<br />RAN D ALL. 0 R T E R FIE L D ARC. T E C T S, INC.
<br />
<br />1006 South Shore Drive
<br />Clear Lake Shores, Texas 77565
<br />
<br />SEABREEZE PARK - BID TABULATION
<br />October 1, 1998
<br />
<br />(281) 334-5535
<br />Fax: (281) 334-2933
<br />
<br />NOTE All
<br />
<br />h
<br />
<br />d d h
<br />
<br />d
<br />
<br />b'd
<br />
<br />Se
<br />
<br />be 8 1998
<br />
<br />contractors sown atten e t e man atory pre- 1 meettn~ on :ptem r '.
<br /> Architect's Comex Co. Criscon Co. Trimble & D.T. Clear Lake
<br /> Estimate Stephens Construction Const.
<br />1. Site Preparation, $ 22,500 $25,000 No Bid $26,400 $31,000 No Bid
<br />Excavation & Grading
<br />2. Site Utilities $ 17,500 $15,000 $16,500 $25,000
<br />3. Concrete Paving, $ 75,000 $90,000 $79,000 $64,000
<br />Curbing & Walks
<br />4. Electrical Service $ 7,000 $14,000 $11,500 $19,000
<br />5. Restroom/Pavilion $ 135,000 $143,000 $139,000 $141,900
<br />Payment & Performance $ 8,000 $7,200 $5,600 $5,500
<br />Bond
<br />TOTAL BASE BID $ 265,000 $294,200 $278,000 $286,400
<br />Days
<br />Alternate #1:
<br />Deduct metal roofing and $(10,000) $(14,000) $(19,000) $(12,900)
<br />flashing, install asphalt
<br />composition roofing
<br />shingles
<br />
<br /> Architect's Firemen Patak & Moore & Steven Hill
<br /> Estimate Const. Poole Moore Const.
<br /> $ 22,500 $70,000 No Bid $26,975 $23,324
<br />1. Site Preparation,
<br />Excavation & Gradin~
<br />2. Site Utilities $ 1 7,500 $12,000 $13,246 $21,000
<br />3. Concrete Paving, $ 75,000 $75,000 $61,400 $100,558
<br />Curbing & Walks
<br />4. Electrical Service $ 7,000 $18,000 $11,000 $20,900
<br />5. Restroom/Pavilion $ 135,000 $165,000 $- $156,268
<br />Payment & Performance $ 8,000 $10,000 $6,010 $7,950
<br />Bond
<br />TOTAL BASE BID $ 265,000 $350,000 $333,754 $330,000
<br />Days
<br />Alternate #1:
<br />Deduct metal roofing and $(10,000) $(13,000) $(6,200)
<br />flashing, install asphalt
<br />composition roofing
<br />shin~les
<br />
|