My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2346
LaPorte
>
.Ordinances
>
1990's
>
1999
>
O-1999-2346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 2:25:21 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
7/26/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />tit <br /> <br />It <br /> <br />4. During the Construction Documents Phase ARCHITECT shall: <br /> <br />Prepare construction documents ready for bidding, including <br />the following tasks: <br /> <br />a. <br /> <br />Construction drawings will <br />appropriate scale and include: <br /> <br />Cover Sheet/Area Maps <br />Location Plans/Sheet Indicators <br />Final Site Plan <br />Mechanical Plans and Elevations <br />Final Electrical and Instrumentation <br />Detail Sheets <br /> <br />be <br /> <br />prepared <br /> <br />at <br /> <br />b. Concurrent with the development of design drawings, <br />the ARCHITECT will develop contract documents and <br />specifications. Final specifications will be <br />presented to OWNER for approval. <br /> <br />c. Attend --L- meetings with City staff to discuss <br />proj ect and direction of the work. After each <br />meeting ARCHITECT shall circulate for approval a <br />set of minutes that outline the key topics <br />discussed and any decisions, directions, etc. <br />agreed upon by OWNER and ARCHITECT. <br /> <br />d. Make fonnal submittal of Drawings, Specifications <br />and Contract Documents for the OWNER's review at <br />the following completion stages: <br /> <br />Interim - 50 % of Detailed Design provide .1. <br />set. <br />Pre-Final - 90 % of Detailed Design provide 3 <br />sets. <br />Final - 100% of Detailed Design provide 5 <br />sets. <br /> <br />e. The ARCHITECT will develop a final "Total Probable <br />cost" estimate. <br /> <br />f. Provide document sets to OWNER as outlined in <br />Paragraph 1.4.5. <br /> <br />The Construction Document Phase Services will be completed and <br />the Report submitted within 90 calendar days following <br />written authorization from OWNER to ARCHITECT to proceed with <br />that phase of services. <br /> <br />A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.