Laserfiche WebLink
<br />. <br />DENOTES ERROR IN BID DOCUMENT. CORRECTED AMOUNT SHOWN, INCORRECT AMOUNT SHOWN IN PAREN1l1ESES. <br /> <br /> (5) (6) (7) (8) <br /> HUBCO INC. CONRAD CONSTRUCTION CO INC. WHITELAK. INC. TEXAS-STERLING CONSTRUCTION <br />SECTION 5 . PAVING <br />ITEM <br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID <br />46 Base Repair with 8" Hot Mix Asphalic TON 297 S 61.00 S 18,117.00 S 42.00 S 12.474.00 S 50.00 S 14,850.00 S 75.00 S 22,275.00 <br /> Concrete Base Course, ComDlete in PI.lce <br />47 2" Hot Mixed Asphalic Concrete. Type' D" TON 691 S 38.00 S 26,258.00 S 41.44 S 28.635.04 S 50.00 S 34,550.00 S 42.00 S 29,022.00 <br /> ComDlele in Place for <br /> <br />Page70f <br /> <br />18 <br /> <br />e <br /> <br />45 <br /> <br />44 <br /> <br />43 <br /> <br />42 <br /> <br />41 <br /> <br />40 <br /> <br />39 <br /> <br />38 <br /> <br />37 <br /> <br />36 <br /> <br />e <br /> <br />35 <br /> <br />34 <br /> <br />33 <br /> <br />32 <br /> <br />DESCRIPTION <br />Class "0" Concrete Seal Slab., <br />Complete in Place for <br />Storm Sewer Manhole (24"-42"), per H.l <br />470-2. Complete in Place for <br />Storm Sewer Manhole (48"-72'1, per H.t:. <br />470-2, Complete in Place for ~ <br />Storm Sewer Manhole on Existing R.C.!'. <br />:(24"-42"), Complete in Place for _ <br />,Storm Sewer Manhole on R.C.B.. Per H C. <br />i470-2, Complete In Place for <br />Type "A" InleL Modified, <br />,Complete In Place for <br />Type "A" with Concrete Apron <br />Complete in Place for <br />Roadside Dttch Interceptor Structure, p.'!' <br />Plans, Complete in Place for _ <br />Special Storm Junction Box, per Plans <br />Complete In Place for _ <br />Precast 3Q.inch Safety End TreafmenL <br />3:1. Complete In Placa for <br />Precast 3O-inch Safety End Treatment, <br />3:1. Complete In Place for <br />18.inch Reinforced Concrete Collar, <br />Completa in Place for _ <br />8-inch Thick. 39 Inch Brick Wall Plug, <br />Complete In Placa for <br />Broken Concrete Rip-Rap with 1-Layer <br />Trevira 1125. Geotextile Fabric If Apprc lad <br />Equal, Complete In Place for <br />Trench Safety System, (5'-10'), All WidllS, <br />Com...2!,ete in Place for <br />TOTAL COST - f ECTION 4 <br /> <br />$ <br /> <br />754,948.00 <br /> <br />S <br />i <br /> <br />688,943.48 <br /> <br />$ <br /> <br />755,395.00 <br /> <br />LF <br /> <br />SY <br /> <br />EACH <br /> <br />EACH <br /> <br />EACH <br /> <br />.00 <br /> <br />70.00 <br /> <br />I <br />i <br />i <br />i <br />i <br /> <br />EACH <br /> <br />EACH <br /> <br />EACH <br /> <br />EACH <br /> <br />EACH <br /> <br />3 <br /> <br />'5 <br /> <br />, <br />i <br /> <br />.300.00 <br />1.850.00 <br /> <br />$ <br />'i <br /> <br />3,900.00 <br />9.250.00 <br /> <br />S <br /> <br />S <br /> <br />I <br /> <br />.240.41 <br /> <br />3,721.23 <br /> <br />$ <br /> <br />4,500.00 <br /> <br />EACH <br /> <br />16 <br /> <br />$ <br /> <br />1,000.00 <br /> <br />I <br /> <br />16,000.00 <br /> <br />$ <br /> <br />1,000:00 <br /> <br />16,000.00 <br /> <br />$ <br />i <br /> <br />2,500.00 <br /> <br />Bi'ili.iiO <br /> <br />$ <br /> <br />12,lKlO.00 <br /> <br />EACH <br /> <br />4 <br /> <br />$ <br /> <br />2,200.00 <br /> <br />$ <br /> <br />8,800.00 <br /> <br />I <br /> <br />.700.00 <br /> <br />6,800.00 <br /> <br />$ <br />'i <br />i <br /> <br />2;000.00 <br /> <br />5,Oii6:OO <br /> <br />10,000.00 <br /> <br />EACH <br />EACH <br /> <br />1 <br /> <br />2 <br /> <br />I <br />i <br /> <br />2,000.00 <br />2,700.00 <br /> <br />$ <br /> <br />5,400.00 <br /> <br />S <br /> <br />2,000.00 <br /> <br />4,000.00 <br /> <br />$ <br />i <br /> <br />2,000.00 <br />2.500.00 <br /> <br />$ <br /> <br />2,000.00 <br /> <br />I <br /> <br />,500.00 <br /> <br />1.00 <br /> <br />50.00 <br /> <br />I <br />'i <br />'i <br />'i <br />'i <br />'i <br />'i <br />'i <br />'i <br />'i <br />i <br />'i <br />i <br />i <br /> <br />.00 <br /> <br />36.00 <br /> <br />3,201 <br /> <br />80 <br /> <br />16 <br /> <br />4 <br />'2 <br /> <br />3.201.00 <br /> <br />19,800.00 <br />4,iiii'[OO <br />400.00 <br />3,2O'[ijO <br />5,600.00 <br /> <br />24 <br /> <br />2 <br /> <br />'9 <br /> <br />2,003.68 <br /> <br />2,003.68 <br /> <br />1,500.00 <br /> <br />$ <br />'i <br />i <br />i <br />'i <br />'i <br />i <br />i <br />'i <br />i <br />i <br />i <br />i <br />i <br /> <br />i <br /> <br />$ <br /> <br />740,707.00 <br /> <br />I <br /> <br />$ <br /> <br />S <br /> <br />$ <br /> <br />$ <br /> <br />3.201.00 <br /> <br />4,000.00 <br />4,000.00 <br /> <br />s <br /> <br />I <br /> <br />5.~ <br /> <br />100.00 <br /> <br />I <br /> <br />I <br /> <br />16,005.00 <br /> <br />8,000.00 <br /> <br />$ <br /> <br />S <br /> <br />3,201.00 <br /> <br />2,880.00 <br /> <br />$ <br /> <br />$ <br />i <br /> <br />200.00 <br /> <br />,000.00 <br />200.00 <br /> <br />, <br /> <br />$ <br /> <br />250.00 <br /> <br />500.00 <br /> <br />,000.00 <br /> <br />$ <br /> <br />$ <br />i <br />i <br /> <br />200.00 <br /> <br />500.00 <br />,000.00 <br />250.00 <br /> <br />S <br /> <br />I <br /> <br />3,200.00 <br /> <br />500:00 <br /> <br />300.00 <br /> <br />500.00 <br /> <br />$ <br /> <br />I <br /> <br />4,800.00 <br /> <br />1,000.00 <br /> <br />I <br /> <br />,316.00 <br /> <br />5,264.00 <br /> <br />I <br /> <br />4,000.00 <br /> <br />900.00 <br /> <br />$ <br /> <br />3,llllO.00 <br /> <br />S <br /> <br />S <br />i <br /> <br />825.00 <br /> <br />1,600.00 <br />1,500.00 <br /> <br />$ <br />i <br /> <br />3,200.00 <br />'3,5OO]lj <br /> <br />s <br /> <br />I <br /> <br />.064.00 <br /> <br />,940.41 <br /> <br />25,536.00 <br /> <br />17,463.69 <br /> <br />4,007.36 <br /> <br />10,018.40 <br /> <br />$ <br />'i <br />'i <br />i <br /> <br />1,500.00 <br />2,000.00 <br />2,000.00 <br />2,500.00 <br /> <br />S <br /> <br />I <br /> <br />12,000.00 <br /> <br />22,500.00 <br /> <br />750.00 <br /> <br />1,200.00 <br /> <br />S <br /> <br />$ <br /> <br />18,000.00 <br /> <br />10,800.00 <br /> <br />I <br /> <br />I <br /> <br />4,000.00 <br /> <br />10,lIOO.00 <br /> <br />2,000.00 <br /> <br />2,000.(.0 <br /> <br />S <br /> <br />$ <br /> <br />4,000.00 <br /> <br />10,000.00 <br /> <br />l,5llO.00 <br /> <br />$ <br /> <br />4,500.00 <br /> <br />1,300.00 <br /> <br />S <br /> <br />2Cl,8Oll.oo <br /> <br />2,500.00 <br />2,000.00 <br /> <br />S <br />i <br /> <br />5,000.00, <br />8,000.00 <br /> <br />2,000.00 <br /> <br />$ <br /> <br />2,000.00 <br /> <br />SECTION 4 <br />ITEM <br />NO. <br />31 <br /> <br />UNIT <br />SY <br /> <br />BID QUANT. <br />1,500 <br /> <br />$ <br /> <br />UNIT B.!Q <br />20.00 <br /> <br />$ <br /> <br />TOTAL BID <br />3O,OQ(j.00 <br /> <br />I <br /> <br />UNIT BID <br />17,00 <br /> <br />TOTAL BID <br />25,500.00 <br /> <br />I <br /> <br />UNIT BID <br />17.00 <br /> <br />$ <br /> <br />TOTAL BID <br />25,500.00 <br /> <br />UNIT BID <br />17.00 <br /> <br />$ <br /> <br />TOTAL BID <br />25,~.OO <br /> <br />DRAINAGE SYSTEM <br /> <br />1 <br /> <br />(5) <br />HUBCO. INC. <br /> <br />SUNRISE DRIVE FROM H.e.F.e.D. UNIT A104-1Q.GO to FAIRFIELD AVENUE <br /> <br />BID TABULATION FOR <br /> <br />(6) <br />CONRAD CONSTRUCTION CO, INC. <br /> <br />(7) <br />WHITELAK. INC. <br /> <br />I <br /> <br />(8) <br />TEXAS.STERlING CONSTRUCTION <br />