My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1997-2196
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1997
>
O-1997-2196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:59 PM
Creation date
7/26/2006 7:48:57 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/8/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />e <br /> <br />TurnerCollie@Braden Inc. <br /> <br />September 4, 1997 <br />Mr, John Joerns <br />City of La Porte <br /> <br />Page 2 <br /> <br />5. A gravity sewer will be constructed along McCabe from existing L.S. 12 to the proposed <br />lift station facility, The existing lift station will be abandoned. <br /> <br />6. Existing L,S, 40 will be altered to allow redirection of flows to the new lift station <br />facility to be located on McCabe Street. <br /> <br />7, A force main will be installed to convey flows from L.S. 40 to the new lift station <br />facility, <br /> <br />The following scope of services describes the work required to perform the preliminary <br />engineering services in compliance with the above stated conditions, <br /> <br />SCOPE OF SERVICES <br /> <br />- ...-- <br /> <br />A preliminary engineering study will be performed which consists of the following services: <br /> <br />· Obtain and review plans of existing facilities as well as the "Comprehensive Wastewater <br />Collection and Treatment Plan" and previous studies performed for the Weems Estate, <br />· Investigate collection system improvement alternatives based on projected land use, flow <br />redirection, and phasing with regards to future growth. <br />· Develop recommendations for improvements to L.S. 6, its force main and downstream <br />discharge sewer. <br />· Recommend location and size of site for the proposed lift station on McCabe. <br />· Prepare a cost estimate for construction of the three alternatives investigated. <br />· Prepare a Preliminary Engineering Report containing discussion of the above described <br />tasks, cost estimates, conclusions and recommendations. Supporting data and exhibits <br />will be included in the report. <br /> <br />TIME OF COMPLETION <br /> <br />We understand time is of the essence on this project due to the City's current negotiations <br />with developers of an apartment project. The Preliminary Engineering Report will be <br />delivered to the City of La Porte within four weeks following receipt of authorization to <br />proceed. <br /> <br />~~.._. <br />
The URL can be used to link to this page
Your browser does not support the video tag.