Laserfiche WebLink
<br />DENOTES ERROR IN BID DOCUMENT. CORRECTED AMOUI\"T SHOWN. INCORRECT AMOUNT SHOWN IN PARENTHESES <br /> <br />TOTAL CONSTRue' 'ION COST - SUNRISE DRIVE <br /> <br />948,902.88 <br />(*$948,902.87) <br /> <br />966,338.70 <br />(*$968,138.70) <br /> <br />PageS d <br /> <br />16 <br /> <br />e <br /> <br />54 <br /> <br />53 <br /> <br />DESCRiPTION <br />Place, Maintain and Remove project S <br />Harris County. Complete In place far <br />Traffic Handling and Control during <br />Construction Including Signs. Barrlcad <br />and Channelizing Devices. Complete i <br />WIlKe Relectorized Solid pavement M <br />Widths as per Plans. Complete In plar <br />TOTAL COST- <br /> <br />IS, <br />1 place <br />.rIIings <br />, <br />iECTiON 6 <br /> <br />$ <br /> <br />$ <br /> <br />1.418.78 <br />(.$1.418.77) <br />50,093.78 <br />{"S50,093.nl <br /> <br />$ <br /> <br />$ <br /> <br />962,215.63 <br /> <br />94,793.85 <br /> <br />$ <br /> <br />$ <br /> <br />20,891.70 <br />("$22,691.70) <br /> <br />$ <br /> <br />s <br /> <br />969,565.85 <br /> <br />43,045.85 <br /> <br />~F <br /> <br />LS <br /> <br />.891.7 <br /> <br />, <br />i <br /> <br />i <br /> <br />0.75 <br /> <br />46,500.00 <br /> <br />s <br /> <br />I <br /> <br />46,500.00 <br /> <br />$ <br />i <br /> <br />i <br /> <br />O.SO <br /> <br />92,000.00 <br /> <br />$. <br /> <br />$ <br /> <br />945.85 <br /> <br />92.000.00 <br /> <br />s <br />i <br /> <br />i <br /> <br />1.00 <br /> <br />UNIT BID <br />--'3.iiOO.OO <br />(*53,600.00) <br />10,000.00 <br /> <br />s <br /> <br />s <br />i <br /> <br />,891.70 <br /> <br />$ <br />S <br /> <br />$ <br /> <br />O.SO <br /> <br />40,000.00 <br /> <br />$ <br /> <br />$ <br /> <br />945.85 <br /> <br />40,000.00 <br /> <br />SE~TION 6 - TRAFFIC SIGNS AND TRAFFI-C MI <br />iTEM <br />NO. <br />Si <br /> <br />~ns, <br /> <br />UNIT <br />EACH <br /> <br />BID QUANT. <br />'3 <br /> <br />UNIT BID <br />ill.co <br /> <br />I <br /> <br />TOTAL BID <br />m5~bO <br /> <br />UNIT BID <br />616.00 <br /> <br />I <br /> <br />TOTAL BID <br />1.848,00 <br /> <br />UNIT BID <br />700.00 <br /> <br />I <br /> <br />TOT AL B~ <br />2.100.00 <br /> <br />~KERS <br /> <br />e <br /> <br />51 <br /> <br />50 <br /> <br />49 <br /> <br />SECTION 5 - PAVIN13 <br />iTEM <br />NO. <br />48 <br /> <br />DESCRiPTION <br />prime Coal, MC-3D <br />Complete in place lor <br />Tack Coal <br />Complete In place far <br />Milling Asphalt Concrete pavement, 2.i <br />,Complete In place lor <br />,6" Thick Reinforced Concrete Drivew8) <br />Complete in Place lor <br />TOTAL COST. ~ <br /> <br />r <br /> <br /> (5) (6) (7) (8) <br />- HUBCO INC. CONRAD CONSTRUCTION CO INC. WHITELAK INC. TEXAS-STERLlNG CONSTRUCTION <br /> UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAl BID UNIT BID TOTAL BID UNIT BIO TOTAl BID <br /> GAL 1.860 $ 0.01 $ 18.60 $ 1.09 $ 2,027.40 $ 1.00 $ 1,860.00 S 1.SO $ 2,790.00 <br />. GAL 310 $ 1.00 $ 310.00 $ 310.00 S <br /> 1.96 $ 607.60 S 1.00 $ 2.00 $ 620.00 <br />ch, Sy 4,092 $ 2.00 $ 8,184.00 S 2.81 $ 11,498.52 $ 2.00 $ 8.184.00 S 2.00 $ 8,184.00 <br />s, Sy 138 $ 49.00 S 6,762.00 $ 36.00 S 4,968.00 $ SO.OO $ 6.900.00 $ SO.OO $ 6,900.00 <br /> (.$60,210.561 <br />ECTlON 5 $ 59,649.60 $ 60,210.56 S 66,654.00 $ 69,791.00 <br /> . , <br /> <br />BID TABULATION FOR <br /> <br />SUNRISE DRIVE <br /> <br />(5) <br />HUBCO, INC. <br /> <br />FROM H.e.F.e.D. UNIT A104-10-40 to FAIRFIELD AVENUE <br /> <br />(6) <br />CONRAD CONSTRUCTiON CO, INC. <br /> <br />(7) <br />WHITELA~ INC. <br /> <br />I <br /> <br />(8) <br />TEXAS-STERLING CONSTRUCTiON <br />