<br />e
<br />
<br />. DENOTES ERROR IN BID DOCUMENT. CORRECTED AMOUN" SHOWN. INCORRECT AMOUNT SHOWN IN PARENTHESES,
<br />
<br />12
<br />13
<br />
<br />i4
<br />
<br />15
<br />
<br />16
<br />
<br />9
<br />
<br />SECTION 2 - UTILITY ADJUSTMENTS
<br />'iTEM
<br />NO.
<br />B
<br />
<br />11
<br />
<br />10
<br />
<br />
<br /> (9) (10) (11) (12)
<br /> WM. H. GRAY CONSTRUCTION CO INC. BEARDEN CONTRACTING CO. PATE & PATE ENTERPRISES INC. COLT UTILITIES INC.
<br /> UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID
<br />rLlne LF 36 $ 100.00 $ 3,600.00 $ 120.00 $ 4,320.00 $ 85.00 $ 3,060.00 $ 90,55 $ 3,259.80
<br />JI' Uk 74 $ SO.OO $ 3,700.00 $ 100.00 $ 7,400.00 $ 30.00 $ 2,220.00 $ 42.68 $ 3,158.32
<br />,
<br />ipe, LF 99 $ 1.00 $ 99.00 $ 10.00 $ 990.00 $ 7.00 $ 693.00 $ 3.97 $ 393.03
<br /> LF 21 $ 45.00 $ 945.00 $ SO.OO $ 1,050.00 $ 42.00 $ 882.00 $ 118.52 $ 2,488.92
<br /> LF 499 $ 80.00 $ 39,920.00 $ 55.00 $ 27,445.00 $ 63.00 $ 31,437.00 $ 76.73 $ 38,288.27
<br /> EACH 1 S 2,000.00 $ 2,000.00 S 1,200.00 S 1,200.00 S 1,435.00 S 1,435.00 S 3,969.16 S 3,969.16
<br /> EACH 1 S 500.00 $ 500.00 $ 400.00 $ 400.00 $ 150.00 $ lSO.00 $ 2.902.90 $ 2,902.90
<br />'tlr LF 18 $ 1.00 $ 18.00 $ 15,00 $ 270.00 $ 5.00 $ 90.00 $ 31.04 S 558.72
<br />Ir LF 499 $ 1.00 $ 499.00 $ 10.00 $ 4,990.00 $ 5.00 $ 2,495.00 $ 8.71 $ 4.346.29
<br /> I
<br />
<br />Page9 of
<br />
<br />16
<br />
<br />e
<br />
<br /> (9) (10) (11) (12)
<br /> WM. H. GRAY CONSTRUCTION CO INC. BEARDEN CONTRACTING CO. PATE & PATE ENTERPRISES INC. COLT UTILITIES INC.
<br />SECTION I. SITE PREPARATION AND EARTHWOR<
<br />ITEM
<br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BIO TOTAL BID UNIT BID TOTAL BID.
<br />1 Remove and Dispose of existing Concretl SY 146 $ 5.00 $ 730.00 $ 3,00 $ 438.00 $ 15.00 $ 2,190.00 $ 19.94 $ 2,911.24
<br /> Drlvewavs, ComDlete In Dlace
<br />2 Remove and Dispose of Existing Concreto SY .3,840 $ 3.00 $ 11,520.00 $ 2.00 $ 7,680.00 $ 4.00 $ 15,360.00 $ 5.02 $ 19,278.80
<br /> Roadway and BasejFor Storm Sewer Inst I
<br />3 Remove and Dispose of Existing Concreb LF 910 $ 6.00 $ 5,460.00 $ 2.00 $ 1,820.00 $ 8.00 $ 7,280.00 $ 14.29 $ 13,003.90
<br /> Pioe, All Sizes, ComDlete in DIece
<br />4 Remove and Dispose of Existing Concreh SY 44 $ 15.00 $ 660.00 $ 5.00 $ 220.00 $ 20.00 $ 880.00 $ 19.94 $ 8n.36
<br /> Slope Pavement, ComDlete In Dlace
<br />5 Remove and Relocate Existing Traflic ant LS 1 $ 300.00 $ 300.00 $ 1,500.00 $ 1,500.00 $ 1,100.00 $ 1,100.00 $ 1,500.00 $ 1,500.00
<br /> Roadway Signs, Including all Incidental III 'liS
<br />6 Regrade Roadside Dllches, LF 1,228 $ 8.00 $ 9,824.00 S 5.00 $ 6,140.00 $ 6.00 $ 7,368.00 $ 3.35 $ 4,113.80
<br /> Comolete In Place
<br />7 Well Pointing System., LF 1,000 $ 20.00 $ 20,000.00 $ 16.00 $ 16,000.00 $ 16.00 $ 16,000.00 $ 18.98 $ 18,980.00
<br /> ComDlete in Place for
<br /> TOTAL COST. SEI.TION 1 S 48,494.00 S 33,798.00 S 50,178.00 S 60,663.10
<br />
<br />SUNRISE DRIVE FROM H.e.F.e.D. UNIT A104-10~O to FAIRFIELD AVENUE
<br />
<br />BID TABULATION FOR
<br />
|