My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-28-19 CenterPoint Energy Updating its Schedule of Rates
LaPorte
>
.Ordinances
>
Franchises
>
Electric Service Provider for CLP
>
2019
>
06-28-19 CenterPoint Energy Updating its Schedule of Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 7:59:56 AM
Creation date
11/26/2024 9:42:12 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Contracts/Leases/Agreements
Date
6/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CenterPoint. June 28, 2019 CenterPoint Energy <br /> 1111 Louisiana Street <br /> Energy Houston,TX 77002-5231 <br /> P.O.Box 2628 <br /> Mayor and City Council Houston,TX 77252 2628 <br /> City of LaPorte <br /> LaPorte, Texas <br /> Ladies and Gentlemen: <br /> By this letter, CenterPoint Energy is updating its Schedule of Rates on file with the City of <br /> LaPorte. The attached rates are currently effective for bills rendered on or after June 19, 2019, in the <br /> City of LaPorte. Notably,consistent with the results of the ministerial review of the Company's 2019 <br /> Gas Reliability Infrastructure Program("GRIP")filing at both the City and the Railroad Commission <br /> of Texas ("Commission"), the GRIP rate schedules attached provide for a slightly lower 2019 GRIP <br /> rate than what was effective for bills rendered on or after May 28,2019. The Company is voluntarily <br /> implementing the lower rate,which will be applied on a system-wide basis throughout its entire Texas <br /> Coast Division. These rates must be observed by CenterPoint until changed as provided by the Gas <br /> Utility Regulatory Act. <br /> Please find attached the following CenterPoint Energy rate schedules: <br /> Rate Schedule No. R-2096A-I-GRIP 2019 <br /> Rate Schedule No. GSS-2096A-I-GRIP 2019 <br /> Rate Schedule No. GSLV-627A-I-GRIP 2019 <br /> Rate Schedule No. PGA-15T <br /> Rate Schedule No. TA-14 <br /> Rate Schedule No. FFA-9 <br /> Rate Schedule No. MISC-17 <br /> General Rules and Regulations <br /> No action on the part of the City is required. If you have any questions regarding these rate <br /> schedules,please contact Keith L. Wall, Director of Regulatory Affairs, at 713-207-5946. <br /> Sincerely, <br /> Keith L. Wall <br /> Director of Regulatory Affairs <br /> Attachments <br /> DELIVERED TO: <br /> • <br /> I—) ► , ► of <br /> NAME OFFICE Mayor, City Secret. , etc.) <br /> i� <br /> X <br /> the City of LaPorte on this ! day of u , 19 <br /> 1114 r <br /> SNA ' Y <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.