My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2001-2474
LaPorte
>
.Ordinances
>
2000's
>
2001
>
O-2001-2474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:06 PM
Creation date
7/27/2006 11:02:30 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/19/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />allow use of the combined waste stream formula set out in 40 CFR <br />403,6 (e), <br /> <br />5. Measurement of Pollutants. <br /> <br />a, Identify the categorical pretreatment standards applicable to <br />each regulated process, <br /> <br />b. Submit the results of sampling and analysis identifying the <br />nature and concentration (and / or mass, where required by <br />the standard or by the City) of regulated pollutants in the <br />discharge form each regulated process. Instantaneous, <br />daily maximum and long term average concentrations (or <br />mass, where required) shall be reported, The sample shall <br />be representative of daily operations and shall be analyzed <br />in accordance with sample procedures set out in Section <br />6.10, <br /> <br />c. Sampling must be performed In accordance with <br />procedures set out in Section 6.11, <br /> <br />6, Certification, A statement reviewed by the industrial user's <br />authorized representative and certified by the qualified professions, <br />indicating whether pretreatment standards are being met on a <br />consistent basis and, if not, whether additional operation and <br />maintenance ( 0 & M ) and/or additional pretreatment is required <br />to meet the pretreatment standards and requirements. <br /> <br />7, <br /> <br />Compliance Schedule, If additional pretreatment and/or O&M will <br />be required to meet the pretreatment standardsj the shortest <br />schedule by which the industrial user will provide such additional <br />pretreatment and/or O&M, The completion of this schedule shall <br />not be later than the compliance date established for the applicable <br />pretreatment standard, A compliance schedule pursuant to this <br />section must meet the requirements set out in Section 6,2 (n) of <br />this ordinance, <br /> <br />.~ <br />I <br />l <br />1 <br /> <br />8, All Baseline Monitoring Reports must be signed and certified in <br />accordance with Section 4,6, <br /> <br />6,2 Compliance Schedule Progress Report <br /> <br />The following condition shall apply to the schedule required by 6.1 (b7) of this <br />ordinance, The schedule shall contain progress increments in the form of dates <br />for the commencement and completion of major events leading to the <br />construction and operation of additional pretreatment required for the user to meet <br />the applicable pretreatment standards (such events include hiring an engineer, <br /> <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.