Loading...
HomeMy WebLinkAboutSEAWAY 30" CRUDE OIL PIPELINE PERMITCity of La Porte Planning Department 604 West Fairmont Parkway La Porte, Texas 77571 Phone: (281) 471-5020 — Fax: (281) 470-5005 www.laportetx.gov November 7, 2013 Mustang Engineering, L.P. c/o Louis Rigby, Sr. Right -of -Way Agent 100 NASA Pkwy., Ste. 300, Houston, TX 77058 Houston, TX 77058 RE: Pipeline Transportation Permit (PT-13-37000001) Dear Mr. Rigby: Your application for a permit to construct a 30" crude oil pipeline within the city limits of La Porte has been approved. You are hereby authorized to begin your project as governed by regulations set forth in City of La Porte Ordinance 2004-2755 and the conditions stipulated below: 1. Conduct pre -construction meeting with City of La Porte staff no less than 48 hours prior to commencement of construction. 2. Post copies of this Permit at all public right-of-way crossings. Per Sec. 102-235, Item (k) of La Porte's Code of Ordinances (Ord. 2004-2755): "the Permittee shall, at any time in the future, where such pipeline or portion thereof crosses or is laid within, under or across any street, road or utility right-of-way, drainage way or public way existing or projected at the time the permit is issued, reposition such pipeline (which shall include lowering or raising the pipeline, as well as casing it, if required) at the Permittee's sole expense, when the City reasonably requires such action incidental to public construction or public improvement: construction, maintenance and improvement of streets, water lines, sanitary sewer lines, storm sewers, ditches and public utilities. The City shall give the Permittee prior written notice of the need for repositioning location, and such notice shall be mailed certified mail, return receipt requested, to the Permittee as designated in the application. The Permittee shall have six (6) months to complete such repositioning. 4. Any and all construction materials utilized by the pipeline contractor for access across any and all drainage ditches, drainage paths and/or drainage channels shall be promptly removed by the contractor upon completion of construction at each crossing. 5. Any fill material resulting from construction shall be removed or be subject to a Fill Permit from the City. 6. Prior to an anticipated major rain event, contractor shall remove all construction -related materials and/or fill from any drainage way or roadside ditch as to not impede stormwater runoff. Sincerely, Tim Tietjens Planning Director CC: Finance Department; PT-13-37000001 File