Laserfiche WebLink
<br />~.. <br />~ <br /> <br />(Q;..... 0" ~".. ~.. ... <br />.:::. ,. ,.:: ..:.' .:.0..:.....:.'. <br />e ,. ,.. ,';..... ,. <br />. . ." ." <br />. . .. . .. . <br />.. .. . . <br />. . <br />'. . ..' .,' . <br /> <br />CLAUNCH & MILLER, INC. <br />Engineering Consultants <br /> <br />ATTACHMENT "A" <br /> <br />January 7, 1999 <br /> <br />Mr. Steve Gillett <br />Director of Public Works <br />P.O. Box 1115 <br />La Porte, TX 77572-1115 <br /> <br />RE: Engineering Services for Waterline Improvements <br />on Antrim, Park Drive and Valley View and F101 Ditch Drive <br /> <br />Dear Mr. Gillett: <br /> <br />Claunch & Miller, Inc. (CM!) is pleased to submit this proposal for providing engineering services on <br />the above referenced project. <br /> <br />DESCRIPTION OF PROJECT <br /> <br />The project consists of waterline improvements in three (3) separate locations. <br /> <br />Antrim- This improvement includes the replacement of an existing 6" waterline with a new 8" <br />waterline along Antrim Street from Farrington Blvd. to Piney Brook Drive (approximately 1,000 <br />L.F.). This project also includes the replacement of all of the existing sidewalk on the north side <br />of Antrim for this segment. <br /> <br />Park Drive- This improvement involves the replacement of an existing 6" waterline with an 8" <br />waterline along park Drive from San Jacinto to Oak Grove (approximately 3000 L.F.). <br /> <br />Valley View & FIOl Ditch - This improvement involves the replacement of an existing 8" <br />waterline crossing Harris County Flood Control District FI01-00-00 at Valley View. This <br />involves replacing the line utilizing a bridge attachment across the planned cross section of the <br />F101 ditch. <br /> <br />The preliminary estimated construction cost for the improvements is $313,188.70. <br /> <br />Page lof6 <br />3701 Kirby Drive, Suite 860. Houston, Texas 77098. (713) 524-7113 <br />