STA. 3+83-- — STA. 3-I 83�
-�-12' MIrJ.pROP. 78 L.F. OF 16" STEEL CASING
& 78 L.F. OF 8" PVC WATER. LINE
�— NEW BASELINE OPEN CUT
(ADD TO CONTRACT)
STA. 14-f 13.8
END EXIST. 18" CASING O
(PER ORIGINAL CONTRACT)
o
EXIST. CASINGS
—� PER ORIGINAL CONTRACT)
~~ FUTURE 505 L.F. OF 8" PVC WATER LINE (DELETE FROM ORIGINAL CONTRACT)
PROPOSED 115 L.F. OF 8 P`JC WATER LINE
/ STA: 1 4+ 18.2
., ^"
. BORE & JACK END EXIST: 1 b .:CASING.
STA: 20+38:6
� f
C ,
- i5 UNDER EXIST: PVMT: (PER ORIGINAL CONTRACT)
STA. 20+38.6
i 4' g N ED
• I LINE
........._ ..... �........ UVATEP. LINE @ STA. 15+33.2 —� (ADD TO &
NOTE MIN. BURY ,TO' BE MAINTAI,
Cq ON ALL PIPE
ON ORIGINAL BASELINE DELETE PROPORTIONATE
— STA. 20+96.25 = —0+06 NEW BA: U) — EAST QUANTITY OF OPEN CUT CITY OF LA PORTE
INSTALL 8"x 8 TEE
'10,, SAN. SWR. &
STA: 21 +00.8 & 8" PLUG (N0.) g" WATER LINE SE��TS RD. UTILITY E�'TENSI®NSA
(ADD TO CONTRACT) (CHANGE ORDER N0. 1)
t
DRAWN: BRIAN .DESIGNi PHIL APPROVED: 'FRED DATE:'9 93: FILE 'J1 6701
FORCE fvlAIN @ STA. 1 5+21 .2 --�
ON ORIGII\JAL BASELINE
0+06 NEW BASELINE -- EAST
INSTALL 10"x 6" TEE & 6' PLUG
_--- - MIN. 2' VERT. CLEARANCE
[CENTER 1 — 20' JOINT]
�-- PROP. 58 L.F. OF 18" CASING VVA-FEF2LINE -TO BE
� 58 L.F. OF 10" PVC F.M. CONSTRUCTED
ABOVE FORCE MAIN(PER ORIGINAL CONTRACT)
- PROP. 62 L.F. OF 16" CASING IkISTALL 8" G.V. @ STA. —0+03
(PER ORIGINAL CONTRACT)
�-- BASELINE` (PER ORIGINAL CONTRACT)
1 / PROP. 625 L.F. OF -10" PVC FORCE (MAIN (PER ORIGINAL CONTRACT)
[—_—
101 ° 53'0'
/ (1YP.)\