HomeMy WebLinkAbout8" WATERLINE EXT. ALONG SH 225 FROM MILLER CUT-OFF RD. TO 2400' EAST0 J Q N N Q LL0 m ow =_ Lo< =� N Q = L. as � LL m - �5 0 0 U ccM ODW , a J c2<030 C mi QO O v%� N Q LL � CONSTRUCTION PLANS FOR 8" WATER LINE ALONG THE NORTH RO.W. LINE STATE HIGHWAY 225 FRONTAGE FROM MILLER CUTOFF ROAD TO APPROX. LA PORTE, TEXAS S.H. 225 PROJECT - LOCATION VICINITY MAP SCALE: N.T.S. ATR Engineering 21334 Hadrian Katy, Texas 77449 Facsimile 713-355-3501 Voice 281-345-1998 OF ROAR 2400 SHEET NO. DESCRIPTION 1 ........... COVER SHEET 2 ........... PROJECT LAYOUT AND GENERAL NOTES 3-8 ........... PLAN AND PROFILE -- STA. 0+00 TO STA. 24+00 9 ........... NOTES AND DETAILS 10 ........... PROJECT STORM WATER POLLUTION PREVENTION PLAN ME .0 CONSTRUCTION AS BUILT DATE:02-14-03 SHEET 1 OF 10 lnn-)_'7cr%9. CONSTRUCTION NOTES ;i:U14 flit TEXAS DEPARTMENT OF TRANSPORTATION Specifications For Placing Utility Lines Within The Right -of -Way Of State Maintained Highways LL_ Lt_ O F_ 0 U ry W J i u SHEET 3 w 0 1. All construction shall be in accordance with the plans and the specifications contained in the contract documents as well as current construction standards for City of Lo Porte Department of Public Works and Engineering as currently ammended. 2. Contractor shall obtain all permits required by State of Texas, Harris County, City of Lo Porte for construction of paving, utilities and/or culverts within public rights of way. The Contractor shall notify Texas Department of Transportation 72 hours in advance of commencing any construction in the street or road right-of-way. (Refer to requirements detailed in TxDOT Permit No. 3. Contractor shall obtain all permits required by all governing agencies having jurisdiction over this project prior to starting construction and shall comply with the regulations of Harris County, Texas for Flood Plain Management. 4. All clearing, grubbing, stripping, excavation, fill and compaction shall be in accordance with the project specifications. 5. The work area shall be secured and illuminated during darkness and periods of inactivity when in an area accessible to the public. 6. Adequate drainage of the project shall be maintained at all times during construction. The Contractor shall conform to the requirements of the Pollution Prevention Plan and be responsible for protecting, maintaining, and restoring all drainage systems on or adjacent to the project site and any drainage ditch or structure disturbed during construction shall be restored to the satisfaction of the owning authority. 7. Surface Restoration: At the end of all construction work, the Contractor shall restore existing facilities t existing conditions prior to construction. i.e. property) equal to or better than 9 P ( l P Y) q 1 and maintained per TxDOT II be hydro mulch seeded 1 public right of way shall 8. All disturbed areas within p g y yd p Specification Item No. 164 until turf is established and accepted by the Texas Department of Transportation. I lines may exist on or adjacent to the property. The drawings may not show those 9. WARNING* Overhead to s Y Ja P oP Y 9 Y lines since they are clearly visible, but the Contractor should locate them prior to beginning any construction. Texas law, Section 752, Health & Safety Code, forbids all activities in which persons or things MAY come r the work Including contractors I sad high voltage lines. Parties responsible fo within six 6 feet of live overhead 9 () 9 9 are legally responsible for safety of construction workers under this law. This law carries both criminal and civil liability. To arrange for lines to be turned off and/or moved, call Houston Lighting & Power at (713) 207-7777. Any and all expenses associated with this shall be Included in the price bid for the project. 10. Texas law Article 1436c, prohibits all activities in which persons or equipment may come within six (6) feet of energized overhead power lines, and Federal Regulations, Title 29, Part 1910.180(1) and Part 1926.550(a)(15) require a minimum clearance of ten (10) feet from these facilities. The above laws carry both criminal and civil liabilities, with contractors and owners being legally responsible for the safety of workers under the laws. If the project requires workers to work near overhead power lines, call (713) 207-7777 for the lines to be de -energized and/or moved at the Contractors expense. Any and all expenses associated with this shall be Included in the price bid for the project. 10. Contractor to make connection to meter vaults. 11. Proposed fire hydrants shall be some model and type as existing. 12. Contractor to give 48 hrs. notice to the Public Works Department. 13. City of La Porte will operate all water valves. 1. Al/ excavations within the right-of-way not under surfacing shall be backfilled by tamping In 6" horizontal layers and/or as directed. All surplus material shall be removed from the right-of-way and the excavation finished flush with surrounding natural ground. 2. Areas where sodding is disturbed by excavation or backfilling operations shall be seeded. Slopes of 4.1 or steeper shall be replaced with block sodding. This work shall be /n accordance with Texas Department of Transportation (TxDOT) specifications. a Highway crossings shall be bored under surfaced roads and surfaced crossroads along the right-oi�-way. . Boring shall extend from crown line to crown line. 4. Use of water or other fluids In connection with boring operations will be permitted only /n sufflc/ent quantity to lubricate boring bit and to provide a smooth flow of cuttings. Jetting will not be permitted. 5. Pipeline material and design for high pressure Imes must meet the minknum Federal Safety Standards for Uqu/d and Gas Pipelines. 6. Operations on the highways shall be performed In such a manner that operating equipment and excavated I o the pavement at all times. motets are kept off eP 7. Barricades, warning signs and Bagmen (when necessary), shall be provided by the contractor. A minknum of one travel lane of the roadway must remain open to traffic at all times he railroad company. Work - the concurrence of t l right-of-way wa /s subject to 8 Work performed on the railroad N P 9 Y lea performed within the waterways - such as rivers, creeks, bayous and drainage d/tchss, Is subject to the concurrence of appropriate governmentalagency. PP Pdate 9 9 All manhole covers shall be installed Bush with the ground level. The roof of communications manholes shall be at least 5' below ground. 10. No raw sewerage or effluence from septic tanks, car washes or sfm!lar facilities shall be drained In state highway storm sewer systems. It. Power transmission line crossings over highways shall be constructed and maintained minimum of 22' above the surface of the traffic lanes. For power lines over 50,000 vats, the clearance shall be increased /n accordance with the National Electric Safety Code as published In the National Book of Standards, Handbook 30. 12 Communications lines crossing over the highway shall be constructed and maintained a minimum of 18' above the surface of troffia 1.3: Work covered by this permit shall be so conducted that it will not Interfere in any way with highway construction or repair work, or any state maintenance work that may be done on this road. In the event such Interference occurs, contractor will cease operations within the area of conflict until such time as the road work referred to above Is completed. HOUSTON POLYMERS TERMINAL, LLP. 71.4228 AC. VOL 1318, PG. 364. H.C.D.R. 11. All existing power poles, light standards, signs, etc. which affect the proposed construction, shall be removed and/or relocated by the Contractor, as required, whether shown on the drawings or not. Any and all expenses associated with this shall be included In the price bid for the project. 12. All testing procedures used on this project shall conform to City of La Porte standards and requirements. The initial testing expense shall be bome by the contractor and shall be included in the price bid for the project. If any of the test results do not meet the specifications, it shall be the Contractors responsibility to remove and replace such material so that the specifications can be met. Additional testing to prove compliance with the specifications shall also be at the Contractor's expense. 13. All utilities represented on these drawings are shown at the approximate locations based on the best available information. Some of the existing underground utilities shown hereon have not been field verified. They have been plotted from information obtained from the City of Lo Porte and/or private utility companies. The Contractor shall field determine the exact locations prior to commencing construction. The Contractor shall .be responsible for any and all damages caused by his failure to exactly locate and maintain these underground utilities. 14. The Contractor shall notify "LONESTAR NOTIFICATION CENTER" at 713-223-4567 and 'TEXAS ONE -CALL SYSTEM" at 1-800-245-4545 a minimum of 48 hours in advance of construction to verify location and depth of all existing utility lines. Contractor shall uncover existing utilities at all 'points of crossing" with proposed underground lines to determine if conflict exists before commencing any construction. Notify the II field modifications without the prior an conflict. The Contractor shall not make an Engineer at once of P approval of the Engineer, Cobb, Fendley & Associates, Inc. Phone No. 713-462-3242, Fax No. 713-462-3262. This approval must be obtained prior to resuming any construction in the affected area. Porte, Department of Public Works and Engineering (Telephone: 15. The Contractor shall not/ the City of La rt notify Y P 9 9 ( eP (281) 471-5020) 48 hours before starting work in street rights of way or easements. 16. The contractor shall comply with current OSHA regulations, State of Texas Law and current City of La Porte ordinances and the appropriate sections of the specifications concerning trenching and shoring. u:LTn�L? 1. Contractor shall cover all excavations in the pavement with anchored steel plates during non -working hours. All repairs to existing pavement shall be in accordance with City of Houston Drawing No. 411-S-2, Including all revisions, thereto. 2. Contractor shall provide and install traffic control devices in conformance with Part M of the "Texas Manual on Uniform Traffic Control Devices" (Most recent edition as revised) during construction. No lanes shall be blocked between the hours of 7:00 to 9:00 A.M. and 4.00 to 6:00 P.M. Monday through Friday. 3. in order to block any portion of the roadway, a separate permit issued by the Texas Department of Transportation is required to be kept at the job site. 4. Off -duty uniformed Police Officer(s) are required to direct traffic lanes that are blocked. The Contractor shall retain the services of these officers at his expense. KEY MAP #539-L & Q WATER CONSTRUCTION NOTE All mechanical joints shall be EBAA series 2000PV joints for us a with C-900 per City Of La Porte requirments unless specified otherwise directly on plans. - DATE: 02-14-03 a WO �N ~ 0 Z U) z 0� I� LLQ tOQ a¢ - _ om CV o =LL z� - • a LL jf� ¢ �U - O ¢ ow b W coa 04 in N Q � M l 0 J �o LU o C9 N I¢- F- ZQ WW LL p Lo Q N r" 2 L. L. �U °°WDf omOo N Q LL V Q 4-11 IF 14 1 I.....!.U....i.............................. W c W V 0 0 0 v �f i STA. 6+36, O/S 3, RT. 1 FIRE HYDRANT, M.J. 1-6" GATE VALVE & BOX M.J. 1-8" X 6" TEE, M.J. SEE F.H. LEAD P.I. Ste. 6+75.48 INSTALLATION Fnd. Disturbed TxDOT Mon. DETAIL SHEET 9 " F S18'44 54 7+00 Exist. 2-6" MPP LPG Pipeline ............................................................... Edge Of Pavement 8+00 HOUSTON POLYMERS TERMINAL 71.4228 AC. VOL. 1318, PG. 364, H.C.D.R. c U H Power Una FUTURE 8" CONC. DRIVEWAY PER TXDOT RQMTS. NO SAWCUTTING OF EXISTING PVMT STATE HIGHWAY 225 TER M R] to MPP LPG Pipeline ( 9+00 �I— CAUTION: EXISTING S.W.B.T. CO. FACILITIES IN CONSTRUCTION AREA. VERIFY EXACT LOCATION & DEPTH PRIOR TO ANY DIGGING AND/OR BORING. EXISTING RELIANT ENERGY HL&P FACILITIES IN CONSTRUCTION AREA CONTACT REUANT ENERGY HL&P 48 HOURS PRIOR TO ANY DIGGING AND/OR BORING. CALL BEFORE YOU DIG ! TEXAS ONE CALL PARTICIPANTS REQUEST 48 HOURS NOTICE BEFORE YOU DIG, DRILL, OR BLAST - STOP CALL Texas One Call System 1-800-245-4545 NOTE: THE INFORMATION SHOWN ON THIS DRAWING CONCERNING TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS AS TO TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND PIPELINES, CONDUITS AND STRUCTURES BY CONTACTING OWNERS OF UNDERGROUND UTILITIES OR BY EXCAVATING IN ADVANCE OF CONSTRUCTION. CONSTRUCTION AS BUILT PRIVATE UTILITY LINES SHOWN DATE: 02-14-03 .................................. ............................... _..................................................... ........ ............................................ RELIANT ENERGY - ENTEX M 24 RELIANT ENERGY - H L & P Approved Only for Crossing Underground Duotilnes Unless Noted. Valid at Time of Revised Only. SOUTHWESTERN BELL TELEPHONE CO. Valid For One Year Only. (E OF Tpi i * : It ,AARON T. RENDON 86357 . 0� �t,�Os''�'tiCENS�,r' 9-03 22......_ATR Engineering 21334 Hadrian Katy, Texas 77449 20 Facsimile 281-80-2979 Voloe 281-345-1998 PROP. 8" WATER LINE 18 STATE HIGHWAY 225 STA. 5+00 TO 10+00 STATE HIGHWAY 225 CITY OF LA PORTE HARRIS COUNTY, TEXAS APPROVED W.......i.......... ......................... ....................... i........._...2........ CITY OF LA PORTE CITY ENGINEER DATE SUBMITTED: DESIGNED BY: DER ........................................................................................._ 1•-20' SCALE: 1•-2, DRAWN BY: SO DATE: 09/05/01 SHEET NO 4 OF 1OSHEErS a 10 ........:....... . SURVEY BY: CITY DWG N0: -00 F B NO: J � O LLI o Q N a o Z CO z l O� �m m m LL.Q m Lo a: N Z = 2LL. za' �O _ m J E {•n w �U om oLU w �Jg LL N m O NQLLLO ',. U O Z U 000 col to IL C01< L (n N N O O d V � N f' a W o l O 'V' V (L 4 a HOUSTON POLYMERS TERMINAL SEE F.H. LEAD 71.4228 AC. INSTALLATION VOL. 1318, PG. 364, H.C.D.R. DETAIL SHEET 9 1a+oo M verhead Power Une Fnd. Cone. TXODT Mori. 18+00 T North R.O.W. 17+00 Exist. ?-6�MP: LPG Pipeline \PROP. 8" WATER MAIN (PVC, C-900) STA. 19+48, O/S 24, RT. 1-8"X 8" TS&V W/ BOX STA. 16+11, O/S 14' RT. 1 FIRE HYDRANT, M.J. 1-6" GATE VALVE & BOX M.J. c I 1-8" X 6" TEE, M.J. -j w1w � o LU o N W W z(n z O� BE D_ m - LLp om N Q _ z04 za SLL _ w . LL cn0 m o .J I ^ �s :3 �U m BD 00 I Lu H N Do OR O (b � N Q LL CO 1 I� FUTURE 8" CONC. DRIVEWAY PER TXDOT ROMTS. NO SAWCUTTING OF EXISTING PVMT U rdaept Pavement a FEEDER ROAD STATE HIGHWAY 225 Power Line z rn v N O --....... 0 o CAUTION: EXISTING S.W.B.T. CO. — - FACILITIES IN CONSTRUCTION AREA. VERIFY EXACT LOCATION & DEPTH PRIOR TO ANY DIGGING AND/OR BORING. CAU EXIISTING�RELIANT ENERGY HL&P FACILITIES IN CONSTRUCTION AREA CONTACT RELIANT ENERGY HL&P 48 HOURS PRIOR TO ANY DIGGING AND/OR BORING. CALL BEFORE YOU DIG ! TEXAS ONE CALL PARTICIPANTS REQUEST 48 HOURS NOTICE BEFORE YOU DIG, DRILL, OR BLAST — STOP CALL Texas One Call System 1-800-245-4545 NOT THE INFORMATION SHOWN ON THIS DRAWING CONCERNING TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONSAS TO TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND PIPELINES, CONDUITS AND STRUCTURES BY CONTACTING OWNERS OF UNDERGROUND UTILITIES OR BY EXCAVATING IN ADVANCE OF CONSTRUCTION. PRIVATE UTILITY LINES SHOWN DATE: 02-14-03 -- I..",", ___. _ ._......__... RELIANT ENERGY - ENTEX 0 0 c m w W z m � W 0 z � 0 z ' z a 0 O W 0 N Z LL 0 Lo N QO N W = LL LL J 0 'SU �W0� J co g o°?ch Oo ',..., N Q LL ti Fut. Water Meter o (By Others) Fut. 10' x 20' a Water Line Esm t. SEE F H LEAD INSTALLATION DETAIL SHEET 9 +00 S66'44'54"E O V7 O =�E-<ist. 2-6" MPP LPG Pipeline tN Lo z J STA. 20+69, O/S 27' RT. 1 FIRE HYDRANT, M.J. 1-6" GATE VALVE & BOX M.J. 1-8" X 6" TEE, M.J. 4 inr HOUSTON POLYMERS TERMINAL 71.4228 AC. VOL. 1318, PG. 364. H.C.D.R. c o v o Q 22+00 i 0 N s 0 i i 0 M� a I I c v l vo W I h o > -6aN .��I adN .a1 0n a> o+ aLo ii o-o 00o n'cn o '> co c� Sro o o oro ..ro a W prn o La_S {- O a_ v CO v. W- a-' 0- N d 80' H IMNe Oil Eosemeni Set 5 8 I.R. 26+00 23+00 24+00 25+00 ern d4'55" North R.O.W. _ _ a t _ set D surbed Set Conc. Mon. — Exist 8" Water Line �----- PROP. 8" WATER MAIN - ...................................... (PVC, C-900) 10 L.F. PROP. BORE & JACK . 1-8" WET CONNECTION Edge Of Pavement 1-REMOVE 8" PLUG &CLAMP STA. 22+00, O/S 27, RT. & CONNECT PROP. 8" WATER 1-8" GATE VALVE & BOX, MAIN TO EXIST. 8" WATER MAIN M.J. STA. 20+49, O/S 26, RT. X 8" TS&V W/ BOX, IN. mZ#1 mt;m ��■, 16 PROP. 8" X 1 10a I 20 50 6" F.H. MPP STATE HIGHWAY 225 2,C f a CAUTION: EXISTING S.W.B.T. CO. FACILITIES IN CONSTRUCTION AREA. VERIFY EXACT LOCATION & DEPTH PRIOR TO ANY DIGGING AND/OR BORING. CAUTION - EXISTING RELIANT ENERGY HL&P FACILITIES IN CONSTRUCTION AREA CONTACT RELIANT ENERGY HL&P 48 HOURS PRIOR TO ANY DIGGING AND/OR BORING. CALL BEFORE YOU DIG I TEXAS ONE CALL PARTICIPANTS REQUEST 48 HOURS NOTICE BEFORE YOU DIG, DRILL, OR BLAST — STOP CALL Texas One Call System 1-800-245-4545 tlx: THE INFORMATION SHOWN ON THIS DRAWING CONCERNING TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS AS TO TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND PIPELINES, CONDUITS AND STRUCTURES BY CONTACTING OWNERS OF UNDERGROUND UTILITIES OR BY EXCAVATING IN ADVANCE OF CONSTRUCTION. CONSTRUCTION AS BUILT PRIVATE UTILITY LINES SHOWN DATE: 02-1403 .............................................................................................................................................................................................................................................................. RELIANT ENERGY - ENTEX RELIANT ENERGY - H L & P Approved Only for Crossing Underground Duotllnes Unless Noted. Valid at Time of Revised Only. 28 Of Pavement --' --_ 26 e Bart 24 . PROP.: 8" Plug; & 6' Water Line ............................... ...................... ................ .................. I...... 22+00 23+00 24+00 SOUTHWESTERN BELL TELEPHONE CO. Valid For One Year Only. ............... ....:... ...:.... ....:.... ....:.... ....:.... Engineering "n i ngi ng 21334 Hadrian 20 Katy, Texas 77449 Facsimile 281-855-2979 ............................. ................ .............. ........_................... ............................. ... ........... ................... ....os o v r 281-34s-1988 B" Water Line ............. ............. ........... ...................... ............... PROP. 8" WATER LINE 18 STATE HIGHWAY 225 ............................................. ............ ................. ..?............. .................. ................ ........ ........... ........... ........... ............... 20 50 TO END STA -I- 16 ...................................._............... .................. ..........................................€............... ........... ........... STATE HIGHWAY 225 CITY OF LA PORTE ............ HARRIS COUNTY, TEXAS 14 ............................................................................................................._.................................................... ........... ........... ................... APPROVED CITY OF LA PORTE 12 ........ ..........................CITY . ........................ ....:.... ........ ........ ....:.... ....:.... DiGINEER DATE SUBMITTED: DESIGNED BY: DER .......................................................':...................................._ ............... ................... t... 1'-20' SCALE 1•®2• DRAWN BY' SD DATE: 09/05/01 SHEET NO 7 OF 1OSHEETS 10 SURVEY BY: CITY DWG NO: trju'"r I.um i Cr ❑ J � O W O � N Z LL Q Lo = LL U5 LL J O �0 Wry U04 J oci��� NQLLCO a T SL 0 STA. 19+48, O/S 24, RT. 1-8"X 6" TS&V W/ BOX STA. 19+52, O/S 24, RT. 1-8" GATE VALVE & BOX, M.J. 000 Os to O v s --1 Tn m 1 1 Power Pole Anchor 71.4228 AC. VOL 1318, PG. 364, H.C.D.R. STA. 20+49, O/S 26, RT. 1-8"X 8" TS&V W/ BOX STA. 20+53, O/S 26, RT. 1-8" GATE VALVE & BOX, M.J. s z KEY MAP #53841 2—LPG Pipeline Mkr. 0 0C C� o x mo rt CONSTRUCTION AS BUILT DATE: 02-1403 CAUTION: EXISTING S.W.B.T. CO. FACILITIES IN CONSTRUCTION AREA. VERIFY EXACT LOCATION & DEPTH PRIOR TO ANY DIGGING AND/OR BORING. cs mim EXISTING RELIANT ENERGY HL&P FACILITIES IN CONSTRUCTION AN WL CONTACT RELIANT ENERGY HL&P 48 HOURS PRIOR TO ANY DIGGING AND/OR BORING. CALL BEFORE YOU DIG 1 TEXAS ONE CALL PARTICIPANTS REQUEST 48 HOURS NOTICE BEFORE YOU D16, DRILL, OR BLAST -STOP CALL Texas One Call System 1-800-245-4545 NOTEm THE INFORMATION SHOWN ON THIS DRAWING CONCERNING TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS AS TO TYPE AND LOCATION OF UNDERGROUND UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND PIPELINES, CONDUITS AND STRUCTURES BY CONTACTING OWNERS OF UNDERGROUND UTILITIES OR BY EXCAVATING IN ADVANCE OF CONSTRUCTION. 1 oLL i (D N O� LL 11 _LL — LL J 0 �SU toWCm 03 o(b OR 0 NQLLW 900 (114) BEND (USE MECHANICAL JOINT FITTINGS) COMPACTED BACKFILL 3" 7HRU6' VALVES T-3" SQ. 8" THRU14" VALVES V-6' SQ. r 221120 (1116)OOR 450 (118) HORIZONTAL BEND (USE MECHANICAL JOINT FI TTINGS) PRECAST CONCRETE PAD D T !11-1 TlT ATZ-1 IIIl1 Z3 A ?'L' TT A T TTL' V SHALL BE DOUBLE -WRAPPED IN PLASTIC PRIOR TO BACKFILL AS REQL BYVALV ti TEE ( USE MECHANICAL JOINT FI T T T NGS) SECTION A A" (USE MECHAMC4L JOINT FITTINGS) 1'-0" tIIN. 8tt WYE (USE MECHANICAL JOINT FITTINGS) SECTION "B-B" (USE MECHANICAL JOBVT Fn73NGS) FOR GATE VALVES 16" & LARGER WELDED STEEL PIPE CASINGLD. OF CASING PIPE TO BE A MIN. OF 2" LARGER THAN O. D. OF BELLS ON SANITARY CASING S1�SAT RF7.7.AND SPIGOTENDSOFG4RRIER MALONEY PIPEANDAT MIDSPANOR IU MULTI. O.G OR WIHOMPER IS LESS HYDROLOCKREQUIRED (MO SEAL OR STEEL CASING OR SLEEVE DETAIL FACE TO STREET EQUAL) EACH FIRE HYDRANT TO BE END AMERICANDARLING OR MUELLER CENTURION m, AS BOREPIT (IF SHOWNON PLANS) CROSS (USE MECHANICAL JOINT FITTBVGS) VALVE -J 0 N PLUG BLOW -OFF DETAIL (USE MECHANICAL JOINT FITTINGS) NOTE: Fittings, valves and pipe joints shall be secured with mechanical joint restraints. These restraints shall be EBAA Iron 2000 PV for fittings and EBAA Iron Series 1500 forpipe joints or approved equal 450 (118) VERTICAL BEND ( USE MECHANICAL JOINT FTIIINGS) i NOTE: A 2X2X2'-0" STAKE BENDS NOT TO EXCEED SHALL BE PLACED IN THE TAPPING COLLAR OR MANUFACTURERS SURFACE DIRECTLYABOVE (SADD(STAINLESS STEEL)RECOAMfENDAHONS WYE. STAKE SHALL BE LE rI'VC MAIN EXPOSED 6' &PAINTED BLUE. CORPORATION STOP & INSERT 6' GATE VALVE GRAVEL OR O CONCRETE THRUST BROKEN STO BRACING _ • ��? 2" HMAC TYPE ttDtt tt _ CLASS "B" CONCRETE RABBIS CO. MIXDESIGN CONCRETE THRUST BRACING CLASS "B" CONCRETE 18" X 18" X 4" CONC. PAD unu 129 illl'[ ALLATION (USE MECHANICAL JOINT FIIIINGS) CEMENT SAND @ 1112 SACK/TON COMPACTED TO 95% J DETAIL 6' FULL WI BANKSAM l LE, REQ'D. LENGTH, WITHADAPTEA B STOP & STEEL INSERT GLE SERVICE) l"I.D. FOR SINGLE SERVCE 1" X 1" X 1"X 71/2" SPREAD "Y" BRANCH WITH 1"I.D. FOR DOUBLE 2 CURB STOPS, ADAPTED & STEEL INSERT SERVICE (POLYETHYLENE) (DOUBLE SERVICE) SERVICE CONNECTION NATURAL GROUND BEDDING CROSS SECTION FIT WNym CITY OF LA PORTE 604 W. FAIRMONT PKWY. LA PORTE. TEXAS PLANNING DEPARTMENT ENGINEERING DIVISION REVISIONS NO. REVISION / ISSUE DATE 0 ORIGINAL ISSUE 8199 1 REVIEW/UPDATE 2/01 2 REVIEW/UPDATE 3/02 DETAILS DRAWN BY: J.R. CHECKED BY: C.M. APPROVED: D.K. PROJECT: SHEET: DRAFTING STANDARDS DATE: MARCH, 2002 SCALE: 1 OF 1 N.T.S. Li 0 N U Ld J J I KEY MAP #539—L & Q HOUSTON POLYMERS TERMINAL 71.4228 AC. VOL 1318, PG. 364, H.C.D.R. 3.k r NOt 1) 1. SET POSTS AT 2. EXCAVATE A 4'xr TRENCH UPSLOPE REQUIRED SPACING. ALONG THE LINE OF STAKES. 3. ATTACH FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. EXTENSION OF FABRIC INTO TRENCH FILTER FABRIC FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL 1 I 0 l: 2. 5. FILTER FABRIC FLAW SECTION ALTERNATE FILTER FABRIC FENCE CONSTRUCTION NOTES: 1. 2 INCH BY 2 INCH WOODEN STAKES TO BE SET AT MAX SPACING OF 3 FEET AND EMBEDDED A MIN OF 8 INCHES. IF PREASSEMBLED FENCE WITH SUPPORT NETTING IS USED, SPACING OF POST MAY BE INCREASED TO 8 FEET MAX. 2. ATTACH FILTER FABRIC TO WOODEN STAKES. FILTER FABRIC FENCE SHALL HAVE A MIN HEIGHT OF 18 INCHES AND MAX HEIGHT OF 36 INCHES ABOVE NATURAL GROUND. 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHOULD BE OVERLAPPED 6 INCHES AT THE POSTS, AND FOLDED. 4. SEE COH STANDARD SPECIFICATION FOR FILTER FABRIC FENCE FILTER FABRIC FENCE N.T.S. 0 0 0 0 0 0 1 0 0 0 0 ° ° INLET ° 0 0 j L____J j 0 0 0 C C o ° ° 0 0 0 0 0 07 0 0 1 0 0 BALE 4-24 INCHES FROM INLET FLOW 2 INCH BY 2 INCH WOOD STAKE EMBEDED 8 INCHES (MIN.) STAKED STRAW BALE 4' STRAW BALES STAKED WITH 2 STAKES PER BALE Le (SEE• MIN 2) PLAN SECTION INLET PROTECTION BARRIER CONSTRUCTION NOTES: 1. CONTRACTOR SHALL REMOVE STRAW BALE DROP INLET PROTECTION BARRIER IMMEDIATELY PRIOR TO PAVEMENT CONSTRUCTION, AT WHICH TIME, CONTRACTOR SHALL INSTALL DROP INLET BASKETS IN ALL INLETS. DROP INLET BASKETS SHALL CONFORM TO ITEM NO. 4521 - DROP INLET BASKET AS SPECIFIED IN THE 'STORM WATER MANAGEMENT HANDBOOK FOR CONSTRUCTION ACTIVITIES," DATED SEPTEMBER 17, 1992. 2. CONTRACTOR MAY USE DROP INLET BASKETS AS SPECIFIED ABOVE FOR THE ENTIRE LENGTH OF THE PROJECT IN LIEU OF INSTALLING STRAW BALE DROP INLET PROTECTION. STRAW BALE DROP INLET PROTECTION BARRIER N.T.S. Hill-Ti':/_` I�Z ill IIll [•RNa:1A'l*Sd01,0awJlm01:4 III 1. SILT FENCE SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL 2. ALL DISTURBED AREAS TO BE HYDROMULCHED PER CITY OF HOUSTON SPECIFICATION 02921 — UNLESS SPECIFIED OTHERWISE. (REFER TO LANDSCAPE PLAN FOR ADDITIONAL INFORMATION ON GROUND COVER ESTABLISHMENT) --------- FF FILTER FABRIC FENCE IPB INLET PROTECTION BARRIER —� DIRECTION OF FLOW FRN pqc SO�tn wotT� \/F/C Raw u�a (100 'R •0 w T CONSTRUCTION AS BUILT DATE: 02-14-03