Loading...
HomeMy WebLinkAbout5-POINTS PLAZA AS-BUILT PLANSFive Points South Gate - Broadway Gate - Pavilion 101 South Broadway, La Porte, TX 77571 11 CONTRACTOR: C.F. JORDAN COMMERCIAL, LP 9801 WESTHEIMER SUITE 320 HOUSTON, TX 77042 P: 832.615.1270 F: 832.615.1271 ARCHITECT: URS GROUP INC. 9801 WESTHEIMER SUITE 320 HOUSTON, TX 77042 P: 713.914.6699 F: 713.789.8404 SUB -CONTRACTOR: TFC CANOPY 1107 NORTH TAYLOR ROAD GARRETT, IN 46738 P: 800.832.3212 P.M.: KEITH MOUGHLER E-MAIL: kmoughlei@centurionind.com DTLR: MELISSA COOK E-MAIL: mcook@centurionind.com BROADWAY GATE T.F.C. CANOPY'S GENERAL NOTES 1. All dimensions to be field verified prior to production 2. All field dimensions are to be performed after finish sheathing, drywall, brick, doors and windows are installed. 3. There is a (4 - 6) FOUR to SIX WEEK lead time for materials to be on -site after approval drawings are changed according to field dimensions taken. 4. Panel dimensions are subject to change after field dimensions. 5. Panel labeling/numeric identification (71") is subject to change after field dimension verification. 6. ACM (Aluminum Composite Material) Panels are to be: : 4mm REYNOBOND CHAMPAGNE METALLIC ACM PANEL 7. All ACM panels have been drawn to best utilize the full sheet size of each color. 8. ACM SYSTEM for this job is "DRY (EXTRUSION)" SYSTEM. 9. Abbreviation W.I.F." = VERIFY IN FIELD 10. Abbreviation "C.T.F." = CUT TO FIT 11. Grace Ice & Watershield provided by T.F.C. IIIIIIIIIIIIII IIIIIIIIIII II III fA5{TA IF)Hi(i1s�S':�X PAVILION DRAWING INDEX: A1.0 = PAVILION FLOOR PLANS Al.1 = SOUTH GATE FLOOR PLAN A1.2 = BROADWAY GATE PLANS A2.0 = PAVILION ELEVATIONS A2.1 = PAVILION ELEVATIONS A2.2 = SOUTH GATE ELEVATIONS A2.3 - BROADWAY GATE ELEVATIONS A3.0 - PAVILION & S. GATE SECTIONS A3.1 = SOUTH GATE SECTIONS A3.2 = BROADWAY GATE SECTIONS A4.0 = CONNECTION DETAILS APPROVAL DRAWINGS NOT FOR CONSTRUCTION PLEASE VERIFY THE DESIGN & SCOPE OF WORK. MARKUP IF NEEDED, SIGN AND PLEASE RETURN. ATURE: DATE: AS SHOWN ❑ AS NOTED PRODUCTION COPY INSTALLER COPY PROJECT MANAGER COPY FILE COPY PAVILLION- TOP PLAN $GALE: 114'=1'-V' NORTH m M M M N N r M) M z 0 a 5 W¢� F � N z 0 a ASH w > IX C op p a 00 x F 0 PAVILION TOP PLAN JOB7k. 601119 DATE: 114"=1'-0 SCALE: VARIES ORANM BV: MFC A1.0 z Az.z T T T q T T I q I_51 * 1 1 If. I'I 47f' 48- 47-k 15" 6 A2.3 SOUTHGATE - TOP PLAN SCALE: 114"=1'-0' T T T T T TT T 15" . 48j' I 48" I 46j' 11, 0 SOUTHGATE - SOFFIT PLAN AZ.3 SCALE: 1W=1'4" NORTH z 0 a 5 W¢� F N F c7An z 0, a Q � w > C14 rZ pp0� a 00 x F x 0 SOUTH GATE "AS BUILT" DRAWINGS TOP & SOFFIT JOS7k. 691119 - FIELD VERIFED - DATE: w6m THIS DESIGN WAS INSTALLED BASED ON APPROVAL SCALE: 1�4"=1'0' DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DRAWN BV: MFC DTLR: DATE: _ A P. M.: DATE:-111_ �.y . 11 A2.6 WEST NORTH AVL ,Av `T 12 4 11 A2.4 EAST Lo WEST Ln .—L BROADWAY GATE - TOP PLAN AT CANOPY SCALE: 1/7=1'-0' NORTH 13$" 1 1 1111 . 13$„ 9 SOFFIT PLAN @ CANOPY SOFFIT N 1231" 1111 1 1 Jill 1 52 SOUTH BROADWAY GATE - SOFFIT PLAN AT CANOPY SCALE: 1Z=1'-P• 12 2.4 EAST NO TH +e v- cos I O .a 5 - w � Z ¢ o F O 3 W a w SOUTH w 24 o 0 a ¢wa � O x BROADWAY GATE - TOP PLAN ] IN O BROADWAY "AS BUILT" DRAWINGS IGATE PLANS JOBk: 401119 - FIELD VERIFED - DAB: 815/99 THIS DESIGN WAS INSTALLED RASED ON APPROVAL SCALE: iFl"=1'-0' DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DRAWN BY: MFC DTLR: DATE: _ P. M.: DATE: A1 _ i 1 1 • 2 T T o 2 4-m REYNOBOND CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. �NEON LIGHTING SYSTEM $B.O. CANO� BY OTHERS FIBER OPTIC LIGHTING 405" (TYP. @ PRIMARY COLUMNS) BY OTHERS 2'x2'STUCCO COLUMN - (PRIMARY), BY OTHERS 9 1'xl'STUCCO COLUMN (SECONDARY), BY OTHERS z m IIIIIIIIIIIII 1111111111111 w (If I�T E ";fff .0. GRADE w a 1�0 Om m ,D,NORTHWEST ELEVATION AT PAVILION SCALE.114-=V 0 Z DL 41- 10* 1081, 108t 41j- $T.O. PA-1 --------- ----------------- ------------ --------- --------------------- z 4— REYNOBOND CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. P2- P3 NEON LIGHTING SYSTEM ­0 CAN — BY OTHERS FIBER OPTIC LIGHTING (TYP. @ PRIMARY COLUMNS) BY OTHERS 2'x2'STUCCO COLUMN (PRIMARY), BY OTHERS �D I'XI, STUCCO COLUMN > (SECONDARY), BY OTHERS pj 0 0 H.C. ACCESSIBLE RAMP $T.O. GRADEBY OTHERS r PAVILION 14 SOUTHWEST ELEVATION AT PAVILION "AS BUILT" DRAWINGS ELEVATIONS ) SCALE 114-=l-V - FIELD VERIFED - DATE W� THIS DESIGN WAS INSTALLED BASED ON APPROVAL DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DTLR: DATE: P. M.: DATE: 31A2. 11 4 4 4 4 REYNOBOND CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. LIGHTING SYSTEM BY OTHERS OPTIC LIGHTING 'RIMARY COLUMNS) BY OTHERS 3TUCC0 COLUMN ARY), BY OTHERS 3TUCCO COLUMN DARY), BY OTHERS 3 ,SOUTHEAST ELEVATION AT PAVILION A2.2 SCALE:1/4"=V 4 4 4 4 REYNOBOND CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. .IGHTING SYSTEM 3Y OTHERS OPTIC LIGHTING 'RIMARY COLUMNS) 3Y OTHERS STUCCO COLUMN 1RY), BY OTHERS TUCCO COLUMN DARY), BY OTHERS =SSIBLE RAMP 3Y OTHERS nNORTHEAST ELEVATION AT PAVILION A2.2 SCALE: 1/4"=lW m M t• eM Z _ T r M PAVILION "AS BUILT" DRAWINGS ELEVATIONS JOB1k. 491119 - FIELD VERIFED - DATE: 8/5I09 THIS DESIGN WAS INSTALLED BASED ON APPROVAL SCALE: 7l4'=1'-9" DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DTLR: DATE: P. M.: DATE: DRAWN BY: MFC Q 4 4 4 4 Q Q 4 4 44 ITT 4 0 n}" ---------- G25 € ----- 7 - 2 �' - 4mm REYNOBOND CHAMPAGNE METALLIC 2 8 ACM PANELS, BY T.F.C. 24 2 d: - 8 ----------------------- a.1 - 3.1 NEON LIGHTING SYSTEM 1" G BY OTHERS rv� GLASS BLOCK BY OTHERS m M ut n 8g qg� I 48" I 4ayRI 1"4 - ivd ZUMi 10}" NEON LIGHTING "H 10}" 8�" , - 8�" W M LEFT SIDE BYOTHERS RIGHT SIC STUCCO BY OTHERS - K ^ i� CURVED PANEL CURVED PANEL �Q( QLL nWEST ELEVATION AT SOUTHGATE ° tD A2.3 SCALE : lW=1'-0" } N nNORTH ELEVATION AT SOUTHGATE - DRAWN FLAT M A2.3 SCALE: 1/4'=1'-0" Q QQ QQ Q � a Q q4 4Q QQ 4 r -- """--- 17j. 1.,1" 5* 551, 1 , -------------G 5 G26 G26 -------- z / „ a za O 4mm REYNOBOND G 8 F F 2 28 CHAMPAGNE METALLIC (xl 6 n ACM PANELS, BY T.F.C. F 28 G8 24 z Q�� 2 - -------------------- F NEON LIGHTING SYSTEM BY OTHERS [Tr Q O W in GLASS BLOCK BY OTHERS i4j" ¢ O G 9 3#1 U.L t It "I --I— 'WNW x y, 8k47�� �48" qT� ' � � 1`2 St 10" NEON LIGHTING "8 10" LEFT SIDE BY OTHERS RIGHT SICSTUCCO BY OTHERS SOUTHGATE CURVED PANEL CURVED PANEL "AS BUILT" DRAWINGS ELEVATION S JOBp: 401119 - FIELD VERIFED DATE: 915/09 THIS DESIGN WAS INSTALLED BASED ON APPROVAL SCALE: 1/4•=1'-0" �j DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DRAWN BV: MFC nWEST ELEVATION AT SOUTHGATE DTLR: DATE: _ nSOUTH ELEVATION AT SOUTHGATE - DRAWN FLAT AP.3 SCALE:1/4'=1'-0" A A2.3 SCALE: 1/4'=1'-0" P. M.: DATE: ((�1G WEST ELEVATION OF CANOPY !„ AT BROADWAY GATE - DRAWN FLAT ,A2l I SCALE: IA"=1'-0' RADIJEND-L . STUCCO ALL CPY PANELS FIRST RADIUS CORNER END WALL @STUCCO INNER ELEVATION FACES NORTH NORTH ELEVATION AT SOUTH COLUMN nAT BROADWAY GATE A2.4 SCALE:,/4'=1'-0" EAST ELEVATION OF CANOPY i AT BROADWAY GATE - DRAWN FLAT SCALE: 1/4"=1'4" RADIUS CORNER END WALL @STUCCO INSTALL CANOPY PANELS FIRST INNER ELEVATION FACES SOUTH SOUTH ELEVATION AT NORTH COLUMN \AT BROADWAY GATE A2.4 SCALE: 114"=1'-0' RADIUS CORNER END WALL @STUCCO "AS BUILT" DRAWINGS - FIELD VERIFED - THIS DESIGN WAS INSTALLED BASED ON APPROVAL DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DTLR: DATE: P. M.: DATE: z 0 a F C7�n z 0 0 Q�F W > a 5�'. c ta00 w�a �o x F O BROADWAY GATE ELEVATIONS JOBp: 401118 DATE: S/5 SCALE: VARIES DRAWN BY: MFC A2.4 Af 1 PAVILION SECTION A3.1 SCALE: 1-1/2"=1'-0" BY OTHERS ( a1 SECTION AT NORTH GATE A3.1 SCALE: 1-1/2"=V-0" SHIELD T' 1 A40 T^ I1 A40 ICE AND WATER SHIELD ICE AND WATER SHIELD (B (BV TFC) #ENT.1 BA4.0 eFsSOFFIT SOFFIT VENT z OTHERS z BV OTHER�� z SUSPENDED SOFFIT BY 78 SUSPENDED SOFFIT BY OTHERS OTHERS z SECTION AT SOUTH & NORTH GATES A0.1 SCALE: 1-1/2"=V-0" SOFF SUSPENDEI BY OTHERS SECTION AT BROADWAY GATE A0.1 SCALE: 1-V2"=1'-0" s SECTION AT SOUTH GATES A0.1 SCALE: 1-1/2"=V-0" z 0 a z o n o Q�F w > °��a tp00 w�a � O x F O SOUTH GATE "AS BUILT" DRAWINGS ISECTIONS JOBp: 401118 - FIELD VERIFED DATE: &m9 THIS DESIGN WAS INSTALLED BASED ON APPROVAL SCALE: 1-1/C=1'-0• DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORE. DRAWN BV: MFC DTLR: DATE: _ P. M.: DATE: _ A/l� /y J FRAMING CLIP EXTRUSION BY OTHERS 4mm REYNOBOND #„L �J CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. A TYP. HORIZONTAL & VERTICAL JOINT SCALE: 6"=V-0" W ROOF MEMBRANE 4mm REYNOBOND-----_ EYNOBOND I BY OTHERS CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. FINISH CLIP STEEL BY OTHERS WEEP HOLES FRAMING BY OTHERS 1 PARAPET/ROOF SIDE TERMINATION SCALE: 6"=V-0" 4mm REYNOBOND CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. 1}. FRAMING I -I �BY OTHERS - 1_ h�START CLIP r m 1 - Yi TRIM-1 BY T.F.C. WEEP HOLES B STARTER DETAIL SCALE: 6"=V-0" 4mm REYNOBOND 4 / CHAMPAGNE METALLIC / ACM PANELS, BY T.F.C. FINISH CLIP 1" STUCCO �., BY OTHERS STEEL BY OTHERS RIM-1 BY T.F.C. FRAMING BY OTHERS E BROADWAY GATE DETAIL SCALE: 6"=V-0" 1i" -FRAMING BY OTHERS -STUCCO BY OTHERS 4mm REYNOBOND I 1§. CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. C END DETAIL SCALE: 6"=1'-0" TRIM-2 BY T.F.C. FINISH CLIP BY T.F.C. -FINISH CLIP - FRAMING BY OTHERS BY OTHERS I I F SOUTH GATE DETAIL OPTION "A" SCALE: 6"=1'-0" EXTRUSION BY T.F.C. 4mm REYNOBOND CHAMPAGNE METALLIC ACM PANELS, BY T.F.C. FRAMING ATTACHED AT HORIZONTAL JOINTS BY OTHERS WITH EXTRUSION AND CLIP (/-SOUTH GATE DETAIL �` OPTION "B" SCALE:6"=T-0" BY OTHERS -STUCCO BY OTHERS "AS BUILT" DRAWINGS - FIELD VERIFED - THIS DESIGN WAS INSTALLED BASED ON APPROVAL DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DTLR: DATE: P. M.: DATE: DETAILS �B#. 401118 ITE: w5m :ALE: 6'=1'-0' 2ANM BV: MFC A4.0