Loading...
HomeMy WebLinkAboutCLP_RZ01 apvd min 10.09.2025MINUTES OF THE JOINT MEETING OF THE LA PORTE REDEVELOPMENT AUTHORITY and LA PORTE TAX INCREMENT REINVESTMENT ZONE BOARD OF DIRECTORS October 9, 2025 DETERMINE QUORUM; CALL TO ORDER. The Board of Directors of the La Porte Redevelopment Authority, City of La Porte, Texas, and La Porte Tax Increment Reinvestment Zone, held a regular joint meeting, open to the public, on Thursday, October 9, 2025, at 6:00 p.m., in the Council Chambers of City Hall, 604 West Fairmont Parkway, La Porte, Texas, and the roll was called of the duly appointed members of the Board, to -wit: Position 1 Position 2 Position 3 Position 4 Position 5 Peggy Antone, Secretary Barry Beasley Joshua Lege Kent Remmel Nicole Havard Position 6 Position 7 Position 8 Position 9 Mark Goodwin, Chairman Mercy Estrada, Vice -Chair DeeAnne Thomson Kristen Lee, Asst. Secretary and all of the above were present, with the exception of Directors Beasley, Lege, Remmel and Thomson, thus constituting a quorum. Also present were David Hawes, and Linda Clayton, Hawes Hill & Associates, LLP; Matt Daeumer, and Sherry Rodriguez, City of La Porte. Chairman Goodwin called the meeting to order at 6:00 p.m. RECEIVE PUBLIC COMMENTS. There were no public comments. APPROVE MINUTES OF THE JOINT LA PORTE REDEVELOPMENT AUTHORITY AND LA PORTE TAX INCREMENT REINVESTMENT ZONE MEETING HELD ON SEPTEMBER 11, 2025. Upon a motion made by Director Estrada, and seconded by Director Antone, Directors Antone, Goodwin, Estrada and Lee voted to approve the Minutes of the September 11, 2025, Board meeting, as presented. Director Havard abstained. The motion passed. CONSIDER AMENDED INTERLOCAL AGREEMENT WITH HARRIS COUNTY REGARDING COUNTY PARTICIPATION. Mr. Hawes reviewed Amendment No. 1 to Interlocal Agreement with Harris County regarding the County's participation in the zone. He reported the amendment includes extending the County's participation for the life of the Zone and changing the rate to 100%. Upon a motion made by Director Antone, and seconded by Director Estrada, the Board voted unanimously to approve Amendment No. 1 to Interlocal Agreement with Harris County, as presented. RECEIVE UPDATE AND RECOMMENDATIONS FROM HR GREEN ENGINEERING: Mr. Hawes presented HR Green's Progress Report, included in the Board materials. a. Lakes at Fairmont Green Detention. Mr. Hawes reported the project has been advertised for bids and will be ready to award a construction contract at the November meeting. No action from the Board was required. b. 16th Street Intersections. Mr. Hawes reported HR Green is finalizing the drainage analysis is being submitted to the County and City for review by the end of this month. No action from the board was required. c. Main Street Mr. Hawes reported HR Green met with the City to review the roadway schematics and traffic analysis. He reported the City will be conducting community outreach. No action from the Board was required. DISCUSS AND AUTHORIZE STAFF TO ISSUE REQUEST FOR QUALIFICATIONS (RFQ) FOR FEASIBILITY STUDY FOR LAZY RIVER. Mr. Daeumer reported the lazy river project would require 4 to 6 acres of land to construct and the estimated costs for construction range between $3.5 to $4.5 Million. He reported the optimal location for the lazy river would be located on the site with the wave pool and there is not enough acreage available for the construction of a lazy river. No action was taken by the Board. 6:09 p.m. Director Lege arrived meeting. RECEIVE BOOKKEEPER'S REPORT AND CONSIDER APPROVAL OR OTHER ACTION REGARDING AUTHORITY INVOICES. Mr. Hawes presented the Bookkeeper's Report and reviewed invoices for payment, included in the Board materials. Upon a motion made by Director Havard, and seconded by Director Lege, the Board voted unanimously to accept the Bookkeeper's Report and approved payment of invoices, as presented. RECEIVE AND CONSIDER RESPONSES TO REQUEST FOR QUALIFICATIONS AND PROPOSALS FOR BOOKKEEPING SERVICES; AWARD CONTRACT; AND AUTHORIZE EXECUTION OF CONTRACT. Mr. Hawes reviewed the Memorandum regarding responses to request for qualifications and proposals for accounting services, a copy of the Memorandum is attached hereto as Exhibit A. After full review by the Board, and upon a motion made by Director Lege, and seconded by Director Estrada, the Board voted unanimously to award a contract to McLennan & Associates LLC for accounting services in the amount of $1,500 per month, plus reimbursable expenses; and authorized execution of the agreement with McLennan & Associates LLP. RECEIVE UPDATES FROM THE CITY, DEVELOPERS, AND STAFF ABOUT DEVELOPMENT WITHIN THE ZONE. None. ADJOURNMENT. There being no further business to come before the Board, Chairman Goodwin adjourned the meeting at 6:22 p.m. List of Exhibits: A. Memo to Board of Directors regarding responses to RFQ/RFP for Accounting Services 2IPage LA PORTE TIRZ & REDEVELOPMENT AUTHORITY TAX INCREMENT REINVESTMENT ZONE No. 1, CITY OF LA PORTE, TEXAS 0 a) a) cu Ll Y Cn U CO O X Lo C.).) W N y CU vi O yN Okj5w '5 8 a o co u COMOW Accounting Services OOOGQW FwLZOG o� 4., N a) a) 0, m a) Nh 0 1+ Sr a) En . a. in 0 N +' O'O N a) O N CI N s. 0. O O y 3 to LI. n O. Ix 00 o a � U_ a) G) 0 y O bD 0 a) cu 0 O UCCS a) Y+ Ca 0 L. y a) 0 b[) 0. 4-4 O h O rn 0. CU o0. ¢ U 44, •-• Y. 0. o b13 O cn O O U 0 c O G � N u O aoi as':T. u) a) O ya i+ a) U C~ is O a3 E )b0 a.) O: 0 ra o U a) 01 -. H y O w c a VI Cr 0 The following qualifications and proposals were submitted for consideration: Additional Comments/Consideration Additional Fees $105.00 per hour for additional work requested: • Annual Budget preparation (if applicable). • Preparation of records for annual audit. • Special worksheets requested to be added to reports. • Special requests by Board of Directors. • W-2 forms, 1099s, unclaimed property, and other state and local compliance. • Out of Pocket expenses (considered extraordinary) will be billed at cost. Board of Directors approval will be requested prior to incurring any extraordinary expenses. a) w $1,950 per month, plus reimbursable expenses On January 1 of each year following initial term, monthly fee shall increase at a rate equal to 5% 0 0. O G �C a) I-. O y S3. rtl En O to E 044, s. al d u O r0 C 0 in I 0 a) U 0col U rn "Li C�. .,+ O = a, O w Cc 44. bA cu N y 0 a L. a)_ 1. a.cn a) U O cocNI I a) + Ca Accounting Firm ETI I3ookkeeping McLennan & Associates, LLC cn 0 Ti 0 E 0 O a) e rn cu 'O 9 O as w O + 0 z O 0 cu O to N au ✓ bA O • 0 i. .O 3� d 0-i l O N CU i;r The followin