October lr, 2006
Mr. Chip Lilly
ValPhoo: Development Texas, IT
5400 Dallas Parkway
Frisco. Texas 75034
Re: Value Place Hotel — La Pone, Texas
Dear Mr. Lilly
Please accept our Proposal in accordance with the quantities identified on your plan C-10.
Our price includes all necessmy labor, material and equipment to perform the additional
off -site work. Work to include 2 sanitary sewer maMoles / ell necessary excavation and
backfill / Warns. 1401.f. of S" pipe / all appropriate clean-up.
Total lump sum price of Ten Thousand Nine Hundred Sixty Pour Dollars ($10,964.00)
Sincerely,
ssv��--
Russell Moore
Project Manager
LSC Contractors, Inc
1-SC COMPANIES
4901 Keller Springs Paad Soho2W Atltllmn Texas react
Phone 872.267.2715 Fax W2M72rr8
12-Oct-06
Value Place Hotel, La Porte, Texas
Sanitary Sewer off site extension
Ilem
Amount
Sanney man holes-2 ea.
S 7.000.00
1401.f. M S sanimn sewer pipe, exeavalion and eacMN
S 2,00000
General Coroners
S 630A0
Cooraclers OH&P
$ 993.00
Total
10.693.00
RAUS CONSTRUCTION, LTD.
OBNERAL CONTRACTOR
CRAIOSI'ANAeRR
PROIEC mANAGH
+ % lam
BRfI'MmeisurtelW �, Phx:IxIIINAS6re
tlWSION. TfiNAe]N1l xmvem®nawm
I
n
y � Exist. 6' Sun. Swr.—
0 .44%
P. SAM MHIFFr
�p-
36JWWW.EriI-S'pAO EFWH. O
11
West I Street
GO, VW)
<,WMVM
w San. Swr.
K@lJ
October 12. 2D06
Mr. Chip Lilly
ValPlace Development Texas, LP
5400 Dallas Parkway
Frisco. TX 7SD34
RE: Value Place Hotel - La Porte, TX
Dear Mr. IRIy,
Thank you for your request for additional information far the new proposed Value
Place Hotel in La Porte, TX. Please And below, Key's response to your questions:
1. Since this project is cost sensitive, please review your submitted Contractor Bid
Foms and revise your estimate to reflect a more competitive estimate. List
areas for real Value Engineering opportunities. You may delete the cost of the
building permit and the labor to install owner supplied equipment.
A Revised Contractor Bid Form Is attached.
2. Provide the estimate to install off -site utilities as described on CIO.
Sonsary Sewer Pipe: $ 3,636
Saniary Sewer Manhole: $ 3,300
Sanitary Sewer Excavation: $ 1.650
Cenhadm OXBP. S 1.6I
TOTAL Off SDE UIILIIES: $10.200
3. Submit a current audited Financial Statement.
A 2005 financial Stafemesd is attached.
4. Submit a detailed project schedule and state how often the schedule will be
updated during the life of this project.
A 210 Calendar Day Construction Schedule Is attached.
5. Provide trade references names.
Naylor Commercial Paint
Design Elechtc
AwCo Mechanical
D8M Construction
Tn Dal Mlitles/Did
Brandt Engineering
Tippen Fabrication
KEY CONSTRUCTION. INC.
value Place - La Pane, T
October 12,2106
Dale Lambed
972-278-2620
Larry Wagers
214-357-5697
Mitch Jenkins
817-590-0088
Carl Deaver
972-432-0800
Steve Hendricks
817-48I-2886
Brion Taylor
817-626-0033
Lee Jack Tlppen
940-433-3132
6. Provide names and financial, insurance, legal, bonding company &
accounting references.
Financial
Intrust Bank:
Bruce Long
Wachovia:
Ken Schmeldbouer
• Insurance:
Locton Companies, Inc.:
Barbie Walker
Legal:
Martin Pringle Oliver Swartz:
Teny Malone
• Bonding Company:
Locion Companies, Inc.:
Barbee Walker
• Accounting:
Grant Thomton:
Dan Meier
7. Provide resumes of the project manager and superintendent which will be
assigned to this project.
A resume for Eric Peterman Is attached.
A resume for Marc Lukso is attached.
8. Provide a letter from the Bonding Company staling your firms bonding
capacity.
A When from our Bonding Company Is attached.
Page 2of3
KEY CONSTRUCTION.INC.
valve Place - la Pone, 1K
October 12, Z1106
9. Provide a statement of your firm's average annually dollar volume completed
over the last five years and the current dollar volume of on -going projects.
2001 sales volume: $136 million
2002 sales volume: $142 million
2003 sales volume: $180 million
2004 sales volume: $219 motion
2005 sales volume: $203 million
2006 sales volume: $191 million on going (November, 2006)
10. Provide punch fist of completed projects.
A list of current and past projects ts aflcched.
11. Provide evidence of your firm's ability to procure the required insurance as
stated in AIA 201.
A cerlMeate of insurance is affached.
Thank you for the opportunity to present our qualifications for this most exciting
project It after your review, you have any questions or comments, or you need
additional information, please feel free to give me a call.
Respectfully Submitted
KEY
^CONSTRUCTION, INC.
/6 /- k
Ted D. Sena
Vice President of Precomfruction
Page 3 of 3