Laserfiche WebLink
<br />~ <br />~ <br /> <br />- .. <br />e .. <br />CLAUNCH & MILLER, INC. <br />Engineering Consultants <br /> <br />April 11, 2001 <br /> <br />Mr. Steve Gillette <br />Director of Public Works <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, Texas 77572-1115 <br /> <br />Re: Engineering Services for Waterline Improvements <br />on Piney Brook Drive, Belfast Road and Catlett Lane <br />CM! Job No. 00-058 <br /> <br />Dear Mr. Gillette: <br /> <br />On April 10, 2001 bids were received on the above referenced project at the City Hall of La <br />Porte at 2:00 p.m. Bids were opened and read in public. Three (3) bids were received on th~ <br />proj ect. ' <br /> <br />All bids were tabulated and reviewed. The following is a summary of our bid evaluation: <br />Bidder Bid Amount <br />Lowest: JRC Construction . $212,649.00 <br />Second: Triple B Construction $228,563.00 <br />Third: ' Troy Construction $383,174.00 <br /> <br />The difference between the low bidder and the second low bidder was $15,914.00. A copy ofthe <br />bid tabulation is attached. <br /> <br />JRe Construction has successfully completed projects for Claunch & Millet, Inc. previously. <br />.Therefore, JRC COQ.struction appears to Qe a responsible firm that is capable of performing the <br />specified work in a satisfactory manner. For this reason, we recommend that the City of La <br />Porte award the Waterline Improvements Project to JRC Construction for the amount of <br />$212,649.00. <br /> <br />Sincerely, <br /> <br />CLAUNCH & MILLER, INC. <br /> <br />~ z. ~II?Z. <br /> <br />({ames E. Thompson, P.E. <br />Senior Project Manager <br /> <br />3701 Kirby Drive, Suite 860 · Houston, Texas 77098. (713) 524-7113 <br />