<br />Sens Road (26th Street) from Spencer Hw)'. To Avenue D $1,010,000
<br />5 lane concrete roadway with curb and gutter
<br />Length of roadway: 2,000 linear feet
<br />Lime stabilization: 13,350 sq. yds.
<br />Concrete paving: 10" thick; 13,350 sq. yds.
<br />Storm sewer: 1,000 linear feet
<br />Curb and gutter: 4,000 linear feet
<br />
<br />Broadway Street from McCabe Road to Main Street $1,960,250
<br />4 lane concrete roadway with curb and gutter and center median
<br />Length of roadway: 8,000 linear feet
<br />Lime stabilization: 42,700 sq. yds.
<br />Concrete paving: 10" thick; 42, 700 sq. yds.
<br />Storm sewer: 4,000 linear feet
<br />Curb and gutter: 32,000 linear feet
<br />Note: the cost estimate for Broadway only reflects contributions from
<br />the TIRZ. Other agencies are anticipated to participate in this project.
<br />
<br />Fairmont Parkway Overpass $ 4,250,000
<br />Construction ofa grade separation (overpass) of Fairmont Parkway
<br />over Union Pacific Railroad right-of-way. Project contributions from
<br />other agencies are anticipated.
<br />
<br />Sylvan Beach Shoreline Protection $ 1,750,000
<br />Sylvan Beach Park has approximately 2,500 linear feet of shoreline.
<br />Much of this shoreline is either unprotected or has an aged and failing
<br />bulkhead. This project would provide new shoreline protection.
<br />
<br />Sylvan Beach Park Entrance Improvements $ 500,000
<br />Improvements to roadway entrance to Sylvan Beach Park, landscaping,
<br />marquee and signage, etc.
<br />
<br />Sylvan Beach Park Facility Improvements $ 750,000
<br />Various improvements to Sylvan Beach Park. Proposed projects include
<br />parking lot improvements, traffic circulation improvements, pedestrian walkways,
<br />marina, boat launch improvements, gazebos. etc.
<br />
<br />Buffer Walls $1,695,000
<br />Buffer walls along SH146, Weems Boulevard and Me Cabe Road to isolate
<br />anticipated residential areas from these high traffic corridors.
<br />
<br />Sidewalks $ 975,000
<br />Sidewalks for pedestrian movements are proposed along major roadways in
<br />residential and business/commercial areas.
<br />
<br />Drainage Projects $ 4,095,000
<br />Extension of Harris County Flood Control District facilities and
<br />acquisition/construction of detention basin(s) necessary to provide efficient
<br />drainage and flood protection for increased storm water runoff due to development
<br />within the TlRZ.
<br />
<br />337,000
<br />
<br />653,000
<br />
<br />1,417,000
<br />
<br />583,000
<br />
<br />167,000
<br />
<br />250,000
<br />
<br />565,000
<br />
<br />325,000
<br />
<br />1,365,000
<br />
<br />Zone Administration (over 30 year life of Zone) $ 324,000 108,000
<br />Zone Creation Costs $ 75.000 25.000
<br />Total Without Bond Financing $ 30,159,250 10,054,000
<br />Bond Financing Costs (Contingent upon issuance of Bonds) $ .16.285.512 5.429.000
<br />Total With Bond Financing $ 46,444.762 15.483,000