Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />ARCHITECT for such Additional Services, which will be paid for by OWNER as indicated <br />in Section 5. <br /> <br />2.2.1 Services in connection with work directive changes and change orders to reflect <br />changes requested by OWNER if the resulting change in compensation for Basic Services <br />is not commensurate with the addition services rendered. <br /> <br />2.2.2 Services in making revisions to Drawings and Specifications occasioned by the <br />OWNER's acceptance of substitutions proposed by Contractor(s); and services after the <br />award of each contract in evaluation and detennining the acceptability of an unreasonable <br />or excessive number of substitutions proposed by Contractor. <br /> <br />2.2.3 Services resulting from significant delays, changes or price inaeases occurring as <br />a direct or indirect result of material, equipment or energy shortages. <br /> <br />2.2.4 Additional or extended services during construction made necessary by (1) work <br />damaged by fire or other cause during construction, (2) a significant amount of defective or <br />neglected work of any Contractor, (3) acceleration of the progress schedule involving <br />services beyond nonnal working hours. and (4) default by any Contractor. <br /> <br />2.2.5 Services (other than Basic Services during the Operation Phase) in connection with <br />any partial utilization of any part of the Project by OWNER prior to Substantial Completion. <br /> <br />2.2.6 Evaluating an unreasonable or extensive number of claims submitted by <br />Contractor( s) or others in connection with the work. <br /> <br />2-3 <br />