Loading...
HomeMy WebLinkAboutLA PORTE HIGH SCHOOL SITE PLANGENERAL NOTES I THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 2 THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH THE JOBSITE. 3 THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFEGUARDING AND PROTECTING ALL MATERIAL AND EQUIPMENT STORED ON THE JOBSITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STORAGE OF MATERIALS IN A SAFE AND WORKMANLIKE MANNER TO PREVENT INJURIES, DURING AND AFTER WORKING HOURS, UNTIL PROJECT COMPLETION. 4 WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALE DIMENSIONS. CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE MUST BE NOTIFIED OF ANY VARIATION FROM THE DIMENSIONS AND CONDITIONS SHOWN BY THESE DRAWINGS. DIMENSIONS SHOWN ARE TO THE BACK OF CURB UNLESS NOTED OTHERWISE. 5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS AND CONSTRUCTION INSPECTIONS WITH THE PROPER REGULATORY AGENCIES, PRIOR TO BEGINNING CONSTRUCTION. ENGINEER. D! DIES OF A pEgh&ITS SHALL BE SENT TOTHE 6 CONTRACTOR TO OBTAIN ALL PERMITS REQUIRED PRIOR TO STARTING CONSTRUCTION OF UTILITIES AND/OR CULVERTS WITHIN RIGHT-OF-WAYS. 7 THE DRAWINGS SHOW AS MUCH INFORMATION AS CAN BE REASONABLY OBTAINED FROM ON THE GROUND OBSERVATION AND EXISTING CONSTRUCTION DRAWINGS REGARDING THE ENTIRE TOPOGRAPHY, CONTOURS, SUB -SURFACE SOILS, AS WELL AS THE LOCATION AND NATURE OF PIPELINES, STORM SEWERS, WATERLINES, NATURAL GAS LINES, UNDERGROUND CABLES, ETC. HOWEVER, THE ACCURACY OF OR COMPLETENESS OF SUCH INFORMATION IS NOT GUARANTEED. 8 THE EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE CONTRACTOR SHALL VERIFY THE LOCATIONS, SIZES, AND DEPTHS OF ALL UTILITIES. THE CONTRACTOR SHALL CONTACT THE CIVIL ENGINEER IF UTILITIES SHOWN ARE NOT AS SPECIFIED. 9 CONTRACTOR SHALL COMPLY WITH ALL OCCUPATIONAL, SAFETY, AND HEALTH ACT (O.S.H.A,) REGULATIONS. 10 ALL WORK IS TO BE DONE IN ACCORDANCE WITH APPLICABLE NATIONAL. STATE, MUNICIPAL, AND LOCAL CODES, 11 IT IS THE CONTRACTOR'S RESPONSIBILITY TO SUPERVISE AND COORDINATE ALL WORK TO INSURE THE PROPER EXECUTION; ALL WORK IS TO BE ACCOMPLISHED IN A NEAT, WORKMAN LIKE MANNER, AND ALL EXCESS MATERIALS, TRASH AND DEBRIS, ETC., SHALL BE REMOVED FROM THE JOB BY THE CONTRACTOR, AT HIS EXPENSE. 12 THE CONTRACTOR SHALL INCLUDE IN HIS BID AS AN INCIDENTAL ITEM FOR THE REMOVAL OF ANY EXISTING SIGNAGE THAT IS IN THE WAY OF THE PROPOSED NEW CONSTRUCTION. IF REMOVAL OF SIGNAGE IS NECESSARY, THE CONTRACTOR SHALL REPLACE SAID SIGNAGE. 13 THE CONTRACTOR SHALL KEEP ALL STREETS FREE OF DIRT, MUD, ETC. DURING THE COURSE OF CONSTRUCTION. 14 THE CONTRACTOR SHALL NOT LEAVE ANY TRENCHES OR PITS OPEN OVER NIGHT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR KEEPING THE SCHOOL CHILDREN OUT OF THE WORK AREA, 15 CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES IN THE AREA PRIOR TO COMMENCING WORK IN ANY RIGHT-OF-WAY OR EXISTING EASEMENT. A VERIFICATION NUMBER FROM THE ONE -CALL UTILITY COORDINATING COMMITTEE WILL BE REQUIRED. (800) 344-8377. 16 CONTRACTOR SHALL. COORDINATE WITH APPROPRIATE UTILITY COMPANIES TO RELOCATE EXISTING POWER POLE(S) AND/OR UTILITY BOX(ES) OR ANY OTHER UTILITIES AS DEEMED NECESSARY BY THE ENGINEER, CONTRACTOR SHALL COORDINATE THE RELOCATION AND PAY ANY FEES. 17 STRIPING AND CROSS -HATCHING SHALL BE "TRAFFIC YELLOW" PAINTED LINES, FOUR (4) INCHES WIDE UNLESS OTHERWISE NOTED. 18 ALL PAVEMENT MARKINGS (OTHER THAN STRIPING E CROSS -HATCHING) SHALL BE THERMOPLASTIC. 19 EXISTING PAVEMENTS, CURBS, SIDEWALKS, AND DRIVEWAYS DAMAGED OR REMOVED DURING CONSTRUCTION SHALL BE REPLACED TO CITY STANDARDS. 20 CONDITION OF THE ROAD AND/OR RIGHT-OF-WAY, UPON COMPLETION OF JOB, SHALL BE AS GOOD AS OR BETTER THAN THE CONDITION PRIOR TO STARTING WORK. 21 ADEQUATE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. ANY DRAINAGE DITCH OR STRUCTURE DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THE SATISFACTION OF THE OWNING AUTHORITY, 22 WHEELCHAIR RAMPS SHALL BE INSTALLED IN ACCORDANCE WITH CITY STANDARDS AT ALL INTERSECTIONS WHERE SIDEWALKS EXIST AND THE EXISTING CURB OR SIDEWALK IS DAMAGED OR REMOVED DURING CONSTRUCTION. PAVING A GRADING NOTES 45 THE PAVING JOINT PATTERN IS A SUGGESTED LAYOUT, THE CONTRACTOR MAY ALTER THIS LAYOUT BY SUBMITTING A DRAWING SHOWING THE PROPOSED JOINT PATTERN CHANGES AND/OR MODIFICATIONS TO THE CIVIL ENGINEER FOR REVIEW. 46 SAWED JOINTS E TRANSVERSE JOINTS ARE TO BE EQUALLY SPACED BETWEEN EXPANSION JOINTS. 47 SAWING OF JOINTS MUST BEGIN AS SOON AS THE CONCRETE HAS HARDENED SUFFICIENTLY TO AVOID EXCESSIVE RAVELING. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION, 48 THE CONTRACTOR SHALL REPLACE ANY DAMAGED AND/OR REMOVED CONCRETE PAVEMENT, CURB AND/OR WALK TO EQUAL OR BETTER THAN EXISTING CONDITION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO INCLUDE ANY CONCRETE PAVEMENT, CURB OR WALK REMOVAL AND REPLACEMENT IN HIS BID AS AN INCIDENTAL TO THE COST OF CONSTRUCTION. 49 THE CONTRACTOR SHALL GRADE THE SITE AS INDICATED BY THE CONTOUR LINES, DIRECTIONAL ARROWS AND ELEVATIONS SHOWN ON DRAWINGS. ALL GRADING SHALL. VARY UNIFORMLY BETWEEN ELEVATIONS SHOWN, 50 THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTING SILT FENCE OR PLACING SQUARE HAY BALES AT ALL POINTS WHERE STORMWATER RUNOFF EXITS THE SCHOOL PROPERTY, AND AT ALL STORM SEWER INLETS AND MANHOLES, TO PREVENT SEDIMENT CONTAMINATION OF THE EXISTING DRAINAGE ARTERIES AND NEW STORM SEWERS DURING CONSTRUCTION OF OF THIS PROJECT. REFERENCE "STORM WATER POLLUTION PREVENTION PLAN". 51 SITE TO BE CLEARED OF VEGETATION AND DEBRIS AS NECESSARY TO COMPLETE PROJECT OR AS DIRECTED BY ENGINEER. STRIPPINGS, IF CLEAN, ARE TO BE STOCKPILED AND USED AS DRESSING FOR GRADING, OTHERWISE THE STRIPPINGS SHALL BE DISPOSED OF BY THE CONTRACTOR, 52 EXCESS SOIL FROM CONSTRUCTION SHALL BE REMOVED FROM SITE. ALL. EXCESS DEBRIS, TREES, AND/OR WASTE MATERIALS SHALL BE REMOVED FROM THE SIZE AND AND DISPOSED OF PROPERLY. ALL ASSOCIATED COSTS SHALL BE AT THE EXPENSE OF THE CONTRACTOR. 53 BACKFILL TO TOP OF NEW PAVEMENT OR CURBS WITH CLEAN SOIL FREE OF CLODS, ALL DISTURBED AREAS AND AREAS REQUIRING GRADING SHALL BE FINE GRADED. REMOVE ALL TRASH/DEBRIS AND PROVIDE A SMOOTH SURFACE FOR PROPER TURF MANAGEMENT. 54 WHERE NEW CONCRETE PAVING MEETS EXISTING CONCRETE PAVING, INSTALL 3/4" SMOOTH DOWELS, (18" LONG AND 18" C-C), BY DRILLING 8" INTO THE CENTER OF THE EXISTING SLAB AND EMBEDDING WITH EPDXY, M-IEN PAVING UP TO BUILDING FOUNDATIONS, ALSO INSTALL IMPREGNATED FIBER BOARD EXPANSION MATERIAL WITH TOP PULL STRIP FOR CAULKING. 55 PAVEMENT GRADES SHALL VARY UNIFORMLY BETWEEN ELEVATIONS SHOWN. 56 CONTRACTOR TO TAKE NECESSARY PRECAUTIONS TO PROTECT ROOT SYSTEMS OF SHRUBS, PLANTS, AND TREES ALONG THE AREA OF EXCAVATION. 57 CONTRACTOR SHALL INSTALL SOLID SOD ON ALL DISTURBED AND GRADED AREAS. 58 SECURE PRECAST CONCRETE WHEEL STOPS BY DRILLINGAND SETTING #4 DOWELS INTO PAVEMENT. CIVIL LEGEND ® PROPOSED "A" INLET (A-1) FFF FILTER FABRIC FENCE IPB INLET PROTECTION BARRIER X EXPANSION JOINT L LONGITUDINAL CONSTRUCTION JOINT LT LONGITUDINAL -TIED CONSTRUCTION JOINT T TRANSVERSE CONTRACTION JOINT S SAWED PAVEMENT JOINT -4 PAVEMENT GRADING ARROW NOTES AND LEGEIW--D s OF T �� F- SITE PLAN ACCURACY CERTIFICATE •, / 7k •': * ....... I, SEAJ.i PRACTICE THE NEY ," EGISTERED UNDER THE LAWS of 7HE STATE of TEXAS TO 0 io P. ROONEY / PROFESNGIN' AND CORRECT G AN EREBY CERTIFY THAT THE ABOVE SITE PLAN IS TRUESEAM .......................................... , TO THE MY K O L +� 91977 :':4 � 0,�� 7& tEXAs h� S/ONAL REGISTRATIONPNo. 9N� 977 rA TP L, 2\ \ 14.75 14.59 ad.. TP 1 14.181 ` TP 14.50 ®T 13.86 1,38 13.7All D \ TP 14.20� I 1 0>\S�'�G��h �'b 4 \ \ \ /• TP do 8 ISITE PLAN h +NtK() 14.50 MANI e G L 0,, °I° FG 14.40 z P", I, -- REMOVE EXIST, INLET CUT AND PLUG EXIST. PIPE CONNECT 1 TO EXIST. . S I M NO-6 - TG=13.', 5 FL=9. `I CONNECT TO EXIST, STM FL=9.04+ 20'-'! 2" HDPE 0, 4% TO=13.30 L=9.1 3 tK �VIX . tK } � 'S 5. � \ !'� G= \ { ? 3.50 O b=i 44 't.1 F it:Rit: G E^ijxii�'7. II...i`r'.� E .,r,"f '^ sr_ to r. . `` `'`..✓-'�'J '�•V _-_i�O-4 - � C.t`"T Aftij i_j ;.t' Ui^ E X 1 T PIPE 1 t; .:4n .1� ) (� �•�O ��,.� / 13 L 10.76 ti`\ i'€�*2'- 12" HDPE Gj 5 °. q� TP \ �. 0.44% �b`•\�O �'',�. �°L O 1 TP MATC �G `L r-� T rx: ' F ti� �0,• ,,Ib 42'-i 2" HOPE �'`p°' p �-- - p -�_ : �' -. TP : ; .y• --_ , o 0.44% ��\��� MATCI / E -rn1 h O \ «-.. \rV \ MATCH I" i =1 1.17 \ ��J , V �13.85 \ _x -#. ro ` l i UP ) .b ` G �• DA. n , 16=.,.12n 1 eDPI` / op TP p o 3.50 �� - I-:I�'�i OVE E'�'�T. g;ti13 L.1 P � . O , •. o . h tx � AND PLUG EXIST. PIPE \ G 4 : TP \ `r 14.10 o CONNECT TO TP EXIST. STM .� r 1 ', + .��. o ,,�-1 0 �� 50 5 13.6510 � 13.65 ���• �o, �`� +'SQL �` a '` a b TP ��L ' • MATCH `L' 45 ro \`1'''Q)� Epp 1+ MATCH+N ��'�,`�j,• ��1 \ ti� ,� �,�� ti� � .1 .1�'J � ,�^�• �( ,�G pro \ ro '\ C'C� 'S• � 18"-#6 DEFORMED DOWEL @ 18" O.C.; DRILL E EMBED 6" INTO PVMT. W/ EPDXY CEMENT EXIST. CONCRETE PVM7. \ , 3/4" REDWOOD BOARD #3 BARS ®16" O.G. E. W. VARIES 611 3 j EXISTING TO PROPOSED PAVEMENT SEE BAR @ 16" O.C. N.T.S. TOOLED EDGE CONTRASTING COLOR ADD TIVETOWITH COLOR CONC. a AS SELECTED BY ARCHITECT 00, O CLJOINT TT \-a- _ _"f lr 7-(11.;7 17 . 11.1_I 5" 511 CONCRETE PAVING ` I I=,IIIII 1 �I TZJOINT SEAL. (SILICONE SEALANT) RE: SITE PLAN 4 X 10" BENT DOWELS 1 I/2" TYP. #3 BARS ® 16" OCEW 'REDWOOD EXPANSION JOINT WITH LOAD TRANSFER DEVICES ON 12 INCH CENTERS. NOTES: I. SLOPE TRANSVERSE SURFACE 114" PER FOOT IN DIRECTION OF GENERAL SITE AREA DRAINAGE. 2. FLOAT EDGES 1/4" MAXIMUM AT CONTROL JOINTS. 3. USE REDWOOD BOARD EXPANSION JOINT W/ #4 SMOOTH BAR W/ LOAD KEY (1011 LONG). 4. REDWOOD BOARD EXPANSION JOINTS ON 15 FOOT CENTERS MAXIMUM. 5. CONTROL JOINT SPACING NOT TO EXCEED FIVE (5) FEET. SCORED, TOOLED OR SAWN JOINTS SHALL BE 1/4 THE PAVEMENT THICKNESS BUT NOT LESS THAN ONE (1) INCH. 6. SIDEWALK JOINTS SHALL ALIGN WITH PAVING JOINTS WHEN SIDEWALK IS ADJACENT TO PAVING, 2 1 CONCRETE SIDEWALK 10" O.C., W/ PLASTIC SLEEVES RE: CONC. WALK C.J. 3/4" EXPANSION . �._. JOINT III -III III ;Ili I I 111 1!C 1I QIt i I i I 1=1 I I I I 1=I i IT -1 I I-'1 11=I I I -I 11=11�I i ,1 , 11=1 11=! 15 I I I=11 I -I 11=1 [:44" I l-� (�-1 ► i I I!-II--III- >>I- I. -. - - IIII ,1,I 11=I 11=1 I I; 11) I 11�- 111=1 I ICI I �_I�I_L`I.LI_... -) ! �-- •_� 11.-, i' I RAMP SHALL NOT EXCEED #3 BARS ®16" OCEW 1 IN 12 SLOPE PREPARED SUBGRADE - TYPICAL N.T.S. 1 ACCESSIBLE RAMP N.T.S. ARCHITECT PBK 11 GREENWAY PLAZA. 22NO FLOOR NOU N TEXAS 77046-1104 (713 9615-0608 •& 13 961-4571 STRUCTURAL PBK ENCMINEERS 11 GREENWAY PLAZA, 22ND FLOOR HOU�TON TEXAS 77046-1104 (713) 98§-0608 •93 13 961-4571 @MEP ENGINEERS PBK ENGINEER$ 11 GRMAVAY PLAZA, 22ND FLOOR NOU ON TEXAS 77046-1104 (713�961-0608 '! (713 981-4571 CIVIL PBK ENGINEERS �1I1 GREENWAY PLAZA, 22ND FLOOR (713) 9N6fi-0603 046-1104 L713) 961-4571 TECHNOLOGY PBK ENGINEERS �1I1 GREENWAY PLAZA. 22ND FLOOR {713) 9615-ODS 77� -1104 713 961-4571 i� .. j�. r r a r ,1 lid � S3 r ^C� S;n � r -24 t 'Yfti 'r sL c .# ecto fr .s ,fi max:€"�r ss ate•► ,►w� � F *..o SEAN P. ROONEY ................... •...................... * . 91977 11 Greenway Plaza 22nd Floor Houston, Texas 77046-1104 Phonv 713°965° 0608 Fax 713°951°4571 PROJECT NO. 11231 DATE 4/20/12 DRAWN VGC CHECKED SPR REVISIONS 90% REVIEW ci .1 SITE PLAN