.04
8/31/2024 3478 (43,239.54) 143,220.50
9/30/2024 3557 (48,546.79) 94,673.71
10/31/2024 3638 (42,998.33) 51,675.38
11/30/2024 3719 (36,331.62) 15,343.76
12/31/2024 3798 (8,094.64) 7,249.12
1/31/2025 3867 (2,932.35) 4,316.77
(394,408.23) 4,316.77
Page 3
La Porte Redevelopment Authority
Contract Status Report
As of March 13, 2025
Invoice Amount Contract
Date Invoice #Invoiced Balance
Gauge Engineering, LLC
M Street Improvement Project - Task Order No. 4
Feasibility Study
Original Contract Amount 159,790.00
5/1/2024 3159 (1,147.25) 158,642.75
6/5/2024 3261 (17,066.75) 141,576.00
7/2/2024 3331 (15,035.63) 126,540.37
7/31/2024 3398 (12,535.93) 114,004.44
8/31/2024 3479 (9,443.29) 104,561.15
9/30/2024 3558 (24,423.05) 80,138.10
10/31/2024 3639 (80,138.10) -
(159,790.00) -
Gauge Engineering, LLC
M Street Improvement Project - Task Order No. 5
Lakes at Fairmont Green Detention Basin Evaluation
Original Contract Amount 11,400.00
7/2/2024 3330 (1,930.80) 9,469.20
7/31/2024 3399 (5,192.00) 4,277.20
8/31/2024 3480 (2,984.00) 1,293.20
ADD: Topo Survey/QAQC/Sub Mgmt 20,136.00 21,429.20
10/31/2024 3637 (9,174.40) 12,254.80
11/30/2024 3721 (11,118.55) 1,136.25
(10,263.75) 1,136.25
Carter Construction
M Street Improvement Project - Construction Services
Original Contract Amount 2,491,925.00
3/31/2024 Pay App #1 (81,710.00) 2,410,215.00
4/30/2024 Pay App #2 (849,184.30) 1,561,030.70
5/31/2024 Pay App #3 (501,782.50) 1,059,248.20
6/30/2024 Pay App #4 (225,060.00) 834,188.20
7/31/2024 Pay App #5 (9,048.00) 825,140.20
8/31/2024 Pay App #6 (112,004.85) 713,135.35
9/30/2024 Pay App #7 (338,371.00) 374,764.35
10/31/2024 Pay App #8 (214,593.94) 160,170.41
11/30/2024 Pay App #9 (31,145.00) 129,025.41
1/31/2025 Pay App #10 - 129,025.41
2/6/2025 Change Order #1 (129,025.41) -
(2,491,925.00) -
Total Remaining Contract Balances 17,948.02
Page 4
Paid with Check #1053
Paid with Check #1053
Paid with Check #1053
Paid with Check #1053
LA PORTE REDEVELOPMENT AUTHORITY,
CITY OF LA PORTE, TEXAS
AGENDA MEMORANDUM
TO: La Porte Redevelopment Authority Board of Directors
FROM: Zone Administrator
SUBJECT: Agenda Item Materials
LA PORTE REDEVELOPMENT AUTHORITY
c/o Hawes Hill & Associates LLP
P.O. Box 22167
Houston TX 77227-2167
713-595-1200 or FAX 281-888-6314
7. Receive updates from the city, developers, and staff about development within the Zone.