Loading...
HomeMy WebLinkAboutRECORDS STORAGE FACILITY ADD'L DRIVEWAYCITY OF LA PORTE SITE PLAN BLOCK 160 SCALE: 1"=10' MINOR DEVELOPMENT SITE PLAN FOR CITY OF LA PORTE RECORDS STORAGE FACILITY AT BLOCK 177, TOWN OF LA PORTS BEING A 0.41 ACRE TRACT OUT OFHHHHHHHHU THE JOHNSTON HUNTER SURVEY, A-32 �F \ :I \ CITY OF LA PORTS, HARRIS COUNTY, TEXAS 3,000 PSI CONCRETE T E X AS FND. 5/8" I.R. FND. 5/8" I.R. #4 BARS @ 18" O.C. EA. WAY -16" LAPS 604 W. FAIRMONT PKWY. F.H. \ \\ \ \� 8" WATER LINE ° ° ° ° o ° p ° b.° ° ° 5'� — 6 LIME STABILIZED SUBGRADEImtoi " _TII 6" —CONTINUE V—Ow BEYOND EDGE OF —PAVING ••m Q - % — E EC LA PORTS. TEXAS PLANNING DEPARTMENT ENGINEERING DIVISION TYPE D ASPHALT " " TOP SHORT OF STREET NtK SOUTH "I" � (609 STREET R•0•W•) �� � °`� CONC. PAVING DETAIL N.T.S. 1'-3" - 1'-3" d ' ••�• STORM JUNC. Box � EXIST. TOP OF BANK 77777°c a EXIST. TOP PROP. 20 L.F. Qf 18" RCP \ R 15' p� OF BANK EXIST. TOP OF BANK o`� `� FORM JOINT SEAL WITH REMOVABLE VINYL SCREENED CAP-SHEPLERS #8151 24 GA. CONT. JOINT SEALANT GALV. KEY _ VICINITY MAP \ • 0 W � (\ CQ d O d � d ✓ / M ° M �( d ° d ° OF DITCH_ d °_ -d- .__ - ° - - „ 15 �x � \\ °, ° EXIST. TOP EXIST. TOP OF BANK C.J. 13.91 13,97 13.97 d ° EAST —21'-0" a ► " d 22'-8"_ SWALE � ° d a N a 13.78 d d a C . ° 10' BUILDING LINE q d ^; 13.78 N E.J. 13.72 °, a �� a REMOVE & DISPOSE PROP. 6 CONC. OF EXISTING CURB 0 d ° DRIVE d 0 d a X a d 00 ° ° d \ 2 � 4 DRAIN. R15' N C. J • TO SWALE WHEEL STOP T(i YP.) E.J. V,� l h �, => 5.07 • L ASPHALT 3c.j. 4 ;� N I ( CONC. PARKING LOT 15.07 \� 15.18 • � � H / C c3 w w " �� �� �� �� z CD o J 0 _ Z m o N ( "I OF DITCH : v R.C.P. EXIST. TOP OF BANK OF BANK 9 99 20-0 125 -0 ' w 30,E 1/2" CONC. ON 10'-61/2" / I T CONC. STOOP � � �N / Ld z � � "AF `� / m I o CONCRETE / C/U PAD / I EXISTING "� 3/4" w.L. RECORD177711 14.07 STORAGE o / FAC I LI LTY J I � r � F.F. ELEV = 15.22 N " 4S.S. —6' � „� I X �� � 0 1/2w I I I CONC. = STOOP?till 11 T \ � z \ I °° ° ° N ° 5�� ° ° ° p ° 2-6 DEFORMED TIE BAR ' " SAME DIA. AND SPACING AS PAVING REINFORCING LAP 10 W/REINF. PAVING CONTROL JOINT N.T.S. LOAD TRANSMISSION UNIT NAIL HOLE SHEPLERS JR. SIZE L.T.U. OR EQUAL 17/32 DIA O O TOP VIEW JOINT SEAL FRONT VIEW w NAIL 1 TOOL EDGE 11C R. PRESSED ON BAR LOOSE FITC.U. 5° 100SMOOTH BAR 1w TUBE STEEL TO MEET AST STD. SPECS. FOR CONC. INF. R.W. EXP. JT. FILLER BAR UNITS TO BE 22" C. 10" PAVING EXPANSION JOINT DETAIL N.T.S.APPROACH CONTINUE COMPACTED LIME STABLILIZED SUBGRADE 1'-0" BEYOND BACK OF CURB 2° 6" 7F� TOOL EDGE #4 BAR CONTINOUS °PLAN ° #4 CURB STEEL „ e SUPPORT @ 24" O.C. 6 SCH. PAVING & REINF. ° ° ° ° ° � 5" ° o ° ° 0 ° ° ° ° ° ° — - — LEGEND �� �� EXISTING ELEVATION 13.57 PROPOSED ELEVATION } FIRE HYDRANT "X" FLOOD ZONE DESIGNATION --------- WATERLINE SANITARY SEWER _ — — — _ — — — _ STORM SEWER LINE FLOOD ZONE LINE FLOOD STATEMENT THE SUBJECT PROPERTY APPEARS TO LIE PARTIALLY WITHIN THE 100-YEAR FLOOD PLAIN ZONE "AE", BFE 14.3AS PER THE FLOOD INSURANCE MAP, COMMUNITY PANEL NO.48201C0945J, DATED NOVEMBER 8, 1998. WARNING: THIS STATEMENT IS BASED ON SCALING THE LOCATION ON THE ABOVE -REFERENCED MAP. THIS INFORMATION IS TO BE USED TO DETERMINE FLOOD INSURANCE RATES ONLY, AND IS NOT INTENDED TO IDENTIFY SPECIFIC FLOOD CONDITIONS. UTILITY NOTE: THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON ABOVE -GROUND STRUCTURES AND UTILITY LOCATIONS BY UTILITY COMPANIES. UTILITIES/STRUCTURES MAY VARY FROM LOCATIONS SHOWN HEREON. ADDITIONAL BURIED UTILITIES/STRUCTURES MAY BE ENCOUNTERED. NO EXCAVATIONS WERE MADE DURING THE PROCESS OF THIS SURVEY TO LOCATE BURIED UTILITIES/STRUCTURES. NAME OF DEVELOPMENT: CITY OF LA PORTE RECORDS STORAGE FACILITY TYPE OF DEVELOPMENT: MUNICIPAL RECORDS STORAGE OWNER: CITY OF LA PORTE LEGAL DESCRIPTION: BLOCK 177, LOTS 1,4 & PART OF 5&6, TOWN OF LA PORTS ADDRESS: 1001 S. 4th STREET ZONING: GC - GENERAL COMMERICAL REF. T.B.M. ELEV: 13.02 I TOP N. END 18" R.C.P. @ N.E. CORNER W. "" ST. & S. 4th ST. REVISIONS NO REVISION / ISSUE DATE 0 ORIGINAL ISSUE 02/04 PROPOSED PROPOSED ADDITIONAL DRIVE FOR THE RECORDS STORAGE FACILITY 1001 S. 4th STREET LA PORTS, TEXAS SITE DRAWN BY: J.R. CHECKED BY: B.S. APPROVED BY: RAC PROJECT: 2004-2204 SHEET: I FUTURE EXPANSION � � ' = H D 13.0, TIE. +0.10' � =HOLD 13.02 SPECIFIC FLOOD CONDITIONS 1 O F 1 DATE: 02/O A �F HCAD MAP #: 6253-A C CONCRETE CURB DETAIL N.T.S. SCALE 1 — 1 0