Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />PBS&J <br />ENVIRONMENTAL TOXICOLOGY LABORATORY <br /> <br />Mr Stephen L Gillett <br />City of La Porte <br />4 August 1999 - Page 3 <br /> <br />EstinW:ed Task 5 COST for Data Evaluation & Reporting <br />(16 hrs Sr. Scientist + 4 hrs Clerical) <br /> <br />up to $ 2,000.00 <br /> <br />Subtotal <br /> <br />S 7.700.00 <br /> <br />If Confinnation is successful, a plan and cost to track the source of toxicity will be needed at that <br />time. (Projection of the cost is not possible at this time because of the varied methods). <br /> <br />Task 6 - Reoortino and Consultino <br /> <br />PBS&J will provide experienced, Senior Project Scientists to prepare reports and give consulting services as <br />needed to support the City in the execution of this TRE. Labor and other direct project charges associated <br />with reports and consulting services will be billed in accordance with the attached Standard Rate Schedule. <br />Resumes for Dr. MacGregor, Dr. Faust Parker & Mr. James Home are attached. Also a summary of past and <br />current TRE projects supervised by Dr. MacGregor is attached. <br /> <br />The costs for Task 6 will very with the needs; however, based on past experience. the level of effort will be: <br />2 to 4 hours ($220 to $500) fer each of 4 Quarterly Activity reports (Permit required); and a final report upon <br />identification or cessation of toxicity, not to exceed $2,500. <br /> <br />Estimated Task 6 COST: $500(X 4) + $2.500 = <br /> <br />$4.500.00 <br /> <br />Total Scope of Work Costs: <br /> <br />TASK 1 - General Outline <br />TASK 2 - TRE Plan <br />TASK 3- Monthly tests <br />TASK 4- Phase 1 <br />TASK5-Confinnation <br />TASK 6- Consulting <br /> <br />$ 500 <br />$ 2.000 <br />$10,200 + sampler rental <br />$ 8.525 <br />$ 7.700 <br />$ 4.500 <br /> <br />Grand Total up to <br /> <br />$33.425 <br /> <br />Schedule <br /> <br />PBS&J can begin work immediately upon authorization by City of La Porte. <br /> <br />Task 1 (general outline) will be submitted to City for signatures on or before 02 September 1999. <br /> <br />Task 2 (TRE Action Plan) will be completed for your signatures and submitted to the EPA and TNRCC on <br />or before 15 October 1999. <br /> <br />Task 3 (Monthly biomonitoring) should commence immediately. <br /> <br />Tasks 4, and 5 (Phase 1 Characterizationl Confirmationsl Consulting) will be initiated immediately upon <br />identification of a suitable toxic sample during the biomonitoring program (Task 3). <br /> <br />Task 6 (Consulting I Data evaluation) will commence with completion of Task 1 (General Outline). <br />