Laserfiche WebLink
<br />RAN D ALL. 0 R T E R FIE L D ARC. T E C T S, INC. <br /> <br />1006 South Shore Drive <br />Clear Lake Shores, Texas 77565 <br /> <br />SEABREEZE PARK - BID TABULATION <br />October 1, 1998 <br /> <br />(281) 334-5535 <br />Fax: (281) 334-2933 <br /> <br />NOTE All <br /> <br />h <br /> <br />d d h <br /> <br />d <br /> <br />b'd <br /> <br />Se <br /> <br />be 8 1998 <br /> <br />contractors sown atten e t e man atory pre- 1 meettn~ on :ptem r '. <br /> Architect's Comex Co. Criscon Co. Trimble & D.T. Clear Lake <br /> Estimate Stephens Construction Const. <br />1. Site Preparation, $ 22,500 $25,000 No Bid $26,400 $31,000 No Bid <br />Excavation & Grading <br />2. Site Utilities $ 17,500 $15,000 $16,500 $25,000 <br />3. Concrete Paving, $ 75,000 $90,000 $79,000 $64,000 <br />Curbing & Walks <br />4. Electrical Service $ 7,000 $14,000 $11,500 $19,000 <br />5. Restroom/Pavilion $ 135,000 $143,000 $139,000 $141,900 <br />Payment & Performance $ 8,000 $7,200 $5,600 $5,500 <br />Bond <br />TOTAL BASE BID $ 265,000 $294,200 $278,000 $286,400 <br />Days <br />Alternate #1: <br />Deduct metal roofing and $(10,000) $(14,000) $(19,000) $(12,900) <br />flashing, install asphalt <br />composition roofing <br />shingles <br /> <br /> Architect's Firemen Patak & Moore & Steven Hill <br /> Estimate Const. Poole Moore Const. <br /> $ 22,500 $70,000 No Bid $26,975 $23,324 <br />1. Site Preparation, <br />Excavation & Gradin~ <br />2. Site Utilities $ 1 7,500 $12,000 $13,246 $21,000 <br />3. Concrete Paving, $ 75,000 $75,000 $61,400 $100,558 <br />Curbing & Walks <br />4. Electrical Service $ 7,000 $18,000 $11,000 $20,900 <br />5. Restroom/Pavilion $ 135,000 $165,000 $- $156,268 <br />Payment & Performance $ 8,000 $10,000 $6,010 $7,950 <br />Bond <br />TOTAL BASE BID $ 265,000 $350,000 $333,754 $330,000 <br />Days <br />Alternate #1: <br />Deduct metal roofing and $(10,000) $(13,000) $(6,200) <br />flashing, install asphalt <br />composition roofing <br />shin~les <br />