My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2000-2425
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2000
>
O-2000-2425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:05 PM
Creation date
7/27/2006 10:21:19 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
8/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />Mr. Douglas K. Kneupper, P .E. <br />City of La Porte <br />June 5,2000 <br />Page 2 <br /> <br />The Scope of Services, Basis of Compensation, and Schedule of Work are outlined in <br />the following paragraphs: <br /> <br />SCOPE OF SERVICES <br /> <br />The scope of services can be divided into Preliminary Phase, Design Phase, Bidding <br />Phase, and Construction Phases. The scope of each phase and/or services is defined as follows: <br /> <br />BASIC SERVICES <br /> <br />Preliminary Phase <br /> <br />Prepare a letter report for review by City of La Porte and other governmental <br />entities. The report shall provide the areas to be served, basis of design, criteria <br />for design, points of interface, estimated costs, and other factors necessary for <br />review and comment by governmental agencies. <br /> <br />Design Phase <br /> <br />a. Prepare detailed drawings and specifications and provide two complete <br />sets to the city for review and comment. <br /> <br />b. Furnish copies of the construction drawings, where applicable, to <br />federal, state, county, and municipal agencies, pipeline companies, and <br />utility companies, and obtain all necessary approvals. <br /> <br />c. Prepare and deliver to the city detailed fmal estimate of probable <br />construction cost, construction drawings and project specifications for <br />final approval. <br /> <br />Bidding Phase <br /> <br />a. Assist the City in the prequalification of contractors. The <br />prequalification investigation is limited to the investigation of the <br />Contractor's statement of equipment and experience. <br /> <br />b. Assist the City in obtaining bids. <br />
The URL can be used to link to this page
Your browser does not support the video tag.