Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
APPROVED SITE PLAN_Popeye's on Spencer
SITE DATA TABLE ADDRESS 8506 SPENCER HWY, LA PORTE, TX - 77571 LEGAL DESCRIPTION 1.185 Acre tract of land being out of Reserve "E", in Block Four (4) of BROOKGLEN, SECTION TWO (2) REPLAT, a subdivision in Harris County, Texcas, according to map or plat thereof recorded in Volume 167, Page 109 of map records of Harris County. OWNER P-TEX CORPORATION OWNER ADDRESS 32 Windermere Ct, Houston, TX - 77063 OWNER CONTACT 979 412 0430 DEVELOPER INFO ALJONES,J & A CONSTRUCTION, P.O.BOC 126, HEMPSTEAD, TX - 77445 NAICS CODE 722513 - RESTAURANTS AND OTHER EATING PLACES ZONING GC, GENERAL COMMERCIAL PROTECT DESCRIPTION PROPOSED POPEYE'S RESTAURANT (3,052 Sq-Ft) with Asociated parking & Paving. The site gains access from Spencer highway & Fern Rock Dr. 22.69 22.19 A CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT AT THE PROPERTY LINE IN THE DRIVEWAY. DUMPSTER SHALL BE ENCLOSED IN A 12' HIGH MASONRY WALL 8 FT UTILITY ESMT ALONG WTIH 5'x20' AERIAL ESMT (Vol 167, PG 109 H.C.M.R) 10 FT GAS Et WATERLINE EASMENT 10 FT BUILDING SET BACK (Vol 167, Pg 109- H.C.M.R) _70' Gas & W.L.E M© -'■8.0 1 �232 Sq-F ■ Lr1 ■ Ct' (V Y L5. O■ r O y1 z ■ 5' x 20' AERIAL ESMT �S7 B. Utility Easeme FLOOD STATEMENT W o Proposed 30 LF Conc Driveway HC PERMIT # _ C:)- oposed I I I I 9.00 1 10 2.75 I II PP ZQ � GUTTER= 21.68 22.72 22.22 SPENCER HIGHWAY (100' R.O.W.) b TP 22.75 1 I I 1 1 138 ,�, I 1 1 b 9.00 p / P-2 .75 20'rRONT ETBAC O I �J ITC-2 .25 1 g II00 I 110 I L I I I I I I 1 L I I ry L P- \ 7.50�- 3 a _ \ ,A ~ Ln N I I I I of I I I 00 FUTURE OFFICE SPACE NAICS - 8139 3,000.00 SO -FT; 8502 Spencer Hwy, La Porte, TX " The development/constrution of this retail center shall require submittal of separate site plan for all applicable code requirements and construction permits. p 20' REAR SETBACK O C --74 � ---- -= BEGIN a 1 Proposed 340 LF 8' High LITECAST Concrete Rock -Faced Fence - 12" inside the Property Line This tract is in Flood Zone X-Shaded and partially within the 100-year Flood Plain accordingt of eh FEMA Map # 48201 C0940L Dated June 18, 2007 LEGEND HARDWOOD BLEND - LIVE OAK / WATER OAK (2-1/2" CALIPER, 12'-14' HT. X T-8' FULL SPREAD) TOTAL NO OF STREET TREES # 17 "( EVERGREED SHRUBS/HEDGE - COMBINATION OF DWARF GARDENIA, WAXLEAF LIGUSTRUM & #• INDIAN HAWTHORNE (5 GALLON) 36" APART TOTAL NO OF SHRUBS # 23 SHADE TREE - LIVE OAK / WATER OAK (2-1/2" CALIPER, 12'-14' HT. X T-8' FULL SPREAD) TOTAL NO OF STREET TREES # 125 2 ❑ BUFFER SHRUB- CREPE MYRTLE (2-1/2" CALIPER, 6'-8' HT. X 4'-5' FULL SPREAD) EVERY 5' PLANTED IN A DIAMOND PATTERN TOTAL NO OF STREET TREES # 64 PARKING LOT TREES - LIVE OAK / WATER OAK (2-1/2" CALIPER, 12'-14' HT. X T-8' FULL SPREAD) TOTAL NO OF STREET TREES # 5 UTILITY NOTE: GENERAL CONTRACTOR IS RESPONSIBLE TO MAKE THE 81NCH SEWER TAP TO THE CITY SEWER LINE n Areas of 0.2% annual nce of flood ie 'X - Shaded' Existing Power pole Proposed Conduit 1•or Electrical Service o Proposed 35 LF Conc Driveway 'o HC PERMIT # Pole (Typ.) AS \ N 00 1 T 22.75 4 1 OI I ( 11 5 6 TC 23.25 I 1 I 01 175 0 �5 00 9.0 ._I _1_ _ �_ I 540 1 1 �1 1. TP-22.75 11.00 1 Z / TC-23.25 + 17�0 Ei EXISTING SANITARY LI E _ S 87° 01 ' 06"W 341.7 20.00 7 - --_- 2 t ��S�CT ONVAG - 'eoQ e, e'h �Qev�c�r P��Cyj: �CjO% $Q�cer i'i�vy >LIFCAL = kec, sPro e £ Posed 4' x4' for Pole 1112 ., PARKING TABLE Proposed Restaurant 3,052 Sq-Ft 1 PER 100 Sq-Ft 31 Spaces Future Retail Center 3,000 Sq-Ft 4 + 3/300 Sq-Ft 14 Spaces No. OF PARKING SPACES REQUIRED 45 Spaces No. OF PARKING SPACES PROVIDED 47 Spaces No OF HANDICAP SPACES REQUIRED 2 �No OF HANDICAP SPACES PROVIDED 2 SPENCER HIGHWAY (too' R.O.W.) UIIIIIIIIII11111111 ■ ■ PHASE 1 II IIIIIII19) 171 INSET FOR PHASED CONSTRUCTION NOT TO SCALE pOpeYeS UIII1110 o z 0 5 a W 6 A C) z vi coo cn o-"a-@) c 1 rn x Q� o o wd v LEGEND u114 ��° fE»o.... t ❑1 Proposed Sanitary Sewer Cleanout -�"* y ; vIADHAVI TALLURI 0113329 S 030 04' 22" E 1 Proposed 6" SCH-40 PVC Sanitary Line @ 1.0% �tiii "AL 24.23' Areas of 1% annual Proposed 4" SCH-40 PVC Grease Line @ 2.0% DATE: 08-13-2015 _ chance of flood - Zone 'AE' Proposed 138 LF 6" SCH-40 PVC Sanitary SEAL cl EXISTING WATER LINE Sewer @ 1.0% 7 ❑5 Proposed 1500 Gal Grease Trap O� ~ i- 7 Z .� N Lt1 M� Proposed Sample Well ..Z Q oExisting Fire ❑ a � O Proposed Hydrant ' 7 Proposed Saddle Type Connection to Existing 8 � Ight Pole cry -) Sanitary Sewer Line Z 10 PC) ■ �8 Proposed 2" Domestic Water line TapCL Q (� ^ Q ~ +■ �7 0 9 Proposed 2" Water Meter V 000 N Ln 1 I _-0 W O iIA M 3 10 Proposed 90 LF 2" SCH-40 PVC Water line Z I0 Ln ou a o n i o I � o 11 Proposed 1" Irrigation Tap Q. W lc_V O a` v° N jU. TP-2 .75 - _{oR�o 12 Proposed 1" Irrigation Meter O - Cd /j_20.P N _ LtJ 13 Prop. 1" SCH-40 PVC Irrigation Line -Stubbed N 1 ■- w = Pole (ryP-) TC-23.25 Areas of 1% annual ` chance of flood - Zone 'AE' SITE PLAN ACCURACY CERTIFICATE ::E CL W m_ / 1, Madhavi Talluri am registered under the laws of the State In Z of Texas to practice the profession of Engineering and hereby certify LLJ O W that the above plat or site plan is true and correct; and that all I - bearings, distances, angles, curve, radiuses and central angles are - 0 1 accurately shown on the plat. N 0) LO CO END: �' Proposed 40 LF 8' H' h LITECAST C ncrete Madhavi Talluri, P.E Rock -Faced ence Registration # 15775 � Z ti 12" inside t Prop rty Line >_ O ca Z < `{ CITY APPROVING AUTHORITY CERTIFICATE � w o y LU This is to certify that the City of La Porte, Texas has approved the site plan & development of Proposed o- U- Popeye's Restaurant @ 8506 Spencer Highway, La Porte, TX SCALE: AS NOTED in conformance with the Ordinance of the y of a Porte. By: SHEET: GI Director, Planning Apartment DATE: AUG 2015 iffAss �.! & PAGE# 1 OF 3 GUTTER & DOWNSPOUT - SEE ROOF PLAN • 01 • �• = LINE OF OPEN TOP CMU ENCLOSURE mil III DRAIN THRU Ah T.O. PARAPET 1 V-4" AFF BUILDING SIGN B.O. AWNING 9-4 AFF ACCENT BAND Ak FINISHED FLOOR _ 0'-0" AFF. BLACK MASTIC SEALANT CONT. TYP. AT ENTIRE PERIMETER OF BUILDING BASE 121_1" 17'-2" M&lY LINE [. BRICK -HEBRON BRICK - �OLOR WILD ROSE C-1 EP-9 EP-6 a A( A17 BLACK MASTIC SEALANT CONT. TYP. AT ENTIRE PERIMETER OF BUILDING BASE SPECIFICATIONS SECTION 8A: ALUMINUM ENTRANCE, STOREFRONT SECTION 8D: GLAZING 12'-1 1 •s: 1. SLIDE GENERAL PROVISIONS GENERAL PROVISIONS SCOPE: FURNISH AND INSTALL THE ALUMINUM ENTRANCE AND 1. SCOPE: FURNISH AND INSTALL GLASS IN STOREFRONT AND DRIVE-THRU STOREFRONT SYSTEMS PER NATIONAL ACCOUNTS AND APPLICABLE SERVICE WINDOW. DRAWINGS. 2. QUALITY CONTROL: ALL GLASS BROKEN DURING INSTALLATION OR MATERIALS DURING CONSTRUCTION PRIOR TO FINAL DELIVERY OF THE BUILDING TO THE 1. ALUMINUM STOREFRONT AND ENTRANCE FRAMES: REFER TO OWNER SHALL BE REPLACED AT NO ADDITIONAL EXPENSE TO THE OWNER. CONSTRUCTION DRAWINGS AND SPECIFICATIONS. GLASS SHOULD BE DELIVERED WITH LABELS PROMINENTLY DISPLAYED AND 2. ALUMINUM ENTRANCE DOORS: REFER TO CONSTRUCTION DRAWINGS AND THEY SHALL BE LEFT IN PLACE UNTIL THE OWNER'S REPRESENTATIVE SPECIFICATIONS. INSPECTS IT. 3. PANIC HARDWARE:WHEN PANIC HARDWARE IS REQUIRED ON EXTERIOR MATERIALS DOORS. 1. STOREFRONT GLAZING -REFER TO CONSTRUCTION DRAWINGS AND THE PANIC DEVICE IS ON EXTERIOR ENTRY DOORS WHEN SPECIFIED IN NOTES. HARDWARE SCHEDULE. PERFORMANCE 4. DRIVE-THRU SERVICE WINDOW: THE DRIVE-THRU SERVICE WINDOW WILL BE 1. INSTALLATION: INSTALL GLAZING WITH MANUFACTURER'S INSTRUCTIONS SUPPLIED & INSTALLED BY G.C. VERIFY EXACT TYPE OF WINDOW WITH PLANS. TO PROVIDE COMPLIANCE WITH LOCAL CODE REQUIREMENTS INCLUDING BRONZE FINISH. WIND RESISTANCE, 25 PSF MIN., SNOW LOAD, 20 PSF MIN. GLAZING PANELS SHALL BE INSTALLED. WINDOW TO BE: A. BASE BID -'QUICK SERV' M.C.E. WINDOW FLUSH MOUNT. ULTRA VIOLET DEGRADATION LEVELS ARE TO MEET MANUFACTURER'S B. OPTION (VERIFY WITH OWNER) - READY ACCESS REQUIREMENTS TO VALIDATE MATERIALS REPLACEMENT WARRANTY. 5. MISCELLANEOUS FLASHINGITRIM: ALUMINUM HEAD, SILL, COLUMN AND 2. ALLOW FOR 1/4" MINIMUM HEAD DEFLECTION DUE TO LIVE LOAD. WALL TRIM. SEE EXTERIOR ELEVATIONS FOR FINISH. 3. GUARANTEES AND WARRANTIES: AT THE COMPLETION OF THE GLAZING, PERFORMANCE PROVE THE INSTALLATION WATERTIGHT BY SPRAYING ALL JOINTS WITH A 1. INSTALLATION: INSTALL IN ACCORDANCE WITH MANUFACTURER'S GARDEN HOSE WITH NOZZLE SET FOR MAXIMUM PRESSURE. PROVIDE INSTRUCTION. PLACE IN CORRECT LOCATION AS SHOWN IN THE DETAILS. ADDITIONAL CAULKING OR SEALANT, OR RESET GLASS AS NECESSARY TO LEVEL, SQUARE, AND PLUMB AT PROPER ELEVATIONS AND IN ALIGNMENT EFFECT A WATERTIGHT JOB. WITH OTHER WORK. MAINTAIN SPACE IN HEAD POCKET FOR 1/4" HEAD DEFLECTION. INSURE FRAMING PROFILES MEET INSTALLATION REQUIREMENTS OF GLAZING UNITS TO MAINTAIN WARRANTY. SEE SECTION 8-D: GLAZING. 6"0 STEEL BOLLARD TOP @ 4'-6" A.F.F. SEE DET. A/SD3, PAINT SAFETY YELLOW (EP-9) T-6 1 /4" �T-10" 3 6'-3" 4'-'�— --— — — — — — — _-- --- — / NOTE: USE QUIKSERV SS-4035E DRIVE THRU WINDOW / AT 120 M.P.H. OR HIGHER WIND ZONES. CHECK ' DIMENSIONS WITH MANUFACTURER'S DRAWINGS. COLOR TO BE DARK BRONZE - I REVISE FRAMING PLAN FOR SS-4035E WINDOW. — — — — — — — — — — — — — — — — 5'-2" C-1 EP-1 EP-6 8 A17 3 A6 INCLUDE IN METAL PACKAGE AND INSTALLED BY G.C. SCORED LINE (TYP) --\ EP 1 EP-1 SPEAKER r: r T , l- , it v` " — — 'v i Y.. + f .''; OINPGi ITa . i='N/. •: r n-' -r r� j.: - E E - a .. a .. a.: �•" 'S �'' � <-'' 4 E SSED':WAL1 - .: Y. . ♦ A.10.. FQ E NT R L R . EXTERIOR FINISH NOTES E.I.F.S. WALL TEXTURE FINISH Manut Texture STO STO ESSENCE SWIRL DRYVIT QUARTZ PUTZ FINISH NOTES THE FOLLOWING COMPONENTS CAN BE PURCHASED FROM THE APPROVED SIGN VENDORS: • STANDING SEAM ROOF ' BALCONY RAILING ' CLEARANCE BAR ' MENU CANOPY ' GUARD RAIL AWNINGS SHUTTERS THE FOLLOWING COMPONENTS TO BE MANUFACTURERS AND INSTALLED BY THE GENERAL CONTRACTOR LADDER DUMPSTER GATES STO COLORS NA10-0016 - DELIGHTFUL GOLDEN NA01-0061 - EXOTIC RED NA10-0017 -MOCHA BROWN DRYVIT COLORS POPE051020 - DELIGHTFUL GOLDEN POPE021028S - EXOTIC RED POPE031020S - MOCHA BROWN T.O. PARAPET 19'-4"AFF T.O. PARAPET 16'-8" AFF BUILDING SIGN BRICK -HEBRON BRICK - COLOR WILD ROSE BAND B.O. AWNING 4 -4 9'" AFF FINISHED FLOOR 0'-0" AFF. GUTTER & DOWNSPOUT SEE ROOF PLAN LADDER PAINT BRONZETONE TO MATCH STORE FRONT GREASE & CO2 ENCLOSURE BY VENDOR LINE OF OPEN TOP CMU ENCLOSURE re: 3/A5 I PAINT LINE I I I POPEYES LOUISIANA KITCHEN Exterior Finish Schedule NewConstruction and Reimaging Update: 151312012 Mark Location Supplier / Manuf. Material Specification Color Finish / Notes EP-1 MAIN WALL SURFACE PAINT OR EIFS FORMULA #2158-30 DELIGHTFUL 185 Low Lustre ABOVE ACCENT TRIM BENJAMIN MOORE GOLDEN EP-2 WALL SURFACE ACCENT/ PAINT OR EIFS FORMULA #2086-10 EXOTIC RED 185 Low Lustre SHUTTER BORDERS EP-3 WAINSCOT BELOW EIFS / METAL / PAINT #2107-20 MOCHA BROWN 185 Low Lustre ACCENT TRIM 14 1/2"x60" VINYL L2 - VINYL UNFINISHED 030 - PAINTABLE SHUTTERCONTRACTOR.COM SHUTTERS (Balcony) 25 1 /2"x119" VINYL L7S -VINYL UNFINISHED 030 - PRINTABLE EP-4 SHUTTERS SHUTTERS (Building) RAINFOREST BENJAMIN MOORE PAINT #2040-10 FOLIAGE 170 Semi Gloss EP-5 BALCONYAND RAILINGS RAILING VENDOR /TIGER DRYLAC METAL / POWDER COAT RAIL 6009 HUNTER GREEN SMOOTH EP-5 RAILING VENDOR / METAL / PAINT #2040-10 RAINFOREST P-29 DTM Semi Gloss (ALT) BENJAMIN MOORE FOLIAGE EP-6 ISTORE FRONT GLAZING YKKAP ANODIZED ALUMINUM #YB5N DARK BRONZE 21-28DAYS EP-6 STORE FRONT GLAZING #64 (2134-20) RM BRONZETONE P-29 DTM Semi Gloss (A-T) BENJAMIN MOORE METAL / PAINT EP-7 DUMPSTER WALLS / #2107-20 MOCHA BROWN 185 Low Lustre GATES EP-8 BOLLARDS / LOT METAL /ASPHALT /PAINT SAFETY & ZONE RM SAFETYYELLOW P58-10 STRIPING ACRYLIC MARKING SW-1 CORONADO STONE SIMULATED STONE CASCADE MOUNTAIN FOUR RIVERS OVERLAPPING STAIR STEP STONE WAINSCOT VENEER LEDGE SG-1 QUIKRETE VENEER STONE MORTAR POLYMER MODIFIED MOCHABROWN 1137-85 G-1 AWNING GRATE (OPT.) AWNING SUPPLIER METAL / POWDER COAT RAL 6009 HUNTER GREEN SMOOTH 12" OC / GUAGE PER LOCAL C-1 STANDING SEAM CANOPY COPPER SALES, INC. UNA-CLAD UC-4 ALUMINUM REGAL RED CODE REQUIREMENTS EP-9 ANTI -GRAFFITI BENJAMIN MOORE PAINT ALIPHATIC ACRYLIC CLEAR GLOSS M74-00 / M75 (2 COATS) URETHANE ANTI-GRAFITTI COATING (EP-9) SHALL BE APPLIED FROM TOP OF SLAB TO TOP OF CORNICE (ALL FOUR SIDES OF THE BUILDING) popeYes LA Z O w C I Ln Z O Q LLJ Z LLJ = LPG V V u IX- LLJ \J d X >_ 4-J LLJ LLJ Ln 0 no LLJ Ln CL Ln °O J O CL O W IL O O / LL U 0 C Z o >- o Co m ZLIJ v� � LL1 i— U U Z Ln J \ 0 SCALE: 1/4 " - 1'-0" SHEET: A-6 DATE: AUG 2015 PAGE# 3 OF 3 SPECIFICATIONS: DIVISION 7: THERMAL AND MOISTURE PROTECTION GENERAL SECTION 7C: SHEET METALWORK PROVISION 1. SCOPE: FURNISH AND INSTALL GRAVEL STOPS, FLASHING, PARAPET CAP, DOWNSPOUTS, AND GUTTERS. A. ROOFING MEMBRANE FLASHING IS INCLUDED IN SECTION 7B: MEMBRANE ROOFING. MATERIALS 1, MATERIALS SHEET METAL: .032ALUMINUM. 2. NAIL FASTENERS: 1 3/4" X 11 GAUGE GALVANIZED, STAINLESS STEEL, OR ALUMINUM ROOFING NAILS MAY BE USED FOR FASTENERS INTO WOOD WHEN CONCEALED ONLY. 3. WASHERS: NEOPRENE 4. SCREW FASTENERS: CORROSION -RESISTANT, SELF -TAPPING, HEX HEAD SCREW, 1/4" MINIMUM DIAMETER WITH SUFFICIENT LENGTH TO PENETRATE V MINIMUM INTO WOOD OR 1/2" MINIMUM INTO STEEL. PROVIDE NEOPRENE SEALING WASHER FOR EXPOSED FASTENING. PERFORMANCE 1. INSTALLATION: EXPOSED FLASHINGS SHALL BE PAINTED TO MATCH ADJACENT MATERIALS. VERIFY WITH POPEYEV REPRESENTATIVE. SECTION 7D: STANDING SEAM PART 1 - GENERAL CANOPY 1.0 SUBMITTALS A. SUBMIT FOR APPROVAL SAMPLES, SHOP DRAWINGS, PRODUCT DATA. QUALITY ASSURANCE A. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE MANUFACTURERS WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. WARRANTY METAL ROOF SYSTEM MANUFACTURER, UPON FINAL ACCEPTANCE FOR PROJECT, FURNISH A WARRANTY COVERING BARE METAL AGAINST RUPTURE, STRUCTURAL FAILURE AND PERFORATION DUE TO NORMAL ATMOSPHERIC CORROSION EXPOSURE FOR A PERIOD OF 20 YEARS. PART 2 - PRODUCTS (UC-4 SERIES, AS MANUFACTURED AND SPECIFIED BY UNA-CLAD., METAL ROOF SYSTEMS.) 2.0 MATERIALS A. METAL ROOF SYSTEM PROFILE: 1. UC-4 "NO CLIP", 1 1/2" HIGH BATTENS x 12" RIB TO RIB. (SMALL BATTEN-SB) 2. CONCEALED FASTENER B. GAUGE: 1. .026 GAUGE - STEEL C. TEXTURE: 1. SMOOTH. D. FINISH: 1. PREMIUM FLUOROCARBON COATING PRODUCED WITH KYNAR 500 OR HYLAR 5000 RESIN (20 YEAR WARRANTY.) E. MANUFACTURER: 1. UNA-CLAD OR EQUAL. PART 3 - EXECUTION 3.0 INSTALLATION A. COMPLY WITH SMACNA SHEET METAL MANUAL RECOMMENDATIONS. COMPLY WITH ACCESSORY MANUFACTURERS' INSTRUCTIONS AND RECOMMENDATIONS. COORDINATE INSTALLATION WITH ROOFING SYSTEM TO ENSURE WEATHERTIGHT PERFORMANCE. B. ANCHOR SECURELY TO STRUCTURE TO WITHSTAND INWARD AND OUTWARD LOADS. C. ISOLATE DISSIMILAR METALS TO PREVENT GALVANIC CORROSION. DIVISION 9: FINISHES SECTION 9G: EIFS PART 1GENERAL 1.01 DESCRIPTION A. DESIGN REQUIREMENTS: THE STRUCTURAL WALL SYSTEM TO WHICH THE EIFS IS ATTACHED SHALL MEET U240 MAXIMUM ALLOWABLE DEFLECTION CRITERIA AND APPLICABLE BUILDING CODE REQUIREMENTS. 1.02 SUBMITTALS A. SUBMIT SAMPLES FOR APPROVAL AS DIRECTED BY OWNER. 1.03 DELIVERY, STORAGE AND HANDLING A. ALL EIFS MATERIALS SHALL BE DELIVERED IN THEIR ORIGINAL SEALED CONTAINERS BEARING MANUFACTURER'S NAME AND IDENTIFICATION OF PRODUCT WITH WRITTEN APPLICATION INSTRUCTIONS AND APPROPRIATE HEALTH, HAZARD, AND SAFETY DATA. B. ALL EIFS READY -MIXED MATERIALS SHALL BE PROTECTED FROM EXTREME HEAT, SUN AND FROST. FACTORY PROPORTIONED BAGGED MATERIALS SHALL BE STORED OFF THE GROUND AND PROTECTED FROM MOISTURE. 1.04 JOB CONDITIONS A. ALL EIFS MATERIALS SHALL NEVER BE APPLIED IF AMBIENT AND SURFACE TEMPERATURES CANNOT BE KEPT ABOVE 40" F DURING APPLICATION AND DRYING PERIOD. FOR INSTALLATION IN TEMPERATURES LESS THAN 40' F SUPPLEMENTARY HEAT SHALL BE PROVIDED. THE INSTALLED EIFS MATERIALS SHALL BE PROTECTED FROM EXPOSURE TO RAIN AND FREEZING UNTIL DRY. 1.11 WARRANTY A. PROVIDE MANUFACTURERE'S STANDARD LABOR AND MATERIAL WARRANTY. PART 2 PRODUCTS 2.01 MANUFACTURERS A. STO CORP. B. DRYVIT SYSTEMS, INC. 2.02 ADHESIVES A. DISPERSION ADHESIVE - NONCEMENTITIOUS, ACRYLIC BASED ADHESIVE. 2.03 INSULATION BOARD A. NOMINAL 1.0 lb/cubic feet (16 kg/cubic meter) EXPANDED POLYSTYRENE (EPS) INSULATION BOARD IN COMPLIANCE WITH ASTM C 578 TYPE I REQUIREMENTS, AND EIMA GUIDELINE SPECIFICATION FOR EXPANDED POLYSTYRENE (EPS) INSULATION BOARD. 2.04 BASECOAT A. ONE -COMPONENT POLYMER MODIFIED CEMENTITIOUS BASE COAT WITH FIBER REINFORCEMENT AND LESS THAN 33% PORTLAND CEMENT CONTENT BY WEIGHT. 2.05 REINFORCING MESHES A. STANDARD MESH 1. STO MESH -NOMINAL 4.5 oz/sq.yd. (163 g/sq.meter), SYMMETRICAL, INTERLACED OPEN -WEAVE GLASS FIBER FABRIC MADE WITH MINIMUM 25 PERCENT BY WEIGHT ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH STO MATERIALS. B. HIGH IMPACT MESH 1. STO INTERMEDIATE MESH (MESH C) - NOMINAL 11.0 oz/sq.yd. HIGH IMPACT, INTERWOVEN, OPEN WEAVE GLASS FIBER FABRIC WITH ALKALINE RESISTANT COATING FOR COMPATIBILITY WITH STO MATERIALS. 2.06 PRIMER A. STO PRIMER ACRYLIC BASED PRIMER (FOR STO ACRYLIC BASED FINISHES) 2.07 FINISH COAT A. STO ACRYLIC BASED TEXTURED WALL COATING. SEE E.I.F.S. FORMULAS FOR FINISH COLOR. 2.08 JOB MIXED INGREDIENTS A. PORTLAND CEMENT: ASTM C 150, TYPE 1. B. WATER: CLEAN AND POTABLE. PART 3 EXECUTION A. UNDER NO CIRCUMSTANCES SHALL ANY OF THE PRODUCTS BE ALTERED BY ADDING ANY ADDITIVES, EXCEPT FOR SMALL AMOUNTS OF CLEAN WATER AS DIRECTED ON LABEL. ANTIFREEZE, ACCELERATORS, RAPID BINDERS, ETC., ARE FORBIDDEN. B. THE SURFACE TO RECEIVE THE EIFS SHALL BE STRUCTURALLY SOUND, CLEAN, DRY AND FREE OF WARPAGE, RESIDUAL MOISTURE OR DAMAGE FROM MOISTURE. SURFACES SHALL BE UNIFORM, WITH NO IRREGULARITIES GREATER THAN 1/8" in 4'-0". SURFACES SHALL BE INSPECTED FOR COMPLIANCE WITH THE FOLLOWING REQUIREMENTS PRIOR TO INSTALLATION OF THE EIFS: 1. PLYWOOD SHEATHIIG SHALL MEET A.P.A. (AMERICAN PLYWOOD ASSOCIATION) REQUIREMENTS FOR EXTERIOR OR EXPOSURE 1 CLASSIFICATION. APA DESIGN AND CONSTRUCTION GUIDELINES SHALL BE FOLLOWED FOR STORAGE, HANDLING AND INSTALLATION. MANUFACTURER'S PUBLISHED RECOMMENDATIONS SHALL BE FOLLOWED FOR SHALL BE FOLLOWED FOR STORAGE, HANDLING, STORAGE, HANDLING, INSTALLATION AND PROTECTION. ANY SHEATHING NOT IN COMPLIANCE SHALL BE REPLACED TO CONFORM WITH SPECIFICATION REQUIREMENTS PRIOR TO INSTALLATION OF THE EIFS. 2. CONCRETE, MASONRY OR PLASTER SURFACES SHALL BE PROPERLY CURED AND FREE OF DIRT, DUST, OIL, GREASE, MILDEW, FUNGUS, LATENCY, PAINT, EFFLORESCENCE AND ANY OTHER CONTAMINANT. ANY SURFACES NOT IN COMPLIANCE SHALL BE CORRECTED PER MANUFACT. RECOMMENDATIONS PRIOR TO INSTALLATION OF THE EIFS. C. AFTER SATISFACTORY INSPECTION OF SURFACES AND CORRECTION OF ANY DEVIATIONS FROM SPECIFICATION REQUIREMENTS, THE EIFS INSTALLATION MAY BEGIN PER MANUFACTURER'S INSTRUCTIONS. D. THE STARTER STRIP OF MESH SHALL BE WIDE ENOUGH TO ADHERE 4" OF MESH ONTO THE WALL, BE ABLE TO WRAP AROUND THE BOARD EDGE AND COVER APPROXIMATELY 4" ON THE OUTSIDE SURFACE OF THE BOARD. THIS "BACKWRAP" PROCEDURE SHALL BE FOLLOWED AT ALL EXPOSED BOARD EDGES IN ACCORDANCE WITH DETAILS (EXAMPLE -WINDOW AND DOOR HEADS AND JAMBS). ALL AREAS WHERE THE EIFS MEETS DISSIMILAR MATERIAL OR TERMINATES (FOR EXAMPLE, WINDOW AND DOOR FRAMES) SHALL HAVE THE INSULATION BOARD CUT BACK FROM THE ADJOINING MATERIAL A MINIMUM OF 1/4" TO FORM AN ISOLATION JOINT. E. APPLY THE ADHESIVE TO THE BACK OF THE INSULATION BOARD. STAGGER VERTICAL JOINTS AND INTERLOCK BOARDS AT ALL INSIDE AND OUTSIDE CORNERS. APPLY FIRM PRESSURE OVER ENTIRE SURFACE OF THE BOARDS TO 114SURE UNIFORM CONTACT. BOARDS SHALL BRIDGE SHEATHING JOINTS BY A MINIMUM OF 8". ALL BOARD JOINTS SHALL BE BUTTED TIGHTLY TOGETHER TO ELIMINATE ANY THERMAL BREAKS IN THE EIFS. CARE MUST BE TAKEN TO PREVENT ANY ADHESIVE FROM GETTING BETWEEN THE JOINTS OF THE BOARDS. ALL OPEN JOINTS IN THE INSULATION BOARD LAYER SHALL BE FILLED WITH SLIVERS OF INSULATION OR AN APPROVED SPRAY FOAM. F. NAILS, SCREWS, OR ANY OTHER TYPE OF NONTHERMAL MECHANICAL FASTENER SHALL NOT BE USED. G. EXPANSION JOINTS ARE REQUIRED IN THE EIFS WHERE THEY EXIST IN THE SUBSTRATE, WHERE THE EIFS ADJOINS DISSIMILAR CONSTRUCTION, AND AT FLOOR LINES IN MULTILEVEL WOOD FRAME CONSTRUCTION. THE EIFS SHALL TERMINATE AT THE EXPANSION JOINT TO PROVIDE APPROPRIATE JOINT SIZE (SEE DETAILS) AND ALL BOARD EDGES SHALL BE COATED WITH APPROPRIATE GROUND COAT AND MESH IN ACCORDANCE WITH STANDARD "BACKWRAPPING" PROCEDURE. APPROPRIATE SEALANT/PRIMER AND BACKER SHALL BE INSTALLED AFTER GROUND COAT IS FULLY DRY TO PREVENT ANY WATER FORM GETTING INTO OR BEHIND THE SYSTEM. H. USE OF PLASTIC OR METAL CORNER BEADS, STOPBEADS, ETC., IS FORBIDDEN. 1. APPLY APPROPRIATE GROUND COAT OVER THE INSULATION BOARD WITH PROPER SPRAY EQUIPMENT OR A STAINLESS STEEL TROWEL TO A UNIFORM THICKNESS OF APPROXIMATELY 1/16". WORK HORIZONTALLY OR VERTICALLY IN STRIPS OF 40", AND IMMEDIATELY EMBED STANDARD REINFORCING MESH INTO THE WET GROUND COAT. THE MESH SHALL BE DOUBLE WRAPPED AT ALL CORNERS AND OVERLAPPED NOT LESS THAN 2-1/2" AT MESH JOINTS.AVOID WRINKLES IN THE MESH. THE FIP4ISH THICKNESS OF THE GROUND COAT SHALL BE SUCH THAT THE MESH IS FULLY EMBEDDED. ALLOW GROUND COAT TO THOROUGHLY DRY BEFORE APPLYING PRIMER OR FINISH. J. DUPLICATE INSTALLATION PROCESS NOTED IN 3.01 M USING STANDARD MESH CREATING SECOND MESH LAYER AND ADDITIONAL IMPACT RESISTANCE. ALLOW TO DRY BEFORE APPLICATION OF EITHER STO PRIMER (OPTIONAL) OR STO FINISH. K. IF A PRIMER IS USED, APPLY WITH BRUSH, ROLLER OR PROPER SPRAY EQUIPMENT OVER CLEAN, DRY GROUND COAT AND ALLOW TO DRY THOROUGHLY BEFORE APPLYING FINISH. P. APPLY FINISH DIRECTLY OVER THE GROUND COAT (OR PRIMED GROUND COAT) ONLY AFTER THE GROUND COAT/PRIMER HAS THOROUGHLY DRIED. THE FINISH SHALL BE APPLIED BY SPRAYING, ROLLING OR TROWELING WITH A STAINLESS STEEL TROWEL, DEPENDING ON FINISH SPECIFIED. GENERAL RULES FOR APPLICATION OF FINISHES ARE AS FOLLOWS: 1. USE A CLEAN, RUST -FREE, HIGH-SPEED MIXER TO THOROUGHLY STIR THE FINISH TO A UNIFORM CONSISTENCY (SMALL AMOUNTS OF CLEAN WATER MAY BE ADDED TO AID WORKABILITY). 2. AVOID APPLICATION IN DIRECT SUNLIGHT. 3. APPLY FINISH IN A CONTINUOUS APPLICATION, ALWAYS WORKING TO A WET EDGE. 4. WEATHER CONDITIONS AFFECT APPLICATION AND DRYING TIME. HOT OR DRY CONDITIONS LIMIT WORKING TIME AND ACCELERATE DRYING AND MAY REQUIRE ADJUSTMENTS IN THE SCHEDULING OF WORK TO ACHIEVE DESIRED RESULTS; COOL OR DAMP CONDITIONS EXTEND WORKING TIME AND RETARD DRYING AND MAY REQUIRE ADDED MEASURES OF PROTECTION AGAINST WIND, DUST, DIRT, RAIN AND FREEZING. 5. AESTHETIC "U"-GROOVES MAY BE DESIGNED INTO THE SYSTEM. (A MINIMUM OF 3/4" INSULATION BOARD MUST BE LEFT AFTER ANY GROOVES ARE CUT). 6. "R" (RILLED TEXTURE) FINISHES MUST BE FLOATED WITH A PLASTIC TROWEL TO ACHIEVE THEIR RILLED TEXTURE. 7. AVOID INSTALLING SEPARATE BATCHES OF FINISH SIDE -BY -SIDE. 8. APPLY FINISH COLOR TO EIFS MIX AND APPLY TO WALL. COLOR TO MATCH EXTERIOR FINISH SCHEDULE COLORS. L. STO EXTERIOR INSULATION AI4D FINISH TEXTURE SYSTEM: APPLY HIGH IMPACT SYSTEM ADJACENT TO DOORS FOR ADDITIONAL IMPACT RESISTANCE, USING STO INTERMEDIATE MESH. USE THE STANDARD SYSTEM SPECIFICATIONS AT ALL OTHER LOCATIONS. T.O. PARAF 18 -0 AFF. WINDOWS W/ MULLIONS EP-2ik T.O. PARAPET 19'-4" AFF T.O. PARAPET 18'-0" AFF A J-BOX FOR qg LADDER, PAINT OPTIONAL SIGN BRONZETONE 7 TO MATCH STORE A4 MIGHT FIXTURE 6" GUTTER � PAINT EP-4 REAR ELEVATION 2 A6 1 /4"=1'-O" VA LINE OF OPEN TOP C ENCLOSURE I N 0 o i P-1EMOVAL F ❑ EP-3 3" x 5" DOWNSPOUT, PAINT EP-4 MASONRY LINTEL- RE -ENFORCED WITH 4 CONT #3 BARS AND #4 STIRRUPS AT 16" O.C. (SPLIT FACE) WROUGHT IRON - GATE. 2" WELDED FRAME WITH 1/2" PICKETS SPACED AS SHOWN. LOCKING LATCH. PT EP-4 3 CMU ENCLOSURE --SIDE A5 1 /4"=V-O„ EXTERIOR FINISH NOTES E.I.F.S, WALL TEXTURE FINISH Manuf. Texture STO STO ESSENCE SWIRL DRYVIT QUARTZ PUTZ FINISH NOTES THE FOLLOWING COMPONENTS CAN BE PURCHASED FROM THE NATIONAL ACCOUNTS VENDORS: ' STANDING SEAM ROOF ' BALCONY RAILING ' CLEARANCE BAR ` MENU CANOPY ' GUARD RAIL AWNINGS SHUTTERS THE FOLOWING COMPONENTS TO BE MANUFACTURED AND INSTALLED BY THE GENERAL CONTRACTOR LADDER DUMPSTER GATES STO COLORS NA10.0016 - DELIGHTFUL GOLDEN NA01-0061 - EXOTIC RED NA10-0017 - MOCHA BROWN DRYVIT COLORS POPE051020-DELIGHTFUL GOLDEN POPE021028S - EXOTIC RED POPE031020S - MOCHA BROWN _32- f 2'-5 1/2" GREASE & CON ENCLOSURE BY CMU ENCLOSURE A5 1 /4"=1'-O" �"=1'- I L(-L V /1 I I O'V A5 � � 1 4"=1'-0" 1 3"x5"DO" PAINT EP-4 T.O. PARAPET 18'-0" AFF. I-4l99 ME, imp PROVIDE QUICK COUPLE HOSE CONNECTOR & DRAIN VALVE AT FRYERS.RUN SELF -DRAINING PIPE FROM FRYERS TO OUTSIDE COLLECTION UNIT. MASONRY CAP. PAINT. 8X8X16 SPLIT FACE CMU. PAINT NOTE: APPLY EP-9 FULL HEIGHT BASE OF WALL TO TOP OF CORNICE, ALL EXTERIOR WALLS (INCLUDING DUMPSTER ENCLOSURE AND OPEN ENCLOSURE AT BACK OF BUILDING. Popeyes LK - Exterior Finish Schedule New Construction and Reimaging Update: 1 211512010 Mark Location Supplier / Manuf. Material Specification Color Finish / Notes EP-1 MAIN WALL SURFACE ABOVE ACCENT TRIM STO / DRYVIT / BENJAMIN MOORS PAINT / EIFS FORMULA #215840 DELIGHTFUL GOLDEN 185 EP-2 PARAPET CAP / ACCENT TRIM EIFS /METAL /PAINT #2086-10 EXOTIC RED 185 EP-3 WAINTSCOT BELOW ACCENT TRIM EIFS / METAL / PAINT #2107-20 MOCHA BROWN 185 EP-4 SHUTTERS SHUTTERCONTRACTOR.COM 12" VINYL SHUTTERS L2-VINYL UNFINISHED 030-PAINTABLE BENJAMIN MOORE PAINT #2040-10 RAINFOREST FOLIAGE 170 EP-5 BALCONY AND RAILINGS RAILING VENDOR / TIGER DRYLAC METAL / POWDER COAT RAL 6009 HUNTER GREEN SMOOTH EP-5 (ALT) BALCONY AND RAILINGS RAILING VENDOR / BENJAMIN MOORE METAL / PAINT #2040-10 RAINFOREST FOLIAGE M29 EP-6 STORE FRONT YKK AP ANODIZED ALUMINUM #YB5N DARK BRONZE 21-28 DAYS EP-6 (ALT) STORE FRONT BENJAMIN MOORE METAL / PAINT #64 RM BRONZETONE M29 EP-7 DUMPSTER WALLS / GATES BENJAMIN MOORS METAL / PAINT #2107-20 MOCHA BROWN 185 EP-8 BOLLARDS / LOT STRIPING METAL / ASPHALT / PAINT #M58-10 SAFETY YELLOW NO PRIMER SWA STONE WAINSCOAT CORONADO STONE SIMULATED STONE VENEER VENETIAN VILLA STONE VERSAILLES CATALOGUE SGA QUIKRETE STONE VENEER MORTAR POLYMER MODIFIED MOCHA BROWN 1137-85 G-1 AWNING GRATE (OPT.) AWNING SUPPLIER METAL / POWDER COAT RAL 6009 HUNTER GREEN SMOOTH C-1 STANDING SEAM CANOPY COPPER SALES, INC. UNA-CLAD UC4 ALUMINUM REGAL RED 12" OC / GAAGE PER LOCAL CODE REQUIREMENTS EP-9 ANTI -GRAFFITI BENJAMIN MOORE PAINT ALIPHATIC ACRYLIC URETHANE CLEAR GLOSS M74-00 / M75 (2 COATS). APPLY TO ENTIRE FACADE, ALL FOUR SIDES, TOP OF SLAB TO TOP OF CORNICE, TYPICAL. popeYes Lu 0 Z _O Uj Z W .j U = Ln NNW `v U @) U a) XLLJ >- W Q 1n L W I. Q�� o a � J GeV O CL W CL tT H U w i tV0 r A 0 U' O m m Z U up Ln 0 -j LU > Uj d 0 0 U_ SCALE: 1 /4 " V-0" SHEET: A-5 DATE: J U N E 2015 PAGE # 2 OF 3