HomeMy WebLinkAboutBATTLEGROUND ESTATES SUBDIVISION FLOODING (PHASE I) November 15, 2011
Mr. Julian Garza Jr., P.E.
Senior Engineer
Planning Department
City of La Porte
604 West Fairmont Parkway La Porte, Texas 77571
Re: Phase 1 Letter Report to address flooding in the Battleground Estates Area.
Dear Mr. Garza:
This phase 1 letter report will document the results of Klotz Associates’ analysis of the culvert
system along stream F101-00-00 at Avenue P, just west of Lemon Lane (see Exhibit 1 & 2). This
report focuses on whether solely upgrading the culvert system at this location will benefit residents in the Battleground Estates area, in regards to past reported structural flooding, by
lowering the flood profiles within the adjacent stream, F101-08-00.
This letter report provides flooding information for a downstream portion of F101-08-00 that
serves as an outfall for drainage from the Battleground Estates addition to its confluence with F101-00-00, see Exhibit 1. F101-00-00 drains an approximate 2.25-mi2 that is bounded to the
north by State Highway 225 (SH 225) and to the west by Big Island Slough. Drainage area
boundaries are shown in Exhibit 3. Development in the area is mainly large lot residential, some
industrial/commercial development along SH 225 and Sens Road., and some smaller lot
residential developments including Battleground Estate.
An existing-conditions hydraulic model was developed to reflect existing conditions along the
waterway with the current structure, (see attached photos). A composite type structure consisting
of 2 – 42” corrugated metal pipes (CMP) (upstream portion, shown in Photo 3) feeding into 2 -
8’(H) x 10’(W) reinforced concrete boxes (RCB) (downstream portion, shown in Photo 1). The upstream ends of the concrete boxes have been bricked around the 2 - 42” CMPs, and the 2 – 8’x10’ RCBs outlet into an improved, earthen, trapezoidal channel with a top width of 95-ft, a
bottom width of 20-ft, an approximate side slope ratio of 3H:1V, and a depth of approximately
12-ft. The channel upstream of North Avenue P is approximately 5-ft deep, compared to the 12-
ft deep ditch downstream or south of Avenue P.
To model a proposed solution to the structural flooding in the Battleground Estates area, the upstream portion of the composite structure was replaced with 2 – 8’x10’ RCBs and a portion of
F101-00-00 was assumed graded upstream at a reasonable slope to meet existing ground. The
earthwork is simply to accommodate the new structures.
Hydrology
A discharge-drainage area relationship was developed for the watershed using hydrologic data
collected from TSARP studied streams in the area (F216-00-00 and F220-00-00). Discharge-
drainage area data for evaluating F101-00-00 were extrapolated using regression equations
produced from the TSARP data relationship.
Model Basis
A previous study, (City Wide Drainage Study, Klotz Associates, Inc., January 2009) (CWDS)
and a construction drawing for the structure on F101-00-00 at Avenue P (Harris County Flood
Control District, December 2009) were used as reference for this report. See Appendix A for construction drawing.
Existing-Conditions Model
The existing conditions model was built using data from the CWDS, HCFCD Channel Conveyance Improvement construction plans, ESRI’s geographic information systems (GIS), program ArcMap, U.S. Army Corps of Engineers (USACE) HEC-RAS and its GIS extension
HEC-GeoRAS, 2010 Aerial photographs (Houston-Galveston Area Council, HGAC), 2008
LiDAR (Harris County Flood Control, HCFCD) which include improvements to the channel
south of Avenue P along F101-00-00, and field collected data. The model indicated that flows along segments of F101-00-00 and a small portion of F101-08-00
rise to a level that exceeds the capacity of sections of the drainage channel during the 10-, 50-,
and 100-year rainfall events. These capacity limitations producing out of bank occurrences were
more frequent upstream of the improved earthen channel north of Avenue P. F101-00-00 upstream and downstream of Avenue P are shown in Photo 4 and Photo 5.
The segment of F101-00-00 that flows into the composite structure is an improved, earthen,
trapezoidal channel with a top width of 20-ft, a bottom width of 8-ft, an approximate side slope
ratio of 3H:1V, and a depth of approximately 5-ft. The capacity of upstream portion of the composite structure is less (approximately 50%) than that of the capacity of the downstream
portion of the structure (including the improved open channel, Photo 5). The portion of F101-00-
00 (open channel) that flows into the composite structure (Photo 3) conveys flows at a greater
rate than the upstream portion can convey to the downstream portion and improved open channel downstream. The 2 – 42” pipes of the upstream portion of this structure have a total conveyance area of approximately 20-ft2 while the 2 – 8’x10’ boxes of the lower portion have a conveyance
area of 160-ft2. This difference in conveyance areas creates a situation that prevents flows from
entering the structure resulting in water surface elevations (WSEL) that exceed the limits of the
channel banks. The information in Table 1 and the profiles, included as figures, indicate that the larger downstream portion of the structure has sufficient capacity to accept the flows from the upper portion of the composite structure.
Proposed-Solution Model
The proposed conditions hydraulic model was developed by replacing the upstream portion of
the composite structure with structures matching the downstream portion of the composite
structure. Adjusting the flowline of F101-00-00 to meet the invert elevation of the proposed
RCBs will make full utilization of the structure’s capacity as well as protect the channel during rainfall events that produce higher amounts of runoff. This flowline adjustment and channel improvement extends approximately 215-ft upstream of the proposed RCBs.
As shown in Table 1 and the proposed solution profile shown in the figures, the proposed
conditions produced a drop in the WSEL at North Avenue P that range from 1.5-ft to 4-ft, however these lower water surface elevations extend no further than 1000-ft upstream of North Avenue P. Due to the localized nature of the lower water surface elevations, only the homes
immediately adjacent to North Avenue P would see benefits. These benefits are not noticed in
the upper segments of F101-00-00 or in F101-08-00 in the Battleground Estates area due to the
conveyance limitation of the channel.
Cost Estimate
A preliminary construction cost estimate indicates the cost of installing the additional dual
8’x10’ RCB to be approximately $85,000. These costs include removal of the 2 – 42” CMPs,
removal of the existing headwall, removal of the existing handrail and the installation of 2 –
8’x10’ RCB (to match the lower portion of this structure), an 11’ wingwall, and excavation for
the RCBs. A more detailed explanation of the cost are shown in Table 2.
Results and Conclusions:
Increasing the capacity of the drainage structure at North Avenue P results in a significant lowering of the water surface elevation in the immediate upstream channel (see Table 1). The
Table 1
Existing Proposed Diff.Existing Proposed Diff.Existing Proposed Diff.
15160.24 18.11 23.00 23.00 0.00 23.00 23.00 0.00 23.00 23.00 0.00
14534.39 19.68 21.72 21.72 0.00 21.62 21.62 0.00 21.02 21.41 0.39
13663.88 15.00 19.68 19.65 -0.03 19.64 19.61 -0.03 19.51 19.47 -0.04
12874.61 15.99 19.72 19.46 -0.26 19.62 19.40 -0.22 19.42 19.24 -0.18
12856.96 Culvert ---- - ----
12856.86 15.90 19.73 19.49 -0.24 19.63 19.39 -0.24 19.43 19.20 -0.23
12707.86 14.91 19.69 19.38 -0.31 19.59 19.23 -0.36 19.39 19.04 -0.35
12690.5 Culvert ---- - ----
12690.4 14.80 19.70 19.42 -0.28 19.60 19.29 -0.31 19.39 19.09 -0.30
12551.37 14.00 19.64 19.29 -0.35 19.55 19.18 -0.37 19.35 18.58 -0.77
12518.1 Culvert ---- - ----
12518 13.90 19.66 19.33 -0.33 19.57 19.21 -0.36 19.37 17.03 -2.34
11752.81 14.00 19.53 17.12 -2.41 19.45 16.96 -2.49 19.27 16.56 -2.71
11592.81 13.00 19.48 17.16 -2.32 19.40 16.52 -2.88 19.24 14.99 -4.25
11542.81 14.00 19.48 17.05 -2.43 19.40 16.43 -2.97 19.24 14.93 -4.31
11512.9 Culvert Ave. P --- - ----
11512.8 8.02 16.77 16.89 0.12 16.24 16.32 0.08 14.79 14.86 0.07
11393.32 Culvert Ave. P --- - ----
11393.22 7.98 16.60 16.69 0.09 16.11 16.19 0.08 14.70 14.78 0.08
11313.71 7.00 16.76 16.76 0.00 16.25 16.25 0.00 14.82 14.82 0.00
10860.51 7.00 16.71 16.71 0.00 16.20 16.20 0.00 14.77 14.77 0.00
10066.45 7.00 16.45 16.45 0.00 15.94 15.94 0.00 14.51 14.51 0.00
9266.415 7.00 16.20 16.20 0.00 15.68 15.68 0.00 14.25 14.25 0.00
8712.985 7.00 16.00 16.00 0.00 15.48 15.48 0.00 14.05 14.05 0.00
8663.006 7.00 16.01 16.01 0.00 15.48 15.48 0.00 14.04 14.04 0.00
8618.097 Bridge Sens Rd.--- - ----
8617.997 7.00 15.99 15.99 0.00 15.47 15.47 0.00 14.03 14.03 0.00
8567.992 7.00 15.95 15.95 0.00 15.43 15.43 0.00 13.99 13.99 0.00
7761.743 6.00 15.69 15.69 0.00 15.15 15.15 0.00 13.72 13.72 0.00
6967.946 6.00 15.41 15.41 0.00 14.87 14.87 0.00 13.44 13.44 0.00
6328.381 6.00 15.10 15.10 0.00 14.56 14.56 0.00 13.11 13.11 0.00
6189.11 6.00 15.06 15.06 0.00 14.51 14.51 0.00 13.06 13.06 0.00
6098.921 6.00 15.02 15.02 0.00 14.48 14.48 0.00 13.05 13.05 0.00
5669.789 Culvert Railroad --- - ----
5669.69 6.00 14.17 14.17 0.00 13.72 13.72 0.00 12.50 12.50 0.00
5619.675 6.00 14.15 14.15 0.00 13.69 13.69 0.00 12.46 12.46 0.00
4819.409 5.00 13.42 13.42 0.00 12.95 12.95 0.00 11.69 11.69 0.00
4019.383 5.00 12.72 12.72 0.00 12.23 12.23 0.00 10.94 10.94 0.00
3323.449 2.66 11.22 11.22 0.00 10.67 10.67 0.00 9.25 9.25 0.00
3276.977 2.00 10.99 10.99 0.00 10.45 10.45 0.00 9.13 9.13 0.00
2949.491 Bridge SH 146 --- - ----
2949.391 2.00 10.87 10.87 0.00 10.33 10.33 0.00 8.99 8.99 0.00
2896.793 2.00 10.69 10.69 0.00 10.13 10.13 0.00 8.79 8.79 0.00
2469.399 2.02 10.26 10.26 0.00 9.66 9.66 0.00 8.17 8.17 0.00
1756.84 1.00 10.06 10.06 0.00 9.43 9.43 0.00 7.88 7.88 0.00
1467.654 0.00 10.12 10.12 0.00 9.48 9.48 0.00 7.91 7.91 0.00
1297.519 0.00 10.19 10.19 0.00 9.56 9.56 0.00 7.98 7.98 0.00
1247.476 0.00 10.05 10.05 0.00 9.45 9.45 0.00 7.96 7.96 0.00
1160.556 Culvert Railroad --- - ----
1160.456 0.00 8.86 8.86 0.00 8.34 8.34 0.00 7.04 7.04 0.00
1118.536 0.00 8.80 8.80 0.00 8.29 8.29 0.00 7.00 7.00 0.00
100-yr (1%) Flood Event 50-yr (2%) Flood Event 10-yr (10%) Flood Event
Comparison of Computed Water Surface Elevations (CWSEL)
between Existing and Proposed Conditions in F101-00-00 at Avenue P
HEC-RAS
Station
Existing
Flowline CWSEL (ft)CWSEL (ft)CWSEL (ft)
Klotz Associates Project No.: 0127.014.000
November 2011
Phase 1 Preliminary Engineering Report
Battleground Estates Flooding Analysis
City of La Porte
Table 1
Existing Proposed Diff.Existing Proposed Diff.Existing Proposed Diff.
100-yr (1%) Flood Event 50-yr (2%) Flood Event 10-yr (10%) Flood Event
Comparison of Computed Water Surface Elevations (CWSEL)
between Existing and Proposed Conditions in F101-00-00 at Avenue P
HEC-RAS
Station
Existing
Flowline CWSEL (ft)CWSEL (ft)CWSEL (ft)
1059.904 Culvert Unnamed St.--- - ----
1059.804 0.00 7.10 7.10 0.00 6.82 6.82 0.00 6.01 6.01 0.00
1016.66 0.00 7.13 7.13 0.00 6.83 6.83 0.00 5.98 5.98 0.00
852.7695 0.00 6.74 6.74 0.00 6.45 6.45 0.00 5.64 5.64 0.00
63.6235 0.00 4.13 4.13 0.00 3.89 3.89 0.00 3.23 3.23 0.00
Bold font indicates limits of proposed improvements
Klotz Associates Project No.: 0127.014.000
November 2011
Phase 1 Preliminary Engineering Report
Battleground Estates Flooding Analysis
City of La Porte
Table 2
Item No.Description Units Unit Cost QTY Cost
1 Struct Excav (Box)CY $7.00 108 $800.00
2 Rail (Handrail)(TY C)LF $120.00 80 $9,600.00
3 Excavation (Channel)CY $3.45 225 $800.00
4 Conc Box Culv (10 FT X 8 FT)CY $415.00 60 $24,900.00
5 Wingwall (PW)(HW=11 FT)EA $20,000.00 1 $20,000.00
6 One-way Traffic Control HR $37.00 120 $4,400.00
7 Conc Pav (Joint Renif) (6")SY $27.46 100 $2,700.00
8 Riprap (stone protection)(18 IN)CY $86.12 16 $1,400.00
9 Demolition LS $9.00 60 $500.00
$65,000.00
Contingency (30%)$20,000.00
Total $85,000.00
Preliminary Construction Cost Data
Klotz Associates Project No.: 0127.014.000
November 2011
Phase 1 Preliminary Engineering Report
Battleground Estates Flooding Analysis
City of La Porte
F101-00-00
F1
0
1
-
0
8
-
0
0
La Porte
LSe
n
s
16
t
h
1
0
t
h
12
t
h
Avenue L
Avenue P
State Hwy
2
2
5
Avenue H
E
H
St
a
t
e
H
w
y
1
4
6
I
14
t
h
8t
h
Tyler
11
t
h
1s
t
4t
h
5t
h
6t
h
13
t
h
Ro
b
i
n
s
o
n
26
t
h
Houston
3r
d
Al
l
e
y
Barbours Cut
Hig
h
w
a
y
1
4
6
Madison
Viola
7t
h
Old la Port
e
D
Unnamed S
t
r
e
e
t
9t
h
Br
o
a
d
w
a
y
Al
v
y
S
t
a
t
e
H
w
y
1
4
6
S
e
r
v
i
c
e
Bois D Arc
Deaf Smith
San Jacinto
Lovinnie
Le
m
o
n
Va
l
l
e
y
V
i
e
w
Old Strand
Mi
s
s
i
o
n
Avenue D 2n
d
St
r
a
n
g
Monument
La
u
r
a
Ash
Pine
Bexar
Cavalry
Ea
s
y
Sh
i
r
l
e
y
Cannon
Elm
Fieldcrest
Lo
m
a
x
Sa
n
t
a
A
n
n
a
Alamo
Plainbrook
Flintlock
Dr
i
v
e
w
a
y
El
m
w
o
o
d
Oak
Ba
t
t
l
e
v
i
e
w
PeachSunset Ridge
Elizabeth
Mil
l
e
r
C
u
t
O
f
f
Milam
Du
a
n
e
Bowie
Parking Lot
Po
s
t
T
r
a
i
l
e
r
P
a
r
k
Ramp
Bu
c
h
a
n
a
n
St
a
t
e
H
w
y
1
4
6
N
o
r
t
h
Tr
a
v
i
s
Fairlane
Sky View
Bay View
South
P
H
Pa
r
k
i
n
g
L
o
t
La Porte
E
Ho
u
s
t
o
n
26
t
h
Fieldcrest
Avenue P
Br
o
a
d
w
a
y
Old la Port
e
Ramp
La P
o
r
t
e
State Hwy
2
2
5
State
H
w
y
1
4
6
Hi
g
h
w
a
y
1
4
6
14
t
h
Plainbrook
10
t
h
St
a
t
e
H
w
y
1
4
6
Dr
i
v
e
w
a
y
State Hwy 22
5
State Hwy 225
Al
l
e
y
Al
l
e
y
Madison
Avenue D
8t
h
Tyler
Al
l
e
y
Sunset Ridge
F101-03-00
F101-06-00
F101-01-00
F1
0
1
-
0
0
-
9
9
F216-00-00
F1
0
1
-
0
8
-
0
0
F210-00-00
F1
0
1
-
0
7
-
0
0
F2
1
2
-
0
0
-
0
0
F1
0
1
-
0
6
-
0
2
F1
0
1
-
0
6
-
0
3
³
01,000500Feet
EXHIBIT1
CITY OF LA PORTEBATTLEGROUND ESTATESPHASE 1 PELIMINARY ENGINEERING REPORT
KLOTZ PROJ. NO.: 0127.014.000
SCALE:
DATE: NOVEMBER 4, 2011
(Aerial Source: HGAC 2010)
1 " = 1,000 '
Legend
Battleground Estates
Study Stream
Streets
Avenue P
Pa
t
h
:
J
:
\
0
1
2
7
.
0
1
4
.
0
0
0
\
0
7
.
0
0
C
A
D
D
\
G
I
S
\
E
x
h
i
b
i
t
s
\
E
x
h
i
b
i
t
1
-
P
r
o
j
e
c
t
L
o
c
a
t
i
o
n
M
a
p
.
m
x
d
Project Location:Replace 2-42" CMP culvertswith 2- 8'x10' RCB
PROJECT LOCATION &AERIAL MAP
F101-00-00
F1
0
1
-
0
8
-
0
0
22
20
8
6
4
24
2
18
16
14
12
10
26 28
30
32
34
3638
44
42
40 46
48
50 52
54 5658
24
20
22
22
46
26
26
26
26
24
20
48
20
28
18
26
2628
22
26
26
30
24
18
2
4
28
22
2
224
24
24
20
16
22
24
20
28
20
22
24
22
22
18
26
24
24
18
24
24
26
2
2
26
28
La Porte
LSe
n
s
16
t
h
1
0
t
h
12
t
h
Avenue L
Avenue P
State Hw
y
2
2
5
Avenue H
E
H
St
a
t
e
H
w
y
1
4
6
I
14
t
h
8t
h
Tyler
11
t
h
1s
t
4t
h
5t
h
6t
h
13
t
h
Ro
b
i
n
s
o
n
26
t
h
Houston
3r
d
Al
l
e
y
Barbours Cut
Hig
h
w
a
y
1
4
6
Madison
Viola
7t
h
Old la Port
e
D
Unnamed S
t
r
e
e
t
9t
h
Br
o
a
d
w
a
y
Al
v
y
S
t
a
t
e
H
w
y
1
4
6
S
e
r
v
i
c
e
Bois D Arc
Deaf Smith
San Jacinto
Lovinnie
Le
m
o
n
Va
l
l
e
y
V
i
e
w
Old Strand
Mi
s
s
i
o
n
Avenue D 2n
d
St
r
a
n
g
Monument
La
u
r
a
Ash
Pine
Bexar
Cavalry
Ea
s
y
Sh
i
r
l
e
y
Cannon
Elm
Fieldcrest
Lo
m
a
x
Sa
n
t
a
A
n
n
a
Alamo
Plainbrook
Flintlock
Dr
i
v
e
w
a
y
El
m
w
o
o
d
Oak
Ba
t
t
l
e
v
i
e
w
PeachSunset Ridge
Elizabeth
Mil
l
e
r
C
u
t
O
f
f
Milam
Du
a
n
e
Bowie
Pa
r
k
i
n
g
L
o
t
Po
s
t
T
r
a
i
l
e
r
P
a
r
k
Ramp
Bu
c
h
a
n
a
n
Tr
a
v
i
s
Fairlane
Sky View
Bay View
South
P
Old la Port
e
Tyler
10
t
h
Avenue D
Al
l
e
y
Sunset Ridge
State Hwy 225
Fieldcrest
Ho
u
s
t
o
n
Al
l
e
y
Avenue P
H
La P
o
r
t
e
Dr
i
v
e
w
a
y
St
a
t
e
H
w
y
1
4
6
Ramp Hi
g
h
w
a
y
1
4
6
Al
l
e
y
Plainbrook
La Porte
State Hwy
2
2
5
14
t
h
8t
h
E
Br
o
a
d
w
a
y
State
H
w
y
1
4
6
26
t
h
F101-03-00
F101-06-00
F101-01-00
F1
0
1
-
0
0
-
9
9
F216-00-00
F1
0
1
-
0
8
-
0
0
F210-00-00
F1
0
1
-
0
7
-
0
0
F2
1
2
-
0
0
-
0
0
F1
0
1
-
0
6
-
0
2
F1
0
1
-
0
6
-
0
3
³
01,000500Feet
EXHIBIT2
CITY OF LA PORTEBATTLEGROUND ESTATESPHASE 1 PELIMINARY ENGINEERING REPORT
TOPOGRAPHIC MAP
KLOTZ PROJ. NO.: 0127.014.000
SCALE:
DATE: NOVEMBER 4, 2011
(Aerial Source: HGAC 2010)
1 " = 1,000 '
Legend
Contour
Battleground Estates
Study Stream
Streets
Avenue P
Pa
t
h
:
J
:
\
0
1
2
7
.
0
1
4
.
0
0
0
\
0
7
.
0
0
C
A
D
D
\
G
I
S
\
E
x
h
i
b
i
t
s
\
E
x
h
i
b
i
t
2
-
T
o
p
o
g
r
a
p
h
i
c
M
a
p
.
m
x
d
&;
DA22183-ac&;
DA0597-ac
&;
DA1595-ac&;
DA1194-ac
&;
DA1392-ac
&;
DA0191-ac
&;
DA0881-ac
&;
DA1067-ac &;
DA1867-ac
&;
DA1963-ac
&;
DA1461-ac
&;
DA0961-ac
&;
DA0358-ac
&;
DA0758-ac
&;
DA0666-ac &;
DA2049-ac
&;
DA0438-ac
&;
DA1626-ac
&;
DA1220-ac
&;
DA0219-ac
&;
DA2118-ac
&;
DA1712-ac
G
B
E
16
t
h
La Porte
Spencer 8t
h
1s
t
4t
h
6t
h
5t
h
3r
d
7t
h
Se
n
s
A
Avenue L
2n
d
Avenue P
10
t
h
State Hwy
2
2
5
L
F
11
t
h
Park
Avenue H
St
a
t
e
H
w
y
1
4
6
12
t
h
Un
d
e
r
w
o
o
d
Ut
a
h
9t
h
Io
w
a
Main
C L
o
b
i
t
Polk
15
t
h
Barbours Cut
K
a
n
s
a
s
H
I
14
t
h
Vi
r
g
i
n
i
a
Id
a
h
o
Catlett
Tyler
Birch
C
a
r
r
o
l
l
H
o
l
m
e
s
Carlow
N
u
g
e
n
t
Adams
Rustic Gate
Ca
n
a
d
a
Hw
y
1
4
6
Dr
i
f
t
w
o
o
d
Fa
r
r
i
n
g
t
o
n
Ro
b
i
n
s
o
n
St
a
t
e
H
w
y
1
4
6
D
26
t
h
Mesquite
Houston
Br
o
a
d
w
a
y
R
o
s
e
b
e
r
r
y
Bay
s
h
o
r
e
13th
W
i
l
l
m
o
n
t
Fl
e
e
t
w
o
o
d
23
r
d
Ba
y
e
r
Dogwood
Hig
h
w
a
y
1
4
6
Madison
Lo
m
a
x
S
c
h
o
o
l
O
h
i
o
Rustic Rock
Andr
i
c
k
s
Ce
d
a
r
m
o
n
t
Viola
Crestway
Old la Port
e
Collingswood
Dover Hill
D
Unnamed
S
t
r
e
e
t
Wren
Creekview
Sta
t
e
H
w
y
1
3
4
Glenvalley
Parkcrest
My
r
t
l
e
C
r
e
e
k
Al
v
y
Ston
e
m
o
n
t
Bois D Arc
Winding Trail
Te
x
a
s
Robin
Antrim
Glenpark
17
t
h
S
a
n
J
a
c
i
n
t
o
18
t
h
Spruce
Lovinnie
Le
m
o
n
Belfast
Be
r
n
a
r
d
Mulberry
Montgomery
Moore
Old Strand
M
o
n
t
a
n
a
Avenue D
Hills
d
a
l
e
Ma
r
y
Ramp
Me
a
d
o
w
L
a
r
k
Quiet Hill
Cardinal
La
u
r
a
Ash
Cl
a
r
k
s
v
i
l
l
e
Lee
Ol
d
U
n
d
e
r
w
o
o
d
Br
o
w
n
i
n
g
Ta
n
y
a
V
a
l
l
e
y
B
r
o
o
k
Old Orchard
Pine
Alley
Pinewood
Ba
y
o
u
G
l
e
n
Bexar
Cavalry
Ca
m
m
y
Ea
s
y
Ar
i
z
o
n
a
Cany
o
n
S
p
r
i
n
g
s
Sh
i
r
l
e
y
Fieldcrest
Eag
l
e
N
e
s
t
24
t
h
25
t
h
Ga
u
c
h
o
Je
s
s
i
c
a
Willo
w
C
r
e
e
k
Plainbrook
Sioux
Cap
l
a
n
Dr
i
v
e
w
a
y
Park
w
a
y
Wa
y
s
i
d
e
Lo
c
L
o
m
a
Cr
a
n
d
a
l
l
Co
u
p
l
a
n
d
Blac
k
w
e
l
l
O
t
t
e
r
C
r
e
e
k
De
s
e
r
t
R
u
n
Springwood
Br
o
w
n
e
l
l
Mil
l
e
r
C
u
t
O
f
f
Oak
G
r
o
v
e
Du
a
n
e
Pecan
Brookside
B
A
r
e
a
McCarty
R
i
v
e
r
C
r
e
e
k
Bu
c
h
a
n
a
n
St
a
t
e
H
w
y
1
4
6
N
o
r
t
h
Barton
P
Fairlane
Rosc
o
e
Ramp
13
t
h
D
H
La Porte
Al
l
e
y
14
t
h
14
t
h
Al
l
e
y
13
t
h
F
8t
h
H
D
14
t
h
I
Sp
e
n
c
e
r
Al
l
e
yCarlow
D
Alley
11
t
h
Rustic Gate
Alley D
Tyler
17
t
h
Ol
d
U
n
d
e
r
w
o
o
d
12
t
h
Un
n
a
m
e
d
S
t
r
e
e
t
Ramp
State Hwy
2
2
5
F
O
h
i
o
La Porte
E
13
t
h
State Hwy 225
B
State Hwy
2
2
5
State
H
w
y
1
4
6
G
H
Driveway
C
12
t
h
D
La Porte
Lo
m
a
x
S
c
h
o
o
l
26
t
h
Hi
g
h
w
a
y
1
4
6
Catlett E
C
I
Bl
a
c
k
w
e
l
l
La Po
r
t
e
Collingswoo
d
La P
o
r
t
e
Se
n
s
I
Polk
Alley
C
F
E
A
B
E
I
9t
h
D
H
Avenue P
Driveway
³
02,0001,000
Feet
EXHIBIT3
DRAINAGE AREA MAP
CITY OF LA PORTEBATTLEGROUND ESTATESPHASE 1 PELIMINARY ENGINEERING REPORT
KLOTZ PROJ. NO.: 0127.014.000
SCALE:
DATE: NOVEMBER 4, 2011
(Aerial Source: Landiscor 2010)
1 " = 2,000 '
Legend
Battleground Estates
Streams
Drainage Area
Pa
t
h
:
J
:
\
0
1
2
7
.
0
1
4
.
0
0
0
\
0
7
.
0
0
C
A
D
D
\
G
I
S
\
E
x
h
i
b
i
t
s
\
E
x
h
i
b
i
t
3
-
D
r
a
i
n
a
g
e
A
r
e
a
M
a
p
.
m
x
d
F101-00-00
F1
0
1
-
0
8
-
0
0
12
6
9
0
.
4
92
6
6
.
4
1
5
11542.80611592.80711752.808
29
4
9
.
3
9
1
4
28
9
6
.
7
9
3
5
56
6
9
.
6
8
9
9
32
7
6
.
9
7
6
6
33
2
3
.
4
4
9
5
56
1
9
.
6
7
5
3
696
7
.
9
4
6
3
13
6
6
3
.
8
7
8
87
1
2
.
9
8
5
4
1247.4758
86
6
3
.
0
0
5
9
48
1
9
.
4
0
9
2
60
9
8
.
9
2
1
4
40
1
9
.
3
8
3
1
12
8
7
4
.
6
0
6
12
5
1
8
.
0
0
1
1756.8397
7761
.
7
4
2
7
24
6
9
.
3
9
9
2
63.
6
2
3
4
9
7
1297.5189
85
6
7
.
9
9
2
2
15160.244
14
5
3
4
.
3
8
6
10
0
6
6
.
4
4
6
61
8
9
.
1
1
0
4
1016.6597
63
2
8
.
3
8
1
3
11313.7
1
5
10860.5
0
9
La Porte
L
Se
n
s
16
t
h
12
t
h
1
0
t
h
Avenue L
Avenue P
State Hwy
2
2
5
Avenue H
E
H
I
14
t
h
St
a
t
e
H
w
y
1
4
6
8t
h
11
t
h
13
t
h
Ro
b
i
n
s
o
n
1s
t
26
t
h
4t
h
5t
h
Houston
6t
h
Barbours Cut
Hig
h
w
a
y
1
4
6
Madison
Viola
Old la Port
e
Al
l
e
y
Unnamed
S
t
r
e
e
t
9t
h
Al
v
y
St
a
t
e
H
w
y
1
4
6
S
e
r
v
i
c
e
Bois D Arc
Deaf Smith
3r
d
San Jacinto
Lovinnie
Le
m
o
n
Br
o
a
d
w
a
y
Va
l
l
e
y
V
i
e
w
Old Strand
Mi
s
s
i
o
n
St
r
a
n
g
Monument
La
u
r
a
Ash
7t
h
Pine
Bexar
Cavalry
Ea
s
y
Sh
i
r
l
e
y
Cannon
Elm
Fieldcrest
Lo
m
a
x
Sa
n
t
a
A
n
n
a
Alamo
Plainbrook
Dr
i
v
e
w
a
y
El
m
w
o
o
d
Oak
Sunset RidgeElizabeth
Mi
l
l
e
r
C
u
t
O
f
f
Milam
Du
a
n
e
Ba
t
t
l
e
v
i
e
w
Bowie
Parking Lot
Po
s
t
T
r
a
i
l
e
r
P
a
r
k
2n
d
Ramp
Bu
c
h
a
n
a
n
St
a
t
e
H
w
y
1
4
6
N
o
r
t
h
Tr
a
v
i
s
Fairlane
Sky View
Bay View
P
Ramp
Pa
r
k
i
n
g
L
o
t
Madison
H
E
Avenue P
State Hwy 225
Madison
La Porte
Plainbrook
14
t
h
La P
o
r
t
e
26
t
h
8t
h
Hi
g
h
w
a
y
1
4
6
Br
o
a
d
w
a
y
State
H
w
y
1
4
6
State Hwy 225
Old la Port
e
St
a
t
e
H
w
y
1
4
6
Ho
u
s
t
o
n
State Hwy
2
2
5
Dr
i
v
e
w
a
y
³
EXHIBIT4
HEC-RASCROSS-SECTION LOCATION MAP
CITY OF LA PORTEBATTLEGROUND ESTATESPHASE 1 PELIMINARY ENGINEERING REPORT
KLOTZ PROJ. NO.: 0127.014.000
SCALE:
DATE: NOVEMBER 4, 2011
(Aerial Source: Landiscor 2010)
1 " = 1,000 '
Legend
Battleground Estates
Study Stream
Cross-Section
Pa
t
h
:
J
:
\
0
1
2
7
.
0
1
4
.
0
0
0
\
0
7
.
0
0
C
A
D
D
\
G
I
S
\
E
x
h
i
b
i
t
s
\
E
x
h
i
b
i
t
4
-
C
r
o
s
s
-
S
e
c
t
i
o
n
L
o
c
a
t
i
o
n
M
a
p
.
m
x
d
01,000500Feet
APPENDIX A
PHOTOS
Photo 1 Sediment on the outfall apron of 8'x10' culverts atF101-00-00 and Avenue P
Photo 2 Sediment in the bottom of the 8'x10' RCBs serving F101-00-00 at Avenue P
Photo 3 Upstream of structure at Avenue P (2 - 42" CMPs)
Photo 4 Channel upstream of composite structure serving F101-00-00 at Avenue P
Photo 5 Channel downstream of composite structure serving F101-00-00 at Avenue P
FIGURES
11
0
0
0
12
0
0
0
13
0
0
0
14
0
0
0
1500016000
05101520
F1
0
1
-
0
0
-
0
0
_
2
P
l
a
n
:
E
x
i
s
t
2
1
1
/
1
5
/
2
0
1
1
E
x
i
s
t
i
n
g
C
o
n
d
i
t
i
o
n
s
Ma
i
n
C
h
a
n
n
e
l
D
i
s
t
a
n
c
e
(
f
t
)
Elevation (ft)
Legend WS 100-yr (1%)WS 50-yr (2%)WS 10-yr (10%)Ground LOB ROB
F1
0
1
-
0
0
-
0
0
M
a
i
n
C
h
a
n
n
e
l
12
0
0
0
13
0
0
0
14
0
0
0
1500016000
05101520
F1
0
1
-
0
0
-
0
0
_
P
r
o
p
2
P
l
a
n
:
P
r
o
p
o
s
e
d
2
1
1
/
1
5
/
2
0
1
1
P
r
o
p
o
s
e
d
C
o
n
d
i
t
i
o
n
s
Ma
i
n
C
h
a
n
n
e
l
D
i
s
t
a
n
c
e
(
f
t
)
Elevation (ft)
Legend WS 100-yr (1%)WS 50-yr (2%)WS 10-yr (10%)Ground LOB ROB
F1
0
1
-
0
0
-
0
0
M
a
i
n
C
h
a
n
n
e
l