My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2001-2474
LaPorte
>
.Ordinances
>
2000's
>
2001
>
O-2001-2474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:06 PM
Creation date
7/27/2006 11:02:30 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/19/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />5.7 Wastewater Discharge Permit Reissue <br /> <br />All industrial users shall apply for a wastewater discharge permit reissue by <br />submitting a complete wastewater discharge permit application, thirty ( 30 ) days <br />prior to the expiration of the industrial user's existing wastewater discharge <br />permit in accordance with Section 4,6 of this ordinance, <br /> <br />SECTION 6 REPORTING REQUIREMENTS <br /> <br />6,1 Baseline Monitoring Reports <br /> <br />A. Within 180 days after the effective date a categorical pretreatment <br />standard, or final administrative decision on a category determination <br />under 40 CFR 403.6 (a)(4), whichever is later, existing significant <br />industrial users subject to such categorical pretreatment standards, and <br />currently discharging to or scheduled to discharge to the POTW, shall be <br />required to submit to the City a report which contains the information <br />listed in paragraph B, below. Ninety ( 90 ) days prior to commencement <br />of a discharge, new sources, the industrial user shall be required to submit <br />to the City a report which contains the information in paragraph B, below. <br />A new source shall also be required to report the method of pretreatment it <br />intends to use to meet applicable pretreatment standards, A new source <br />shall also give estimates of its anticipated flow and quantity of pollutants <br />discharged, <br /> <br />B, The industrial user shall submit the information required by this section <br />including: <br /> <br />1. Identifying Information. The name and address of the facility <br />including the name of the operator and owners. <br /> <br />2, Wastewater Discharge Permits, A list of any environmental <br />control wastewater discharge permits held by the facility, <br /> <br />3. Description of Operation, A brief description of the nature, <br />average rate of production, and standard industrial classifications <br />of the operation(s) carried out by such industrial user, This <br />description should include a schematic process diagram which <br />indicates points of discharge to the POTW from the regulated <br />processes, <br /> <br />4. Flow Measurements, Information showing the measured average <br />daily and maximum daily flow, in gallons per day, to the POTW <br />from regulated process streams and other streams, as necessary, to <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.