HomeMy WebLinkAboutSAN JACINTO COLLEGE SITE PLAN (2)z
Z �
w �
a u'
o m
x �
z
PROP, I
RCP ST
3
a
Q
0
N
r
O
a
o
0
N
N.0
V
O
C
0
0
°i
m0-
ci
�O
-o
!r
_
O
03
/
O
N
U
O)
O
L�
Q
FL
EXIST. BAKER DRIVE
STM. SWR. SYSTEM
DRAINS TO LUELLA BLVD.
Beinony
C.melwy
e wl
SAN JACINTO COLLEGE
W VICINITY MAP
z N.T.S.,
HARRIS COUNTY KEY MAP: 578C
U
1m 0 50 top 200
SCALE: 1"=100'
CITY APPROVING AUTHORITY CERTIFICATE
THIS IS TO CERTIFY THAT THE CITY OF LAPORTE, TEXAS HAS
APPROVED THIS SITE PLAN AND DEVELOPMENT OF
IN CONFORMANCE WITH THE ORDINANCES OF THE
CITY OF LA PORTE.
BY: DEPARTMENT O)
DI CT Pl
SITE PLAN ACCURACY CERTIFICATE
1, QQ02W J. PrI*M2&*c AM REGISTERED UNDER THE LAWS OF
THE STATE OF TEXAS TO PRACTICE THE PROFESSION OF
ENGINEERING AND HEREBY CERTIFY THAT THE ABOVE SITE PLAN
IS TRUE AND CORRECT, AND THAT ALL BEARINGS, DISTANCES,
ANGLES, CURVE RADIUSES, AND CENTRAL ANGLES ARE
ACCURATELY SHOWN ON THE PLAT,
oadQiLc,-_
Z-U-01
TEXAS REGISTRATION NO. 44001
)WALD JI PRIMOSIC
.....•.••....... .5
44001 : 4V
CONSULTING ENGINEERING
15915 KATY FREEWAY
SUITE 440 PHONE: (281) 578-9595
HOUSTON, TX. 77094 FAX. (281) 578-9686
REFERENCE: BENCHMARK: RM 970 — USC & GS DISK SET
IN CONCRETE AT THE NORTHEAST CORNER OF RED BLUFF
ROAD AND FAIRMONT PARKWAY. ELEV.= 25.38
TBM—"A" BOX CUT ON "BB" INLET.ON THE WEST SIDE OF
LUELLA BOULEVARD, 1200' NORTH OF FAIRMONT PARKWAY.
ELEV.= 22.96
TBM—"B" NORTH BOLT ON FIRE HYDRANT LOCATED AT THE
NORTHEAST CORNER OF LUELLA BOULEVARD AT VENTURE
LANE.
ELEV.= 27.03
l TBM—"C" RAILROAD SPIKE IN POWER POLE LOCATED 100'
SOUTH OF OAKHAVEN DRIVE ON THE WEST RIGHT—OF—WAY
OF LUELLA BOULEVARD.
ELEV. = 26.49
TBM—"D" RAILROAD SPIKE IN POWER POLE LOCATED 50'
EAST OF THE SOUTHEAST CORNER OF THE HEALTH
SCIENCES BLDG. ON THE WEST RIGHT—OF—WAY OF LUELLA
BOULEVARD.
ELEV.= 26.98
TBM—"E" RAILROAD SPIKE IN POWER POLE LOCATED AT
THE NORTHWEST CORNER OF LUELLA BOULEVARD AT
BAKER DRIVE.
ELEV.= 28.46
TBM—"F" BOX CUT IN CONCRETE BASE FOR LIGHT
STANDARD LOCATED 200' EAST OF THE CENTERLINE OF
MILLER ROAD, 275' SOUTH OF THE SOUTH
RIGHT—OF—WAY OF SPENCER HIGHWAY.
ELEV.= 31.91
TBM—"G" RAILROAD SPIKE IN THIRD POWER POLE SOUTH
OF SPENCER HIGHWAY IN THE CUNNINGHAM DRIVE
RIGHT—OF—WAY.
ELEV.= 32.32
TBM—"H" RAILROAD SPIKE IN POWER POLE LOCATED 150'
WEST AND 40' NORTH OF THE NORTHWEST CORNER OF
LEE DAVIS LIBRARY.
ELEV.= 31.06
TBM—"I" BOX CUT IN CONCRETE BASE OF THIRD LIGHT
STANDARD SOUTH OF SPENCER HIGHWAY ON ABSHIER
DRIVE.
ELEV.= 31.45
TBM—"J" BOX CUT ON BACK OF CURB LOCATED 50'
SOUTH OF THE NORTHEAST CORNER OF BAKER DRIVE AT
MILLER BOULEVARD.
ELEV.=29.71
TBM—"K" BOX CUT ON NORTHWEST CORNER OF CONCRETE
WING WALL, 250' EAST OF CUNNINGHAM DRIVE ON SOUTH
RIGHT—OF—WAY OF SCHOCHLER DRIVE.
ELEV.=28.14
TBM—"L" BOX CUT ON BACK OF CURB LOCATED 75'
SOUTHEAST OF THE SOUTHWEST CORNER OF THE JACK W.
ANDERSON VOCATIONAL/TECHNICAL BLDG.
ELEV.= 27.74
TBM—"M' BOX CUT IN CONCRETE PAD OF TRACK LOCATED
10' NORTH -OF HE SOUTHWEST CORNER ON THE WEST END
OF THE STARTING AREA ON THE WEST END OF THE
TRACK.
ELEV.= 27,59
TBM—"N" BOX CUT IN CONCRETE BASE FOR I —BEAM
BLEACHER SUPPORT LOCATED AT THE CENTER OF THE
EAST END OF THE BLEACHERS ON THE NORTH SIDE OF
THE TRACK.
ELEV.= 29.32
TBM—"O" BOX CUT IN CONCRETE LOCATED AT THE
SOUTHEAST CORNER OF SIDEWALK, 40' EAST AND 45'
NORTH OF THE NORTHEAST CORNER OF THE FRANCIS G.
ANDERS PHYSICAL EDUCATION BLDG.
ELEV.= 28.23
TBM—"P" SOUTHEAST BOLT ON LIGHT STANDARD LOCATED
35' SOUTH AND 20' EAST OF THE SOUTHEAST CORNER OF
THE GILBERT C. McCOLLUM CLASSROOM BLDG. (EAST
WING)
ELEV.= 30.44
TBM—"Q" BOX CUT ON CONCRETE SWALE LOCATED 75'
EAST AND 25' NORTH OF THE NORTHEAST CORNER OF
THE LEE DAMS LIBRARY,
ELEV.= 28.63
TBM—"R" NORTHEAST BOLT ON LIGHT STANDARD LOCATED
65' EAST OF THE WILBURN C. FRELS SCIENCE BLDG. AND
95' NORTH OF THE MNCENT C. HENRICH SCIENCE BLDG.
ELEV.= 29.72
TBM—"S" BOX CUT ON SOUTHWEST CORNER OF CONCRETE
PAD FOR GENERATOR AT THE WEST END OF TRACK,
ELEV.= 27.75
TBM—"T" RAILROAD SPIKE IN POWER POLE LOCATED 1145'
SOUTH AND 90' EAST OF VOCATIONAL BLDG NO. 2.
ELEV.= 24.91
ACCORDING TO F.I.R.M. COMMUNITY PANEL NO.
48201CO940 J , THE SUBJECT TRACT LIES IN "ZONE X"
AN AREA DETERMINED TO BE OUTSIDE THE 500—YEAR
FLOODPLAIN. EFFECTIVE DATE: NOVEMBER 6, 1996
gQ�.. 3pCl NTp 00
PAS TR ICl
CENTRAL CAMPUS
CONSTRUCTION OF
PARKING AREAS AND
DRAINAGE FACILITIES
SAN JACINTO COLLEGE
PASADENA, TEXAS
8060 SPENCER HIGHWAY
SITE PLAN
INU.I UAIt I REVISIONS I BY
DRAWN BY: GG
DESIGNED BY. SAH
PROJECT NO.: 726-0015
SCALE: 1 "-100'
CHECKED BY: OAS
APPROVED BY: RKS
DATE: JANUARY 2001
SHEET 1 OF 1
00
N LL
00- BaSo