Laserfiche WebLink
<br />~ <br />~ <br /> <br />e <br />CLAUNCH & MILLER, INC. <br />Engineering Consultants <br /> <br />ATTACHMENT "A" <br /> <br />I <br /> <br />II I! <br />I\~":~' 1 0 19S9 <br /> <br />I CITY SEC,,~ ,;;iiY.S ! <br />.._-=....,9FFJCE ~ <br />'--I_~-""~',,1.~JC~_____ . <br /> <br />October 25, 1999 <br /> <br />Mr. Steve Gillett <br />Director of Public Works <br />P.O, Box 1115 <br />La Porte, TX 77572-1115 <br /> <br />RE: Engineering Services for Waterline Improvements <br />on Catlett and Park Drive <br /> <br />Dear Mr. Gillett: <br /> <br />Claunch & Miller, Inc, (CMI) is pleased to submit this proposal for providing engineering services <br />on the above referenced project. <br /> <br />DESCRIPTION OF PROJECT <br /> <br />The project consists of waterline improvements in two (2) separate locations, <br /> <br />Catlett- This improvement includes the replacement of an existing 6" waterline with a new <br />8" waterline along Catlett Street from Farrington Blvd. to Valley Brook Drive <br />(approximately 2,150'). This project also includes the replacement of all of the existing <br />sidewalk on the north side of Catlett for this segment. <br /> <br />Park Drive- This improvement involves the replacement of an existing 6" waterline with an <br />8" waterline along park Drive from to Oak Grove to Bayridge (approximately 2000 L.F.). <br /> <br />The preliminary estimated construction cost for the improvements is $316,775.45. <br /> <br />Page 1 of6 <br /> <br />3701 Kirby Drive. Suite 860. Houston. Texas 77098. (713) 524-7113 <br />