Laserfiche WebLink
<br />...._..... 0/1"'':_ <br /> <br />. <br /> <br />e <br /> <br />Appendix C. Fiber Optic Cabling Installation <br />C.1 Delivery <br /> <br />. . <br /> <br />I: ; <br /> <br />1. All materials and equipment shall be installed at the various building sites after the IBM <br />Project Manager has received authorization by the District Project Manager. <br /> <br />2. During the time between delivery and acceptance, the District cannot be held liable for any <br />damages to or theft of any components. It is the responsibility of the contractor to obtain <br />insurance against loss, theft and damage. <br /> <br />C.2 General Installation and Configuration Requirements <br /> <br />. , <br /> <br />I. The IBM Project Manager shall coordinate with the District Project Manager an installation <br />schedule for the entire project. This process is to begin at the Project Initiati~n Meeting. I <br /> <br />. . <br />2. IBM will build and terminate to the closet locations approved by the District prior to ., <br />installation. Any changes to the on premise design requested by the District may affect the <br />construction schedule and/or costs. <br /> <br />3. Installation will be performed according to the Project Schedule. Any delays or issues will be <br />communicated by the IBM Project Manager through Status Reports. <br /> <br />4. IBM will install and test all materials (testing procedures are outlined in a following section). <br /> <br />S. All rubbish, debris, and dirt resulting from IBM's work shall be cleaned up as required, and <br />removed from the building. The premises shall at all times be kept in a clean, safe and <br />professional manner. <br /> <br />C.3 Technical Requirements <br />C.3.1 General Description of Fiber Optic Cabling <br /> <br />1. Upon completion of a non-disclosure agreement by the District, IBM will provide a <br />fiber optic cabling map for the fiber optic cable installation. <br /> <br />2. In the base proposal, twelve (12) single mode fibers are to be installed and terminated <br />between Baker Junior High and Lomax Elementary, Baker Junior High and College Park <br />Elementary, Baker Junior High and Jennie Reid Elementary, and Baker Junior High and <br />Rizzuto Elementary. Twenty-four (24) single mode fibers are.to be installed and <br />terminated between Baker Junior High and Lomax Junior High and Baker Junior High <br />and the Business Office. Twelve (12) single mode fibers are to be installed and <br />terminated between the Business Office and Bayshore Elementary, the Business Office <br />and the Maintenance Building, and the Business Office and Dewalt School. Twenty-four <br />(24) single mode and twenty-four (24) multimode fibers should be installed and <br />terminated between the High School and Business Office. Due to short distances <br /> <br />IBM Global Services & La Porte ISO <br /> <br />peA 01 September 30,1998 <br /> <br />Page IS of 32 <br />