Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />(:Gc..-~j";J <br />[, .. <br />--------- - <br />-, <br /> <br />SCOPE <br /> <br />The scope of engineering services is as follows: <br />Survey Services <br /> <br />. Provide survey services on each of the project sites suitable for design. <br /> <br />. Vertical elevation information on all three project sites will be based on an assumed <br />datum. <br /> <br />Geotechnical Service <br /> <br />. Provide a geotechnical report presenting an investigation of the soils at the Autrium and <br />Park Drive portions of the project. Geotechnical work will not be obtained at the other <br />location. <br /> <br />. The geotechnical report will provide usual and customary information on the existing <br />soil. It will include bedding and backfill recommendations, trench safety information. <br />The report will be based upon information obtained from one boring along Antrim and <br />two along Park Drive. Each boring will be approximately seven (7) feet deep. <br /> <br />PRELIMINARY ENGINEERING PHASE <br /> <br />. Research existing utilities in the project area. <br /> <br />. Determine a recommended alignment for the new waterline <br /> <br />. Determine construction method and/or scheduling to minimize disruption of water service to the <br />community . <br /> <br />. Take photographs of all sites including all driveways. <br /> <br />. Prepare estimated construction costs for the project. <br /> <br />. Develop a project schedule. <br /> <br />. Prepare a letter report presenting the findings, estimated costs, and schedules for the work. <br /> <br />DESIGN ENGINEERING PHASE <br /> <br />. Prepare detailed plan and profile drawings of the fmal design as presented in the preliminary <br />engineering report. These plans will be at a scale of 1" = 20' horizontal and 1" = 2' vertical. <br /> <br />Page 20f 6 <br />