My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1996-2111
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1996
>
O-1996-2111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:58 PM
Creation date
7/25/2006 11:47:30 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/10/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />," <br /> <br />e <br /> <br />e <br /> <br />reason is required to render Construction Phase services in respect <br />of any prime contract for construction, materials or equipment more <br />than 60 days after Substantial Completion is achieved under that <br />contract, the various rates of compensation provided for elsewhere <br />in this Agreement may be subject to equitable adjustment. <br /> <br />4.12 In the event that :the work designed or specified by <br />ARCHITECT is decided to be furnished or Derformed under more than <br />one Drime contract. the ARCHITECT will be comDensated in accordance <br />with DaraaraDh 5.1.2. <br /> <br />SECTION 5 - PAYMENTS TO ARCHITECT <br /> <br />5.1 OWNER has established an initial construction cost limit <br />of $ 285,000 for the project as available for construction. <br /> <br />5.1.1 For Basic Services. OWNER shall pay ARCHITECT for Basic <br />Services rendered under section 1 (as amended and supplemented by <br />Exhibit A "Further Description of Basic Services and Related <br />Matters") as follows: <br /> <br />5.1.1.1 A stipulated lump sum in the amount of thirty three <br />thousand dollars ($ 33,000.00). Progress payments for Basic <br />Services in each phase shall total the following percentages of the <br />total basic compensation payable: <br /> <br />Preliminary Design Phase <br />Construction Documents Phase <br />Bidding or Negotiations Phase <br />Construction Phase <br />Operational Phase <br /> <br />thirtv <br />fortv <br />five <br />twentv <br />five <br /> <br />percent (~%) <br />percent (-!Q%) <br />percent (-..2,%) <br />percent (~%) <br />percent (~%) <br /> <br />$ 33,000.00 <br /> <br />Total Compensation for Basic Services <br /> <br />5. 1. 1.2 Should . the ARCHITECT I S Preliminary Construction Cost <br />Estimate exceed the lowest bona fide proposal or bid amount in <br />section 5.1 as available for construction, the ARCHITECT may be <br />required at the discretion of the OWNER to amend the design to <br />bring the construction cost estimate within the amount specified <br />without additional cost to the OWNER. <br /> <br />5.1.1.3 If the work is not carried on after Construction Document <br />Phase and drawings, specifications and Construction Documents are <br />completed and approved, the OWNER will pay the ARCHITECT through <br />the Construction Documents Phase in accordance with section 5.1.1 <br />above; or, if the bids have been received, the OWNER will in <br />addition pay the ARCHITECT seventv-five percent ( 75%) of the lump- <br />sum fee as specified in section 5.1.1.1. <br /> <br />5.1.2 For Additional Services. OWNER shall pay ARCHITECT for <br />Additional Services rendered under section 2 as follows: <br /> <br />5-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.