Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Project Description <br /> <br />Projected <br />Cost <br /> <br />Powell Road <br />4 lane concrete roadway with curb and gutter and center median <br />Length of roadway: 7,700 linear feet <br />Lime stabilization: 41,100 sq. yds. <br />Concrete paving: 10" thick; 41,100 sq. yds. <br />Storm sewer: 3,850 linear feet <br />Curb and gutter: 30,800 linear feet <br /> <br />Powell Road South <br />2 lane concrete roadway with curb and gutter <br />Length of roadway: 2,200 linear feet <br />Lime stabilization: 8,800 sq. yds. <br />Concrete paving: 10" thick; 8,800 sq. yds. <br />Storm sewer: 1,100 linear feet <br />Curb and gutter: 4,400 linear feet <br /> <br />McCabe Road (east of'SHI46) <br />4 lane concrete roadway with curb and gutter <br />Length of roadway: 4,300 linear feet <br />Lime stabilization: 22,900 sq. yds. <br />Concrete paving: 10" thick; 22,900 sq. yds. <br />Storm sewer: 2,150 linear feet <br />Curb and gutter: 8,600 linear feet <br /> <br />McCabe Road (west of'SH146) <br />2 lane concrete roadway with curb and gutter <br />Length of roadway: 1,200 linear feet <br />Lime stabilization: 4,800 sq. yds. <br />Concrete paving: 10" thick; 4,800 sq. yds. <br />Storm sewer: 600 linear feet <br />Curb and gutter: 2,400 linear feet <br /> <br />San Jacinto Street from Main to Park <br />4 lane concrete roadway with curb and gutter <br />Length of roadway: 4,700 linear feet <br />Lime stabilization: 25,600 sq. yds. <br />Concrete paving: 10" thick; 25,600 sq. yds. <br />Storm sewer: 2,350 linear feet <br />Curb and gutter: 9,400 linear feet <br /> <br />Park Street from San Jacinto to Garfield <br />2 lane concrete roadway with curb and gutter <br />Length of roadway: 3,400 linear feet <br />Lime stabilization: 13,600 sq. yds. <br />Concrete paving: 7" thick; 13,600 sq. yds <br />Storm sewer: 1,700 linear feet <br />Curb and gutter: 6,800 linear feet <br /> <br />Bayshore Drive <br />2 lane concrete roadway with curb and gutter <br />Length of roadway: 3,600 linear feet <br />Lime stabilization: 13,600 sq. yds. <br />Concrete paving: 7" thick; 13,600 sq. yds. <br />Storm sewer: 1,700 linear feet <br />Curb and gutter: 6,800 linear feet <br /> <br />$ 3,000,000 <br /> <br />$ 1,170,000 <br /> <br />$ 2,200,000 <br /> <br />$ 605,000 <br /> <br />$ 2,400,000 <br /> <br />$ 1,700,000 <br /> <br />$ 1,700,000 <br /> <br />County <br />Participation <br /> <br />$1,000,000 <br /> <br />390,000 <br /> <br />733,000 <br /> <br />202,000 <br /> <br />800,000 <br /> <br />567,000 <br /> <br />567,000 <br />