My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1995-2026
LaPorte
>
.Ordinances
>
1990's
>
1995
>
O-1995-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:56 PM
Creation date
7/24/2006 1:57:17 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/20/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />HOUOJ:98046 <br /> <br />e <br /> <br />e <br /> <br />rate design of each rate class on an equivalent basis to all listed charges in <br /> <br />their respective tariffs. <br /> <br />2. The applicability provisions of the GH~ rider to the MGS tariff was <br />modified to include traffic signals operated by state, county, and municipal <br />governments and the rider was renamed as the Governmental Lighting & <br />Traffic Control ("GLTC") Rider. Within 90 days after the 12065 Final <br />Order Date, HL&P will give notice of the availability of the GL TC Rider <br />for service to traffic signals to Texas State Agencies and all municipalities <br />and counties within its service territory. The notice to each governmental <br />entity will include a listing of all of their accounts which, based on SIC <br />codes, HL&P knows qualify for Rider GL rc. <br />3. The Tariff for Electric Service includes a wheeling tariff to enable QF's, <br />other wholesale power suppliers, and wholesale power purchasers to <br />purchase transmission wheeling for periods as shan as one hour. <br /> <br />4. <br /> <br />The minimum demand threshold in the LGS rate was lowered to 400 kVa. <br />Within 90 days after the 12065 Final Order Date, HL&P will give <br />individual written notices of this change in the minimum demand threshold <br />to MGS customers taking at demand levels of 400 leVa or greater. <br />The tail block energy charge in the MGS rate was lowered to <br />SO.OO575/kwh with corresponding increases to the first two energy blocks. <br /> <br />5. <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.