Loading...
HomeMy WebLinkAbout87-5002 BFGC PAVING, DRAINAGE & UTILITIES PLANcc W M M cc 1, is IL W 0 n 0 UJI D U) Z 04 —IL-0 013 C4 Q Z I- u M Lo U" I't n 0 =ta!IL Jz - -z-z -,87 CITY ENGINEER�3 DATE DIRECTOR OF COMMUNITY DEVE. DATE 6�� �2- DIRECTORJOF PUBLIC WORKS DATE COMMUNITY 9 'T i L I I CLP PROJECT No. 87-4501 MUNICIPAL GOLF COURSE COMPLEX PAVING, DRAINAGE AND UTILITIES PLAN JANUARY,1988 FDEEP PARX + DEER PARK UPPER SAN JAC!NTO SAY 4- A 0 F I----------- AIRFORT _J +1 Inn - — — - — - — - — - r ------ ___/ ---------- - — - — - — - — -- �: -- - — - — --- - - — - — - — Im IN is I ]I 731rr_111 Ul n LA BARBOURS_CUT GALVESTON SAY PROJECT LOCATION f GENERAL NOTES 01. Contractor is to notify the City of La Porte ("the City") Project representative 48 hours prior,. to commencement of construction. The City project representative will be appointed prior to the pre -construction conference. 02. Contractor is to notify Dist. 12, State Department of Highways and Public Transportation 48 hours prior to commencing work in the south Broadway (Loop 410) right-of-way (i.e. water line crossing, intersection of pavement struc ures, an or resetting of existing culverts.) 03. The Contractor is to provide adequate traffic control measures for work performed in the south Broadway (Loop 410) right-of-way (i.e. flagmen, barricades, etc.) Additional compensation will not AY be paid. 04. Contractor is to make necessary precautions to ensure trees are saved where indicated on the plan. 05. The City is to provide an adequate area for construction staging. The location of this staging area will be announced. at the pre -construction conference. 06. Fire hydrants and valve numbers show on the plans refer to City of La Porte utility maps. 07.. Elevations shown on the plans are based on NGS 1929 Datum with 1978 releveling. Reference bench mark is La Porte Survey Monument No. 58, (a brass cap w/punch mark located on the east side of Broadway, south of ORB street, Elev. = 11-76) 08. The Contractor is to verify the location of all existing u tilities Drior to commencement of construction. Utilities shown on the plans are to be considered as approximate locations; others may exist. The Contractor shall repair any existing utility damaged during construction at his own expense. Southwestern Bell telephone should be contacted to uncover their cable adjacent to the bore pit for the water line crossing of Broadway St.- 09. The Contractor is to follow recommendations in the soils report prepared by Coastal Testing Laboratory + which has been furnished in the contract documents. 10. The City shall arrange for afl materials testing during construction operations at the City's expense. 11. The City has agreed to maintain Harris County Flood Control District Unit A 104-12-01 within the golf course boundaries. The Contractor is not required to contact- HCFCD for permits and construction inspection.. n -j 0 LLJ 3 20 :) Z 04 (.) �Y -j LL .j CDC-) Z 0 — LO Z > LL g-m;o co 2 CL C%l No Text m LLI z M m 0 -J U) w M P 0:3 0 r- uj:) IQ 0 Di 0 () U-i 2! IN Z U-0 Z LL r� m � 0 co 2 ILe