ORDINANCE NO. 9l5-U
AN ORDINANCE GRANTING A PERMIT UNDER SECTION l8-A-3 OF ORDINANCE
NO. 915, "PIPELINE TRANSPORTATION," BEING CHAPTER l8-A OF THE
CODE OF ORDINANCES OF THE CITY OF LA PORTE, TEXAS: AND APPROVING
THE APPLICATION OF UNION CARBIDE CORPORATION DATED JANUARY 13,
1984, TO CONSTRUCT A SIXTEEN INCH (16") OXYGEN PIPELINE AND TO
CONSTRUCT A SIXTEEN INCH (16") NITROGEN PIPELINE: AND PROVIDING
AN EFFECTIVE DATE HEREOF.
..,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LA PORTE:
Section 1. The City Council of the City of La Porte has
received an application dated January 13, 1984, from Union
Carbide Corporation, requsting permit under Section l8-A-3
of Ordinance No_ 915, being Chapter l8-A of the Code of
Ordinances of the City of La Porte, to construct a sixteen
inch (16") oxygen pipeline, and to construct a sixteen inch
(16") nitogen pipeline, crossing the City of La Porte, all as
shown on said application_ The application of Union Carbide
Corporation has been reviewed by the City's Director of Public
Works, who has found that said application meets all require-
ments of said Ordinance No. 915, and has recommended its
approval.
Section 2. The City Council of the City of La Porte
hereby approves the application of Union Carbide Corporation,
dated January 13, 1984, and this Ordinance shall constitute
a permit to Union Carbide Corporation to lay and construct
said pipelines within the City of La Porte, all in conformance
with the requirements of said Ordinance No. 915.
Section 3. This Ordinance shall be in full force and
effect from and after its passage and approval.
e
e
-e.
e',
.
,
Ordinance No. 915-U, Page 2.
PASSED AND APPROVED this the 14th day of March, 1984.
CITY OF LA PORTE
By
ATTEST:
~~
C1ty Secretary
APPROVED:
City Attorney
e
e
.
........Lj,.. e
.......
e. _. ..........
. . . . . . -
. . . . . .
:.:-:.:.:.:.:~ _ UNION CARBIDE
Union esrbiA.rporation
Linde DiviSi"-
P,O. Box 44
Tonswsnds, New York 14150
Telex 91.311
January 13, 1984
Director of Public Works
City of laPorte, TX
P.O. Box 1115
laPorte, TX 77571
Re: Request for Passage of Ordinance for
Two 16-inch Pipelines Crossing
0, H, and P Streets
UCC Project 2089 (line list H-10)
This is to request passage of an ordinance by the City of laPorte granting
permission to Union Carbide Corporation located at Old Ridgebury Road,
Danbury, CT 06817 and incorporated in the State of New York, to cross, lay,
construct, operate, maintain and inspect two adjacent 16-inch pipelines under
the City of laPorte roads "0" Street, "H" Street and "P" Street at locations
shown on the enclosed drawings A-2204978, A-2204979 and A-2204983. A drawing
which displays the entire route through the City of laPorte, A-2204975, is
also enclosed.
The pipelines, to be constructed in 1984, will convey oxygen and nitrogen gas.
The enclosed functional specifications, dated 1/21/83, elaborate on specific
details relative to the installation.
Please address all correspondence pertinent to this request for passage of
this ordinance to my attention at the above address.
Very truly yours,
~~
R. A. Pownall
Senior Engineer
/jgc
enc.
.~
.w.~~.
"
e
e
.
oon I~t:
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
jo/34071
.
Cas prOduC.Engineering Dept.
TOD.wand., New York
September 20. 1982
.ev1l1on
Prepared:
Approved:
UCC - LINDE PROJECT C930-2089
FUNCTIONAL SPECIFICATION FO~ OXYGEN AND NITROGE~ PIPELINES
LAPORTE. TEXAS CITY. TEXAS
General Description
Legal Address of Licensee
Applicable Codes of Design and Construction
Carrier Pipe Specification and Design
Carrier Pipe Coating
Casing Pipe Specifications
Fittings 8n~ Flange Specifications
Depth of Line
Construction Methods
Cathodic Protection
Pai nt ing
Isolation Valves
Pipeline Markers
'~I.O
'.
.
e
-e
Gener.] DescriP~:
.
The .cope of this project viII be inst.ll.tion of two (2) p.r.llel (in
the .ame trench) pipelines fDr non-flammable a.seous nitrogen .erviee .t 465
p.ia initial oper.ting pre..ure, ~on-fl~ble a.seous oxygen .ervice at 350
p.ia initial operating pre..ure. All lines viII be hydrost.tic.lly tested .nd
r.ted for 720 psia maximum .llow.ble Dper.ting pressure. each briefly
de.cribed below.
1.1 One (l) 16" O.D. oxyaen pipeline .nd one Cl) 16" O.D. nitrogen
pipeline, e.ch approximately 157.700 linear feet will originate at a
tie-in point approximately 6500 feet ~est of V.C.C. Linde LaPorte pl.nt
property and approximatel, 800 feet north of Hvy. 225 in the Exxon
'aytovn-B.yport pipeline corridor, .outh within Exxon and Priendsvood
corridors to Red Bluff Point area. .cross Galveston Bay, and then louth
to terminate at V.C.C. S & I plant in Texas City approximately 3200'
.outh of Hvy. 348 and just east of Hvy. 146.
2.0 Leg.l Name and Address of Licensee:
~ion C.rbide Corporation
Old lidaebury load
Danbury, CT 06 817
3.0
Applicable Codes of Design and Construction:
ANSI 831.8, N2 & 02 Pipeline Design
AREA Part 5, Pipelines on Railroad R.O.W.
API 1101. - Welding and Inspection
API 5LX - Carrier Pipe Material
NACE RP-ol-69 - Ca thodic Protect ion
API 1102 - Recommended Practice for Pipeline Crossing Highways and
Railroads.
4.0
C.rrier Pipe Specification .nd Design:
4.1 Material
4.1.1 16" O.D. x .219" Wall, API-SLX, Grade X-60, ERW, Carbon
Steel Pipe
4.1.2 16" O.D. x .250" Wall. API-SLX. Crade X-60, ER~. Carbon
St ee 1 Pipe
4.1.3 16" O.D. x .281" Wall, APi-SLI, Crade X-60, ERW, Carbon
Steel Pipe
4.2
ANSI B31.8 Design Conditions
Clan Local ion 3. Type "c" Const fUct ion
.'
~
-
_.
_.
16" X-60
281 W.T.
13,238
. 9,964
20,498
30,747
60,000
22%
11%
34%
51%
e
HOOP STRE55. rSI
-
fi" X -60 (," X-60
.11Q W.T. 1 '10 W. T .
16,986 14,880
12 ,7 85 1.1,200
1.",301 2 J ,040
39,452 )4,560
60.000
60,000
28% 25%
21% 19%
44% 38%
66% ')8%
.
re and Stresses
Int: erne 1
Pr..u.PSTG
Initial Operating
Pressure (l_0.P.)
"2 465
02 350
MaximuM Allow (MAOP) 720
Operating pre.s.
Test Pressure (T.P.) 1,080
Spec.Min Yield S~rength
( SMYS )
16" X .219 W.T. 1,64)
16" X _250 W.T. 1 ,875
16" X .281 W.T. 2,107
Ra t io 8 1.0.P. "2
S.M.Y.S 02
H.A.O.P
S.M.Y.S
T.P.
S.H.Y.S
.. , ,._.4,"
e
e
e
..
5.0
.
-)-
.
Carrier Pipe Coating:
5.1 Line Pipe: NAPCA Specification Delisnation 12-78 Fu.ion bond or
approved equal.
5.2 Field Jointl: Polyken Pri~r ~o. 927 and polyethylene tape no.
930 by Kendall Co. or equal.
5.3 Line Pipe Bay' Bayou: Concrete over dielectric coated pipe for
negltive buoyancy and ~chlnicll .trengtp.
6.0 Clsing Pipe Specifications:
20" O.D. x .344 wall for R.I. and highway, carbon .teel pipe, specified
minimum yield .trength · 35,000 psi.
7.0 Fitting .nd Flange Specification:
7.1 Pittings:
8.0
16" O.D. standard wall (.375), conforming to HSS Standard Practice
SP-75, with physical properties to satch pipe having 60,000 psi SHYS,
c.rbor. .teel.
7.2 FlaDRes
ANSI - 300 lb., carbon steel, ASTH A-181, Gr. 1.
Depth of Line:
8.1 In specifying depth of line, the recommendations of ARIA and
A~SI B31.8 have been carefully considered along with reasonable
.afety and installation practices.
8.2 The mir.imu~ depth of cover for the carrier pipe without benefit
of casing where highway loading is required will be 4'-0".
8.3 Cased railroad track crossing will have. 'Ulinimum of 5'-6" cover.
8.4 CIsed rOld crossings shall bave I minimum of 4'-0" cover.
8.5 M.inimum depth of cover for water crossing will be 5'0".
9.0 Con.truction Methods:
9.1
-
Pipeline .hall be welded construction per API 1104 with 100%
z-r.y of all butt welded joints.
~ C'linas .hall be instilled under III rlilroad tricks Ind aajor
road crossings where uDcased pipe is not permitted. Casings
.hall be installed by boriaa or jacking. It is the owner's
de. ire to ainimite cI.ings Ind therefore heavy wall pipe will be
u.ed in lieu of cIsiaa when permitted. In cases where open
cutting i. performed, traffic will be saintained on the roadway.
" ;..,..,,;..
........... ,-- .
e.
e
e
.
-4-
.
9.3
-
All di.turbed .urfaces .hall be re.tored to their original
condition.
9.4 The line. .hall be pre.sure tested as indicated in .ection 4.3
of thi. .pecification.
9.S
When virgin .oil conditions pennit. it .hall be u.ed as
backfill, .ufficiently compacted and rounded to give 100%
re.toration. When virgin .oil is not free of rocks and debris.
the line Ihall be in.talled in a 6" all around IInd .hading.
9.6 The contractor .hall saintain .afe and reasonable railroad and
-
vehicular traffic conditions throughout the route during the
construction period.
~ Adequate and uninterrupted drainage of railroad and vehicular
right-of-ways .hall be ..intained. If. in the course of
construction. it becomes necessary to block a drainage facility.
temporary drainage facilities shall be installed to maintain
adequate drainage. Permanent facilities shall be restored at
the completion of construction. All action taken shall be
approved by the right-of-way owner involved.
9.8 The Owner's contractor shall be responsible for maintaining the
integrity of all existing facilities. for adhering to all A.G.C.
safety standards and Dept. of Labor O.S.E.A. standards
10.0
Cathodic Protection:
10.1 The underground portioD of the line will be protected against
corrosion by a cathodic protection system designed in accordance
with the HACE Standard RP-01-69 (latest Rev.) "Recommended
Practices for Control of External Corrosion on Underground or
Submerged Pi ping SysteJllS".
10.2 Test stations will be installed at each casing. foreign line
crossing (when required) and .ini~ 1000 ft. intervals along
the pipeline. Insulating flange sets will be installed at all
locations where the pipeline enters and leaves the ground.
10.3
Following construction of the pipeline. a post
cathodic protection survey will be conducted.
and annual maintenance and cathodic protection
vi 11 be Ie t up.
installation
A pipeline map
survey progralll
Painting:
All .boveground .ections of the pipeline, casing vents. c.thodic
protection test .t.tionl. and pipeline aarkers viII be painted.
11.0
~l.. .. ,~..;". .
. :,,"
e
e
e
.
-5-
.
12 .0
I.olation Valves:
There will be aanuII i.olation valve. located at the orlgln of the
pipeline .upply and at each cu.tomer use point. The compTe.sor. feeding the
pipeline .upply .y.tem are equipped with automatic trip/i.olation controls and
valves.
13.0 Pipeline Marker.:
Line .arkers will be installed at all .ajor direction changes, and all
casing vent.. at nominal 1000 ft. intervals on .traight runs Df pipe, and on
cathodic telt .tatioDs to fully identify tbe routing and location of the
in.talled line. Pipeline .arkers viII .pecify the following:
Union Carbide Corp. - Linde Division
Service of Pipeline
Phone number for Linde contact in emergency