Laserfiche WebLink
<br />RANDALL-'ORTERFIELD ARC1tTECTS, INC. <br /> <br />1006 South Shore Drive <br />Clear Lake Shores, Teus 77565 <br /> <br />(281) 334-5535 <br />Fax: (281) 334-2933 <br /> <br />October 5, 1998 <br /> <br />Mr. Doug Kneupper <br />City of laPorte <br />P.O. Box 1115 <br />laPorte, TX 77572 <br /> <br />Re: Seabreeze Park - Phase I <br /> <br />Dear Mr. Kneupper. <br /> <br />Please find enclosed a copy of the bid tabulation from six of the nine contractors of record for <br />the above referenced project. <br /> <br />The apparent low bidder is Trimble & Stephens in the amount of $278,000 for the base bid, <br />Architect's estimate of $265,000. Please note the deduct alternate #1 amount of $19,000 from <br />Trimble & Stephens which would bring the project within $4,000 or approximately 1 ~% over <br />the Architect's estimate. <br /> <br />We recommend the following items for consideration and approval: <br /> <br />1. Apparent low bidder is responsible and willing to enter into a contract for the amount as <br />bid. <br />2. Accept the deduct alternate for asphalt roof shingles in lieu of metal roofing. The contractor <br />claims the metal roof warranty will not be available for structures on the waterfront. <br /> <br />The Phase I project should be substantially complete in five (5) months. <br /> <br />Phase II, Corps permit and drawings, should be complete in four (4) months to allow one (1) <br />month for bidding and review. This schedule will allow Phase II to commence immediately <br />upon Phase I completion. <br /> <br />Sincerely, <br /> <br /> <br />~ <br /> <br />Robert A. (Bob) Randall - Architect <br /> <br />RAR/ cs <br /> <br />Enclosure <br />