My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2312
LaPorte
>
.Ordinances
>
1990's
>
1999
>
O-1999-2312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 3:06:57 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />5. During the Bidding or Negotiating Phase ARCHITECT shall: <br /> <br />a. Assist OWNER in conducting the prebid conferences and <br />prequalification of bidders as required by City of La Porte <br />Ordinance No. 1476-A <br /> <br />Ordinance 1476-A requires all Contractors desiring to bid on <br />construction projects having an estimated construction cost of <br />greater than $300,000, must pre-qualify by filing a satisfactory <br />Contractor's Statement. The Contractor's Statement requires <br />the filing of both a Financial Statement and an Equipment and <br />Experience Statement. <br /> <br />The ARCHITECT shall review the Equipment and Experience <br />Statements submitted by the Contractor, check references and <br />prepare a written report and recommendation based on their <br />findings. <br /> <br />The ARCHITECT shall not be responsible for evaluating the <br />financial statement submitted by Contractors. <br /> <br />The Bidding or Negotiating Phase Services will be completed per terms of <br />paragraph 4.6. <br /> <br />6. During the Construction Phase ARCHITECT shall: <br /> <br />a. During the Construction Phase the ARCHITECT shall <br />make visits to the site at intervals appropriate to the <br />various stages of construction. After contractor has <br />submitted construction schedules, the OWNER and <br />ARCHITECT will mutually agree on key stages of <br />construction that will warrant and require visits by <br />ARCHITECT. However, the total visits to site by the <br />ARCHITECT shall average 1 per week over the term of <br />construction. <br /> <br />The Construction Phase Services will be completed per terms of paragraph 4.7. <br /> <br />A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.