My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2000-2436
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2000
>
O-2000-2436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:05 PM
Creation date
7/27/2006 10:30:11 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />documents. The Schematic Design Documents will include the <br />ARCHITECT I S opinion of probable costs for the proj ect, including <br />the following, which will be separately itemized: <br /> <br />Construction Cost(s) : <br />materials and equipment costs, <br />materials testing and equipment <br />costs, <br />allowances for laboratory testing, <br />appropriate contingencies, <br />and special instructions, <br /> <br />Allowance for Architectural/Engineering Cost(s): <br />estimated expenses for daily project <br />representation during construction, <br />appropriate contingencies, <br /> <br />and (if furnished by OWNER) allowances for such other items as <br />charges of other professionals and consultants, for the cost of <br />land and rights-of-way, for compensation for or damages to <br />properties, for interest and financing charges and for other <br />services to be provided by others for OWNER pursuant to paragraphs <br />3.7 through 3.11, inclusive. The total of all such costs, <br />allowances, etc. are hereinafter called "Total Project Costs". <br /> <br />The duties and responsibilities of ARCHITECT during the Schematic <br />Design Phase are amended and supplemented as indicated in paragraph <br />2; of Exhibit A "Further Descriptions of Basic Services and Related <br />Matters" . <br /> <br />1.3 Design Development Phase <br /> <br />After written authorization to proceed with the Design <br />Development Phase, ARCHITECT shall: <br /> <br />1.3.1In consultation with OWNER and based on the approved Schematic <br />Design documents and any adjustments authorized (in writing) by the <br />OWNER in the program schedule or construction budget, the ARCHITECT <br />shall determine the general scope, extent and character of the <br />Project. <br /> <br />1.3.2The ARCHITECT shall prepare Design Development documents <br />consisting of final design criteria, preliminary drawings, outline <br />specifications and written descriptions of the Project. <br /> <br />1.3.3Advise OWNER if additional data or services of the type <br />described in paragraph 3.4 are necessary and assist OWNER in <br /> <br />1 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.