Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />The Design Development Phase Services will be completed and Contract Documents and <br />ARCHITECTs opinion of costs submitted within 75 days following written authorization <br />from OWNER to ARCHITECT to proceed with that phase of services. <br /> <br />4. During the Construction Documents Phase ARCHITECT shall: <br /> <br />Prepare construction documents ready for bidding, including the following tasks: <br />a. Construction drawings will be prepared at appropriate scale and <br />include: <br /> <br />Cover Sheet/Area Maps <br />Location Plans/Sheet Indicators <br />Final Site Plan <br />Mechanical Plans and Elevations <br />Final Electrical and Instrumentation <br />Detail Sheets <br /> <br />b. Concurrent with the development of design drawings, the <br />ARCHITECT will develop contract documents and specifications. <br />Final specifications will be presented to OWNER for approval. <br /> <br />c. Attend ~ meeting(s) with City staff to discuss project and direction of <br />the work. After each meeting ARCHITECT shall circulate for <br />approval a set of minutes that outline the key topics discussed and <br />any decisions, directions, etc. agreed upon by OWNER and <br />ARCHITECT. <br /> <br />d. Make formal submittal of Drawings, Specifications and Contract <br />Documents for the OWNER's review at the following completion <br />stages: <br /> <br />Interim <br />Pre-Final <br />Final <br /> <br />- 50 % of Detailed Design provide 2 set. <br />- 90 % of Detailed Design provide 3 sets. <br />- 100% of Detailed Design provide 5 sets. <br /> <br />e. The ARCHITECT will develop a final '70tal Probable cost" <br />estimate. <br /> <br />f. Provide document sets to OWNER as outlined in <br />Paragraph 1.4.5. <br /> <br />The Construction Document Phase Services will be completed and the Report <br />submitted within 135 calendar days following written authorization from OWNER <br />to ARCHITECT to proceed with that phase of services. <br /> <br />5. During the Bidding or Negotiating Phase ARCHITECT shall: <br /> <br />A-2 <br />