HomeMy WebLinkAboutFIVE POINTS PLAZA CONSTRUCTION PLANSFive Points
South Gate - Broadway Gate - Pavilion
10 1 South Broadway, La Porte, TX 77571
SOUTH GATE
CONTRACTOR:
C.F. JORDAN COMMERCIAL, LP
9801 WESTHEIMER SUITE 320
HOUSTON, TX 77042
P: 832.615.1270
F: 832.615.1271
ARCHITECT:
URS GROUP INC.
9801 WESTHEIMER SUITE 320
HOUSTON, TX 77042
P: 713.914.6699
F: 713.789 . 8404
SUB -CONTRACTOR:
TFC CANOPY
1107 NORTH TAYLOR ROAD
GARRETT, IN 46738
P: 800.832.3212
P.M.: KEITH MOUGHLER
E-MAIL: kmoughler@centurionind.com
DTLR: MELISSA COOK
E-MAIL: mcook@centurionind.com
BROADWAY GATE
T.F.C. CANOPY'S GENERAL NOTES
1. All dimensions to be field verified prior to production
2. All field dimensions are to be performed after finish
sheathing, drywall, brick, doors and windows are installed.
3. There is a (4 - 6) FOUR to SIX WEEK lead time for materials
to be on -site after approval drawings are changed according
to field dimensions taken.
4. Panel dimensions are subject to change after field dimensions.
5. Panel labeling/numeric identification ( 71 ") is subject
to change after field dimension verification.
6. ACM (Aluminum Composite Material) Panels are to be:
* 4mm REYNOBOND CILAMPAGNE METALLIC ACM PANEL
7. All ACM panels have been drawn to best utilize the full sheet
size of each color.
8. ACM SYSTEM for this job is "DRY (EXTRUSIONI" SYSTEM.
9. Abbreviation W.I.F." = VERIFY IN FIELD
10. Abbreviation "C.T.F." = CUT TO FIT
11. Grace Ice & Watershield provided by T.F.C.
PAVILION
DRAWING INDEX:
ALO - PAVILION FLOOR PLANS
Al. I= SOUTHGATE FLOOR PLAN
AL2 = BROADWAY GATE PLANS
A2.0 - PAVILION ELEVATIONS
A2.1 = PAVILION ELEVATIONS
A2.2 = SOUTH GATE ELEVATIONS
A2.3 = BROADWAY GATE ELEVATIONS
A3.0 = PAVILION & S. GATE SECTIONS
A3.1 = SOUTH GATE SECTIONS
A3.2 = BROADWAY GATE SECTIONS
A4.0 = CONNECTION DETAILS
APPROVAL DRAWINGS
NOT FOR CONSTRUCTION
PLFASEVE FYTHE DESIGN& SCOPE OF WORK
MARKUP IF NEEDED, SIGN AND PLEASE RETURN.
SIGNATURE: DATE:
ASSHOWN AS NOTEDE]
PRODUCTION COPY
INSTALLER COPY
PROJECT MANAGER COPY
F] FILE COPY
IS
PAVILLION- TOP PLAN
S�LE 1/4"=I*�'
"AS BUILT" DRAWINGS
- FIELD VERIFED -
THIS DESIGN WAS INSTALLED BASED ON
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
P. M,
DATE:
DATE:
9
z
ox
CQ
D4 �D
P� 0 0
V)
�D
0
cl)
r—PA—VI—MOT-1
TOP PLAN I
DATE: 11r=v-0-1
NORIH
5
T T T T T T T T
SOUTHGATE — TOP PLAN
SCALE: 11-1--0-
1,1* 1 1 * I I
FIV p 4* ' 48" . 47j' . 1 5.
A��
T T
-0
SOUTHGATE — SOFFIT PLAN
SCALE. 1W=1-�
z
00
19
0
0
Z
z
0
z ox
CQ
R
w
0
D4 �D
0 0
�D
0
cl)
rSOUTH GATE I
"AS BUILT" DRAWINGS
TOP & SOFFrF
- FIELD VERIFED -
'PHIS DESIGN WAS INSTALLED BASED ON APPROVAL
DATE: Smog
DRAlAq GS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.: — DATE: -11A
1. 11
WEST
NORTH
24-11
Lr)
21193 "
4() �>
EAST
WEST
—�; I v
---it— —1 [-
158. SOUTH 158.
BROADWAY GATE - TOP PLAN AT CANOPY
SCALE 1�-=V�
NORTH
1
S IFFIT PLAN
@ CANOPY SOFFIT
7Z.,
02
1221 "
1
12-21"
SOUTH
BROADWAY GATE - SOFFIT PLAN AT CANOPY
SCALE 112--=V�-
4(�
EAST
NORTH
—_IV
r
Lu
X a
of �
<
0
0 2�
Z a.
21:1
z
IL
i
IT,
6-
0
SOUTH
0
0 0
co a�
BROADWAY GATE - TOP PLAN
N.T.S.
r BROADWAY
"AS BUILT" DRAWINGS
I GATE PLANS
- FIELD VERIFED -
THIS D SIGN WAS INSTALLED BASED ON APPROVAL
DRAWlNGS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. m. DATE-
J.ATE:
I DRAWN BY: MFC
FA 1. 21
$TO. PARAPET
—.0. CANOPY
0� SIB
$T.O� G�E
P3
4.m REYNOBOND CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
EON LIG NG SYSTEM
F TI
BY OTHERS
—FIBER OPTIC LIGHTING
405"
(TYP. @ PRIMARY COLUMNS)
BY OTHERS
2'.2' STUCCO COLUMN
(PRIMARY), BY OTHERS
1 -.1 - STUCCO COLUMN
(SECONDARY), BY OTHERS
NORTHWEST ELEVATION AT PAVILION
SCALE lW=1'4-
$TO. PARAPET
$ ..o� C-0-
$TO. SIB
$T.O� G�E
T �l T 1�
IBM
M
4
SOUTHWEST ELEVATION AT PAVILION
SCALE: 1W=1'�"
z
0
4.m REYNOBOND CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
----NEON LIGHTING SYSTEM
>�
BY OTHERS
FIBER OPTIC LIG
(TYP. @ PRIMARY COLUMNS)
BY OTHERS
2'x2' STUCCO COLUMN
(PRIMARY), BY OTHERS
1'xl'STUCCO COLUMN
(S ECONDARY), BY OTHERS
�T.
0 0
ACCESSIBLE RAMP
BY OTHERS
0� co
0
r-PA-VIL-ION--1
"AS BUILT" DRAWINGS
ELEVATIONS
- FIELD VERIFED -
THIS D SIGN WAS INSTALLED BASED ON APPROVAL
DATE: 815109
DRAWINGS AND T.F.C.S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.: DATE:
DRAWN BY, MFC
A2. 11
T T T T
REYNOBOND CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
,IGHTING SYSTEM
BY OTHERS
OPTIC LIGHTING
RIMARY COLUMNS)
3Y OTHERS
TUCCO COLUMN
�RY), BY OTHERS
TUCCO COLUMN
DARY), BY OTHERS
SOUTHEAST ELEVATION AT PAVILION
SCALE 1W=1'�-
T T T T
REYNOBOND CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
JGHTING SYSTEM
3Y OTHERS
OPTIC LIGHTING
RIMARY COLUMNS)
3Y OTHERS
TUCCO COLUMN
kRY), BY OTHERS
TUCCO COLUMN
DARY), BY OTHERS
'CESSIBLE RAMP
3Y OTHERS
GNORTHEAST ELEVATION AT PAVILION
1 $�- 11-1-0
"AS BUILT" DRAWINGS
- FIELD VERIFED -
THIS D SIGN WAS INSTALLED BASED ON APPROVAL
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.- DATE-
z
0
Q,
'o
�T.
ELEVATIONS
0 0
. Acd
l4k, 5* 55j- 13j',
G250 T_ U 1 IW7
Q6
0
(124
4— REYNOBOND
CHAMPAGNE METALLIC (24 18
ACM PANELS, BY T.F.C.
G24 Wd
18
2 ----------------
NEON LIGHTING SYSTEM
BY OTHERS
Gl�
I �n i �A
GLASS BLOCK BY OTHERS
7
48" 10j, z
48j' 44*' LH-L
F-
Lu
SIDE BY OTHERS -STUCCO BY OTHERS
4,
A
0.
ATION AT SOUTHGATE
SCALE.lW=I'�
(4NORTH ELEVATION AT SOUTHGATE - DRAWN FLAT
SCALE: 114"=T�'
0 a�
(7) Z (L
TT TIT T
17il
G 5
z
(28 G� �8 424
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C. —
-Q,
G 8 2� 'o,
ISO o
.............................
-- --- --- -- --- --- ------ --- -- -- --- --- -- -
I F;r V3.1 NEON LIGHTING SYSTEM 14j'
BY OTHERS �T_ 0 0
- 1 9 TL
GLASS BLOCK BY OTHERS 74t4
9
T
4GLI IT
Mwi
I..RE. �..L
— 7$IDE
C.R�.. PA.EL
G'
G f8'
r8
WG-
io+,
4* 47+' LH—tio
10j"
_E� SIDE BY OTHERS 7-T."' -STUCCO BY OTHERS r SOUTHGATE
I.. VE. P "AS BUILT" DRAWINGS ELEVATIONS
- FIELD VERIFED - DATE: 815M
THIS DESIGN WAS INSTALLED BASED ON APPROVAL
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
WEST ELEVATION AT SOUTHGATE DTLR: DATE: _
A�SOUTH ELEVATION AT SOUTHGATE - DRAWN FLAT SCALE: 14'=T�'
29 SCALE: 14'=l'�- P. M.: DATE: —
WEST ELEVATION OF CANOPY
AT BROADWAY GATE - DRAWN FLAT
SCALE 114-=1�0"
t
RADIUS CoFN'R /�
:EN—DWAL—LI/
@STUCCO
ILL C5PY PANELS FIRST
!1:�RADIUS CORNER
END WALL
gSTU..
INNER ELEVATI N
FACES NORTH
NORTH ELEVATION AT SOUTH COLUMN
AT BROADWAY GATE
SCALE: 114"=1',T
r-4
EAST ELEVATION OF CANOPY
AT BROADWAY GATE - DRAWN FLAT
SCALE 114"=l'�'
RADIUS C(
END V
@STI,
(1-7.1 �,`=----l--:`FI.l
I
BIMINI
a
z
R
z
�S
0 2�
Z a.
z
0
LZ
0
0
0,0
rBROADWAY GATE I
I ELEVATIONS
DATE: 8/5109
L=".=j
F
Af
BIMINI
mumill
� i�
o
00
rBRO—WAY GATE I
3D ELEVAnONS
DAM: 815109
SHIELD I' I � n 14
(�� PAVILION SECTION
��l SCALE: 1-112"=V-0"
SUSPEN
BY OTHERS
MM ACM PANELS
(BY TFC)
SECTION AT NORTH GATE
��l SCALE: 1-112"=V-0"
ICE AND WATER SHIELC
n
Ic
(BY7MF---
--X
/-B--'\
SOFFIT EN:T BY
n
'T
a3)
SO F
OTHERS
HER.
.0
BYO
SUSPENDED SOFFIT BY
OTHERS
(�i) SEC
LE71ON AT SOUTH & NORTH GATES
��l SCA 1 1/2"=J,_O,
SOFF
c
SUSPENDEE
BY OTHERS
5 � SECTION AT BROADWAY GATE
\A3.1 )SCALE: 1-112"=l'-T
SUSPENDED S
BY OTHEP
(2) SECTION AT SOUTH GATES
\,�l SCALE: 1-10=1'-01
"AS BUILT" DRAWINGS
- FIELD VERIFED -
THIS D SIGN WAS INSTALLED BASED ON APPROVAL
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.: DATE:
I
BIMINI
m
M
E-
R
ED
-T:
a.
z
0
0 E-
X. �:)
C9 0 o
N � �<,
0
r))
rSOUTH GATE I
SECTIONS
DATE: 8/m
tDRAWN BY: MFC I
FRAMING�� /-CLIP EXTRUSION
BY OTHER
4mm REYNOBOND
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
ATYP. HORIZONTAL & VERTICAL JOINT
SCALE &'=l'-G"
/--ROOF MEMBRANE
BY OTHERS
4mm REYNOBOND-------_
I
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C. FINISH CLIP
4-471-STEEL
>lj
WEEP HOLES-----'_� BY OTHERS
7---FRAMING
BY OTHERS
PARAPETIROOF SIDE TERMINATION
SCALE 6"=V-0"
4= REYNOBOND_
u
CHAMPAGNE ;ZTrLLIC
By T.F.C�
ACM PANELS BFPOATMING
I ----------- Y HERS
TRIM- I BY T.F.C.
-START CLIP
FINISH CLIP
��17
j7�_T
RIM- I BY T.F.C.
4mm REYNOBOND-
FRAMING
1,
CHAMPAGNE METALLIC if
BY OTHERS
WEEP HOLES
ACM PANELS, BY T.F.C.
( STARTER DETAIL
�� SCALE 1=1."
END DETAIL
(�) SCALE 6"=l'-Il'
�-_�A-4mm REYNOBOND
C CHAMPAGNE METALLIC
IIM PANELS, BYT.F.C.
FINISH CLIP -is
STUCCO
q
BY OTHERS
STEEL
BY OTHERS RIM- I BY T.F.C.
FRAMING
BROADWAY GATE DETAIL
SCALE &'=T-0�
N
-FRAMING
BY OTHERS
-STUCCO
BY OTHERS
TRIM-2
BY T.F.0
FINISH CLIP
FRAMING -
BY OTHERS
EXTRUSION--�,
BY T.F.C.
4mm REYNOBOND
WITH EXTRUSION AND CLIP
CHAMPAGNE METALLIC
ACM PANELS, BY T.F.C.
FRAMING- ATTACHED AT HORIZONTAL JOINTS
BY OTHERS
(G-�SOUTH GATE DETAIL
ION "B" SCALE: V=V-0`
( SOUTH GATE DETAIL
:�)OPTION "A" SCALE 6"=l'-T
"AS BUILT" DRAWINGS
- FIELD VERIFED -
THIS D SIGN WAS INSTALLED BASED ON APPROVAL
DRAWINGS AND T.F.C.'S PROJECT SCOPE OF WORK.
DTLR: DATE:
P. M.: DATE:
BIMINI
.m
z
F-
LU
af
0.
0 7�
Z (L
z
0
�T. 0 0
0
ZDETAIL,S
P.
�AWN Sy: MFC