Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Sens Road (26th Street) from Spencer Hw)'. To Avenue D $1,010,000 <br />5 lane concrete roadway with curb and gutter <br />Length of roadway: 2,000 linear feet <br />Lime stabilization: 13,350 sq. yds. <br />Concrete paving: 10" thick; 13,350 sq. yds. <br />Storm sewer: 1,000 linear feet <br />Curb and gutter: 4,000 linear feet <br /> <br />Broadway Street from McCabe Road to Main Street $1,960,250 <br />4 lane concrete roadway with curb and gutter and center median <br />Length of roadway: 8,000 linear feet <br />Lime stabilization: 42,700 sq. yds. <br />Concrete paving: 10" thick; 42, 700 sq. yds. <br />Storm sewer: 4,000 linear feet <br />Curb and gutter: 32,000 linear feet <br />Note: the cost estimate for Broadway only reflects contributions from <br />the TIRZ. Other agencies are anticipated to participate in this project. <br /> <br />Fairmont Parkway Overpass $ 4,250,000 <br />Construction ofa grade separation (overpass) of Fairmont Parkway <br />over Union Pacific Railroad right-of-way. Project contributions from <br />other agencies are anticipated. <br /> <br />Sylvan Beach Shoreline Protection $ 1,750,000 <br />Sylvan Beach Park has approximately 2,500 linear feet of shoreline. <br />Much of this shoreline is either unprotected or has an aged and failing <br />bulkhead. This project would provide new shoreline protection. <br /> <br />Sylvan Beach Park Entrance Improvements $ 500,000 <br />Improvements to roadway entrance to Sylvan Beach Park, landscaping, <br />marquee and signage, etc. <br /> <br />Sylvan Beach Park Facility Improvements $ 750,000 <br />Various improvements to Sylvan Beach Park. Proposed projects include <br />parking lot improvements, traffic circulation improvements, pedestrian walkways, <br />marina, boat launch improvements, gazebos. etc. <br /> <br />Buffer Walls $1,695,000 <br />Buffer walls along SH146, Weems Boulevard and Me Cabe Road to isolate <br />anticipated residential areas from these high traffic corridors. <br /> <br />Sidewalks $ 975,000 <br />Sidewalks for pedestrian movements are proposed along major roadways in <br />residential and business/commercial areas. <br /> <br />Drainage Projects $ 4,095,000 <br />Extension of Harris County Flood Control District facilities and <br />acquisition/construction of detention basin(s) necessary to provide efficient <br />drainage and flood protection for increased storm water runoff due to development <br />within the TlRZ. <br /> <br />337,000 <br /> <br />653,000 <br /> <br />1,417,000 <br /> <br />583,000 <br /> <br />167,000 <br /> <br />250,000 <br /> <br />565,000 <br /> <br />325,000 <br /> <br />1,365,000 <br /> <br />Zone Administration (over 30 year life of Zone) $ 324,000 108,000 <br />Zone Creation Costs $ 75.000 25.000 <br />Total Without Bond Financing $ 30,159,250 10,054,000 <br />Bond Financing Costs (Contingent upon issuance of Bonds) $ .16.285.512 5.429.000 <br />Total With Bond Financing $ 46,444.762 15.483,000 <br />