HomeMy WebLinkAbout5-POINTS PLAZA AS-BUILT PLANSFive Points
South Gate - Broadway Gate - Pavilion
101 South Broadway, La Porte, TX 77571
11
CONTRACTOR:
C.F. JORDAN COMMERCIAL, LP
9801 WESTHEIMER SUITE 320
HOUSTON, TX 77042
P: 832.615.1270
F: 832.615.1271
ARCHITECT:
URS GROUP INC.
9801 WESTHEIMER SUITE 320
HOUSTON, TX 77042
P: 713.914.6699
F: 713.789.8404
SUB -CONTRACTOR:
TFC CANOPY
1107 NORTH TAYLOR ROAD
GARRETT, IN 46738
P: 800.832.3212
P.M.: KEITH MOUGHLER
E-MAIL: kmoughlei@centurionind.com
DTLR: MELISSA COOK
E-MAIL: mcook@centurionind.com
BROADWAY GATE
T.F.C. CANOPY'S GENERAL NOTES
1. All dimensions to be field verified prior to production
2. All field dimensions are to be performed after finish
sheathing, drywall, brick, doors and windows are installed.
3. There is a (4 - 6) FOUR to SIX WEEK lead time for materials
to be on -site after approval drawings are changed according
to field dimensions taken.
4. Panel dimensions are subject to change after field dimensions.
5. Panel labeling/numeric identification (71") is subject
to change after field dimension verification.
6. ACM (Aluminum Composite Material) Panels are to be:
: 4mm REYNOBOND CHAMPAGNE METALLIC ACM PANEL
7. All ACM panels have been drawn to best utilize the full sheet
size of each color.
8. ACM SYSTEM for this job is "DRY (EXTRUSION)" SYSTEM.
9. Abbreviation W.I.F." = VERIFY IN FIELD
10. Abbreviation "C.T.F." = CUT TO FIT
11. Grace Ice & Watershield provided by T.F.C.
IIIIIIIIIIIIII
IIIIIIIIIII II
III
fA5{TA IF)Hi(i1s�S':�X
PAVILION
DRAWING INDEX:
A1.0 = PAVILION FLOOR PLANS
Al.1 = SOUTH GATE FLOOR PLAN
A1.2 = BROADWAY GATE PLANS
A2.0 = PAVILION ELEVATIONS
A2.1 = PAVILION ELEVATIONS
A2.2 = SOUTH GATE ELEVATIONS
A2.3 - BROADWAY GATE ELEVATIONS
A3.0 - PAVILION & S. GATE SECTIONS
A3.1 = SOUTH GATE SECTIONS
A3.2 = BROADWAY GATE SECTIONS
A4.0 = CONNECTION DETAILS
APPROVAL DRAWINGS
NOT FOR CONSTRUCTION
PLEASE VERIFY THE DESIGN & SCOPE OF WORK.
MARKUP IF NEEDED, SIGN AND PLEASE RETURN.
ATURE: DATE:
AS SHOWN ❑ AS NOTED
PRODUCTION COPY
INSTALLER COPY
PROJECT MANAGER COPY
FILE COPY
PAVILLION- TOP PLAN
$GALE: 114'=1'-V'
NORTH
m
M
M
M
N
N
r
M)
M
z
0
a
5
W¢�
F � N
z
0
a ASH
w
> IX
C op p
a
00
x
F
0
PAVILION
TOP PLAN
JOB7k. 601119
DATE: 114"=1'-0
SCALE: VARIES
ORANM BV: MFC
A1.0
z
Az.z
T T T q T T I q
I_51 * 1 1 If. I'I
47f' 48- 47-k 15"
6
A2.3
SOUTHGATE - TOP PLAN
SCALE: 114"=1'-0'
T T T T T TT T
15" . 48j' I 48" I 46j' 11,
0
SOUTHGATE - SOFFIT PLAN AZ.3
SCALE: 1W=1'4"
NORTH
z
0
a
5
W¢�
F N
F c7An
z
0,
a Q �
w
> C14
rZ pp0�
a
00
x
F
x
0
SOUTH GATE
"AS BUILT" DRAWINGS TOP & SOFFIT
JOS7k. 691119
- FIELD VERIFED - DATE: w6m
THIS DESIGN WAS INSTALLED BASED ON APPROVAL SCALE: 1�4"=1'0'
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DRAWN BV: MFC
DTLR: DATE: _ A
P. M.: DATE:-111_ �.y .
11
A2.6
WEST
NORTH
AVL
,Av
`T
12
4 11
A2.4
EAST
Lo WEST
Ln
.—L
BROADWAY GATE - TOP PLAN AT CANOPY
SCALE: 1/7=1'-0'
NORTH
13$" 1 1 1111 . 13$„
9
SOFFIT PLAN
@ CANOPY SOFFIT
N
1231" 1111 1 1 Jill 1
52
SOUTH
BROADWAY GATE - SOFFIT PLAN AT CANOPY
SCALE: 1Z=1'-P•
12
2.4
EAST
NO TH
+e v- cos I
O
.a
5
- w �
Z ¢ o F
O 3
W
a
w
SOUTH w 24 o 0
a
¢wa
� O
x
BROADWAY GATE - TOP PLAN ]
IN O
BROADWAY
"AS BUILT" DRAWINGS IGATE PLANS
JOBk: 401119
- FIELD VERIFED - DAB: 815/99
THIS DESIGN WAS INSTALLED RASED ON APPROVAL SCALE: iFl"=1'-0'
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DRAWN BY: MFC
DTLR: DATE: _ P. M.: DATE: A1 _ i 1 1 • 2
T T
o 2
4-m REYNOBOND CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
�NEON LIGHTING SYSTEM
$B.O. CANO� BY OTHERS
FIBER OPTIC LIGHTING
405" (TYP. @ PRIMARY COLUMNS)
BY OTHERS
2'x2'STUCCO COLUMN
- (PRIMARY), BY OTHERS
9
1'xl'STUCCO COLUMN
(SECONDARY), BY OTHERS
z m
IIIIIIIIIIIII 1111111111111
w
(If
I�T
E
";fff .0. GRADE
w a 1�0
Om
m
,D,NORTHWEST ELEVATION AT PAVILION
SCALE.114-=V
0
Z DL
41- 10* 1081, 108t 41j-
$T.O. PA-1 --------- ----------------- ------------ --------- --------------------- z
4— REYNOBOND CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
P2- P3
NEON LIGHTING SYSTEM
0 CAN —
BY OTHERS
FIBER OPTIC LIGHTING
(TYP. @ PRIMARY COLUMNS)
BY OTHERS
2'x2'STUCCO COLUMN
(PRIMARY), BY OTHERS
�D
I'XI, STUCCO COLUMN >
(SECONDARY), BY OTHERS pj 0 0
H.C. ACCESSIBLE RAMP
$T.O. GRADEBY OTHERS
r PAVILION
14 SOUTHWEST ELEVATION AT PAVILION "AS BUILT" DRAWINGS ELEVATIONS
) SCALE 114-=l-V - FIELD VERIFED - DATE W�
THIS DESIGN WAS INSTALLED BASED ON APPROVAL
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.: DATE: 31A2. 11
4 4 4 4
REYNOBOND CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
LIGHTING SYSTEM
BY OTHERS
OPTIC LIGHTING
'RIMARY COLUMNS)
BY OTHERS
3TUCC0 COLUMN
ARY), BY OTHERS
3TUCCO COLUMN
DARY), BY OTHERS
3 ,SOUTHEAST ELEVATION AT PAVILION
A2.2 SCALE:1/4"=V
4 4 4 4
REYNOBOND CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
.IGHTING SYSTEM
3Y OTHERS
OPTIC LIGHTING
'RIMARY COLUMNS)
3Y OTHERS
STUCCO COLUMN
1RY), BY OTHERS
TUCCO COLUMN
DARY), BY OTHERS
=SSIBLE RAMP
3Y OTHERS
nNORTHEAST ELEVATION AT PAVILION
A2.2 SCALE: 1/4"=lW
m
M
t•
eM
Z
_ T
r
M
PAVILION
"AS BUILT" DRAWINGS
ELEVATIONS
JOB1k. 491119
- FIELD VERIFED -
DATE: 8/5I09
THIS DESIGN WAS INSTALLED BASED ON APPROVAL
SCALE: 7l4'=1'-9"
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.: DATE:
DRAWN BY: MFC
Q 4 4 4 4 Q Q 4 4 44 ITT 4 0
n}"
----------
G25 € ----- 7
-
2 �' -
4mm REYNOBOND
CHAMPAGNE METALLIC 2 8
ACM PANELS, BY T.F.C.
24 2 d: - 8
----------------------- a.1 - 3.1 NEON LIGHTING SYSTEM 1"
G BY OTHERS
rv� GLASS BLOCK BY OTHERS
m
M
ut
n
8g qg� I 48" I 4ayRI 1"4 - ivd ZUMi
10}" NEON LIGHTING "H 10}" 8�" , - 8�" W M
LEFT SIDE
BYOTHERS RIGHT SIC STUCCO BY OTHERS - K ^
i�
CURVED PANEL CURVED PANEL �Q(
QLL
nWEST ELEVATION AT SOUTHGATE ° tD
A2.3 SCALE : lW=1'-0" } N
nNORTH ELEVATION AT SOUTHGATE - DRAWN FLAT M
A2.3 SCALE: 1/4'=1'-0"
Q QQ QQ Q � a
Q q4 4Q QQ 4 r
-- """--- 17j. 1.,1" 5* 551, 1 ,
-------------G
5
G26 G26
-------- z
/ „
a za O
4mm REYNOBOND G 8 F F 2
28 CHAMPAGNE METALLIC (xl 6 n
ACM PANELS, BY T.F.C. F
28 G8 24
z Q��
2
- -------------------- F
NEON LIGHTING SYSTEM
BY OTHERS [Tr Q O
W in
GLASS BLOCK BY OTHERS i4j" ¢ O
G 9 3#1 U.L t It "I --I—
'WNW x
y,
8k47�� �48" qT� ' � � 1`2
St
10" NEON LIGHTING "8 10"
LEFT SIDE BY OTHERS RIGHT SICSTUCCO BY OTHERS SOUTHGATE
CURVED PANEL CURVED PANEL "AS BUILT" DRAWINGS ELEVATION
S
JOBp: 401119
- FIELD VERIFED DATE: 915/09
THIS DESIGN WAS INSTALLED BASED ON APPROVAL SCALE: 1/4•=1'-0"
�j DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK. DRAWN BV: MFC
nWEST ELEVATION AT SOUTHGATE DTLR: DATE: _
nSOUTH ELEVATION AT SOUTHGATE - DRAWN FLAT AP.3 SCALE:1/4'=1'-0" A
A2.3 SCALE: 1/4'=1'-0" P. M.: DATE: ((�1G
WEST ELEVATION OF CANOPY
!„ AT BROADWAY GATE - DRAWN FLAT
,A2l I SCALE: IA"=1'-0'
RADIJEND-L
.
STUCCO
ALL CPY PANELS FIRST
RADIUS CORNER
END WALL
@STUCCO
INNER ELEVATION
FACES NORTH
NORTH ELEVATION AT SOUTH COLUMN
nAT BROADWAY GATE
A2.4 SCALE:,/4'=1'-0"
EAST ELEVATION OF CANOPY
i AT BROADWAY GATE - DRAWN FLAT
SCALE: 1/4"=1'4"
RADIUS CORNER
END WALL
@STUCCO
INSTALL CANOPY PANELS FIRST
INNER ELEVATION
FACES SOUTH
SOUTH ELEVATION AT NORTH COLUMN
\AT BROADWAY GATE
A2.4 SCALE: 114"=1'-0'
RADIUS CORNER
END WALL
@STUCCO
"AS BUILT" DRAWINGS
- FIELD VERIFED -
THIS DESIGN WAS INSTALLED BASED ON APPROVAL
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.:
DATE:
z
0
a
F C7�n
z 0
0 Q�F
W
> a 5�'.
c ta00
w�a
�o
x
F
O
BROADWAY GATE
ELEVATIONS
JOBp: 401118
DATE: S/5
SCALE: VARIES
DRAWN BY: MFC
A2.4
Af
1 PAVILION SECTION
A3.1 SCALE: 1-1/2"=1'-0"
BY OTHERS
( a1 SECTION AT NORTH GATE
A3.1 SCALE: 1-1/2"=V-0"
SHIELD T' 1 A40 T^ I1 A40
ICE AND WATER SHIELD ICE AND WATER SHIELD
(B (BV TFC)
#ENT.1
BA4.0 eFsSOFFIT SOFFIT VENT z
OTHERS z BV OTHER�� z
SUSPENDED SOFFIT BY 78 SUSPENDED SOFFIT BY OTHERS
OTHERS
z SECTION AT SOUTH & NORTH GATES
A0.1 SCALE: 1-1/2"=V-0"
SOFF
SUSPENDEI
BY OTHERS
SECTION AT BROADWAY GATE
A0.1 SCALE: 1-V2"=1'-0"
s SECTION AT SOUTH GATES
A0.1 SCALE: 1-1/2"=V-0"
z
0
a
z o
n
o Q�F
w
> °��a
tp00
w�a
� O
x
F
O
SOUTH GATE
"AS BUILT" DRAWINGS
ISECTIONS
JOBp: 401118
- FIELD VERIFED
DATE: &m9
THIS DESIGN WAS INSTALLED BASED ON APPROVAL
SCALE: 1-1/C=1'-0•
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORE.
DRAWN BV: MFC
DTLR: DATE: _
P. M.: DATE: _
A/l�
/y J
FRAMING CLIP EXTRUSION
BY OTHERS
4mm REYNOBOND #„L �J
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
A TYP. HORIZONTAL & VERTICAL JOINT
SCALE: 6"=V-0"
W ROOF MEMBRANE
4mm REYNOBOND-----_
EYNOBOND I BY OTHERS
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C. FINISH CLIP
STEEL
BY OTHERS
WEEP HOLES
FRAMING
BY OTHERS
1 PARAPET/ROOF SIDE TERMINATION
SCALE: 6"=V-0"
4mm REYNOBOND
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C. 1}. FRAMING
I -I �BY OTHERS
- 1_ h�START CLIP
r
m 1 - Yi TRIM-1 BY T.F.C.
WEEP HOLES
B STARTER DETAIL
SCALE: 6"=V-0"
4mm REYNOBOND
4 / CHAMPAGNE METALLIC
/ ACM PANELS, BY T.F.C.
FINISH CLIP
1"
STUCCO
�., BY OTHERS
STEEL
BY OTHERS
RIM-1 BY T.F.C.
FRAMING
BY OTHERS
E BROADWAY GATE DETAIL
SCALE: 6"=V-0"
1i"
-FRAMING
BY OTHERS
-STUCCO
BY OTHERS
4mm REYNOBOND I 1§.
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
C END DETAIL
SCALE: 6"=1'-0"
TRIM-2
BY T.F.C.
FINISH CLIP
BY T.F.C.
-FINISH CLIP
- FRAMING
BY OTHERS
BY OTHERS I I
F SOUTH GATE DETAIL
OPTION "A" SCALE: 6"=1'-0"
EXTRUSION
BY T.F.C.
4mm REYNOBOND
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
FRAMING ATTACHED AT HORIZONTAL JOINTS
BY OTHERS WITH EXTRUSION AND CLIP
(/-SOUTH GATE DETAIL
�` OPTION "B" SCALE:6"=T-0"
BY OTHERS
-STUCCO
BY OTHERS
"AS BUILT" DRAWINGS
- FIELD VERIFED -
THIS DESIGN WAS INSTALLED BASED ON APPROVAL
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.: DATE:
DETAILS
�B#. 401118
ITE: w5m
:ALE: 6'=1'-0'
2ANM BV: MFC
A4.0