My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2366
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1999
>
O-1999-2366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:03 PM
Creation date
7/25/2006 1:58:08 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
11/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. -- ------, <br />1- --_. --.- ---, <br />......_-----....--, .- <br />! "..---."... '\.. . <br />- ( 1<'(Jf\,j <br />. ,---- \,.... <br />I .....___._ .-1"'"'. --. <br />L--' ------- J .1 <br /> <br />e <br /> <br />e <br /> <br />SCOPE <br /> <br />The scope of engineering services is as follows: <br />Survey Services <br /> <br />. Provide survey services on each of the project sites suitable for design. <br /> <br />. Vertical elevation information on all three project sites will be based on an assumed <br />datum. <br /> <br />Geotechnical Service <br /> <br />. Provide a geotechnical report presenting an investigation of the soils at Catlett and <br />Park Drive, <br /> <br />. The geotechnical report will provide usual and customary information on the existing <br />soil. It will include bedding and backfill recommendations, trench safety <br />information. The report will be based upon information obtained from two borings <br />along Catlett and two along Park Drive. Each boring will be approximately ten (10) <br />feet deep, <br /> <br />PRELIMINARY ENGINEERING PHASE <br /> <br />. Research existing utilities in the project area. <br /> <br />. Determine a recommended alignment for the new waterlines <br /> <br />. Determine construction method and/or scheduling to minimize disruption of water service <br />to the community, <br /> <br />. Take photographs of all sites including all driveways, <br /> <br />. Prepare estimated construction costs for the project. <br /> <br />. Develop a project schedule. <br /> <br />. Prepare a letter report presenting the findings, estimated costs, and schedules for the work, <br /> <br />Page 2 of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.