My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2002-2602
LaPorte
>
.Ordinances
>
2000's
>
2002
>
O-2002-2602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:09 PM
Creation date
7/27/2006 8:11:26 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/9/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />EXHIBIT A <br /> <br />FURTHER DESCRIPTION OF Engineer BASIC SERVICES <br />AND RELATED MATTERS <br /> <br />This is an Exhibit attached to, made a part of and incorporated by.reference with the <br />Agreement made on nP.(".Amtu~r ~, ?OO? between The City of La Porte, Texas (OWNER) <br />and Huitt-Zollars, Inc. (ENGINEER) providing for professional services. <br /> <br />The Basic Services of Engineer as described in Section 1 of the Agreement are amended <br />or supplemented as indicated below and the time periods for the performance of certain <br />services as indicated in Section 4 of the Agreement are stipulated as indicated below. <br /> <br />2. Omitted <br /> <br />3. During the Design Development Phase Engineer shall: <br /> <br />a. Provide document sets to Owner as outlined in paragraph 1.3.5. <br /> <br />b. Attend up to one (1) meeting with City staff to discuss progress and <br />direction of the work. After the meeting Engineer shall circulate for <br />approval a set of minutes that outline the key topics discussed and <br />any decisions, directions, etc. agreed upon by Owner and Engineer. <br /> <br />The Design Development Phase Services will be completed and Contract Documents <br />and Engineer's opinion of costs submitted within twenty-one (21) days following written <br />authorization from Owner to Engineer to proceed with that phase of services. <br /> <br />4. During the Construction Documents Phase Engineer shall: <br /> <br />Prepare construction documents ready for bidding, including the following tasks: <br /> <br />a. Construction drawings will be prepared at appropriate scale and <br />include: <br /> <br />Cover Sheet/Area Maps <br />Site Plan with Profile <br />Detail Sheets <br /> <br />b. Concurrent with the development of design drawings, the Engineer <br />will develop contract documents and specifications. Final <br />
The URL can be used to link to this page
Your browser does not support the video tag.