My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2000-2436
LaPorte
>
.Ordinances
>
2000's
>
2000
>
O-2000-2436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:05 PM
Creation date
7/27/2006 10:30:11 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />EXHIBIT B <br /> <br />A LISTING OF THE DUTIES, RESPONSIBILITIES AND <br />LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE. <br /> <br />This is an Exhibit attached to, made a part of and incorporated by <br />reference with the Agreement made on, September 25, 2000, between <br />The City of La Porte, Texas (OWNER) and Randall - Porterfield <br />Architects (ARCHITECT) providing for professional services. <br /> <br />OWNER may furnish a Resident Project Representative (RPR), <br />assistants and other field staff to assist ARCHITECT in observing <br />performance of the work of Contractor. <br />Through more extensive on-site observations of the work in <br />progress and field checks of materials and equipment by the RPR and <br />assistants, ARCHITECT shall endeavor to provide further protection <br />. for OWNER against defects and deficiencies in the work of <br />CONTRACTOR; but, the furnishing of such services will not make" <br />ARCHITECT responsible for or gi ve ARCHITECT control over <br />construction means, methods, techniques, sequences or procedures or <br />for safety precautions or programs, or responsibility for <br />CONTRACTOR's failure to perform the Work . in accordance with the <br />Contract Documents and in particular the specific limitations set <br />forth in paragraph 1.6 of the Agreement are applicable. <br />The duties and responsibilities of the RPR are limited to <br />those of ARCHITECT in ARCHITECT's agreement with the OWNER and in <br />t!he construction Contract Documents, and are further limited and <br />described as follows: <br /> <br />A. General <br /> <br />RPR is ARCHITECT's agent at the site, will act as directed by <br />and under the supervision of ARCHITECT, and will confer with <br />ARCHITECT regarding RPR' s actions. RPR' s dealings in matters <br />pertaining to the on-site work shall in general be with ARCHITECT <br />and CONTRACTOR keeping OWNER advised as necessary. RPR's dealings <br />with subcontractors shall only be through or with the full <br />knowledge and approval of CONTRACTOR. RPR shall generally <br />communicate with OWNER with the knowledge of and under the <br />direction of ARCHITECT. <br /> <br />B. Duties and Responsibilities of DR <br /> <br />1. Schedules: <br />Review the progress schedule, schedule of Shop <br />Drawing submittals and schedule of values prepared <br /> <br />B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.