<br />PINEY BROOK DRIVE, BELFAST ROAD AND CATLETT LANE AT BIG ISLAND SLOUGH WATERLINE REPLACEMENT PROJECT
<br />
<br />CITY OF LA PORTE
<br />
<br />CMI Job No. 00-058
<br />
<br />LOW BIDDER
<br />
<br />TOTAl
<br />AMOUNT
<br />TROY CONSTRUCTION
<br />
<br />r
<br />
<br />UNIT
<br />PRICE,
<br />
<br />TOTAl
<br />AMOUNT
<br />
<br />I
<br />
<br />TRIPLE B SERVICES
<br />
<br />UNIT
<br />PRICE
<br />
<br />TOTAl
<br />AMOUNT
<br />
<br />I
<br />
<br />JRC CONSTRUCTION
<br />
<br />UNIT
<br />PRICE
<br />
<br />r UNIT TaUAN,
<br />
<br />ITEM DESCRIPTION
<br />
<br />e
<br />
<br />$144,433,00
<br />$!3~
<br />$ ,692,00
<br />
<br />$19,907.00
<br />$4,85O.00i
<br />$3,306,00
<br />$5,820,00
<br />$2,670,00
<br />$2,430,00
<br />$6,240,00
<br />$360,00
<br />$960,00
<br />$4,488,00
<br />$20,160,00
<br />$2,850,00
<br />$38,558,00
<br />$3,160,ooi
<br />$ I
<br />81,601,001
<br />$357,239.001
<br />
<br />$48,50
<br />$46,00
<br />$47.00
<br />$19,907,00
<br />$970,00
<br />$1,102,00
<br />$2,910,00
<br />$2,670,00
<br />$2,430,00
<br />$1,560,00
<br />$360,00
<br />$120,00
<br />$1,122.00
<br />$480,00
<br />$570.00
<br />$6,50
<br />$1,00
<br />$6,50
<br />
<br />$58,071,00
<br />$11,960,00
<br />$342,00
<br />$9,000.00
<br />$2,750,00
<br />$1,125,00
<br />$5,500,00
<br />$2,250,00
<br />$2,000,00
<br />$4,800,00
<br />$225.00
<br />
<br />$1,200,00
<br />$1,600,00
<br />$14,700,00
<br />$500,00
<br />
<br />$29,660,00
<br />$6,320,00
<br />
<br />$19.50
<br />$40.00
<br />~
<br />$9,000,00
<br />$550,00
<br />~
<br />$2,750,00
<br />$2,250,00
<br />$2,000,00
<br />$1,200,00
<br />$225,00
<br />$150,00
<br />$400.00
<br />
<br />$350,00
<br />$100,00
<br />$5,00
<br />$2,00
<br />$5,00
<br />
<br />$59,113,30
<br />$10~
<br />$450,00
<br />
<br />$27,085,00
<br />$2,205,00
<br />$966,00
<br />$3,706,00
<br />$1,635,00
<br />$1,308,00
<br />$4,784,00
<br />
<br />$70,00
<br />$1,120,00
<br />$2,616,00
<br />$12,726.00
<br />$255,00
<br />
<br />$22,126.36
<br />$6,320,00
<br />$43,436,84
<br />$200,238.00
<br />
<br />$19,85
<br />$34,50
<br />$12,50
<br />$27,085,00
<br />~
<br />$322,00
<br />$1,853,00
<br />$1,635,00
<br />$1,308,00
<br />$1,196,00
<br />$70,00
<br />$140,00
<br />$654,00
<br />
<br />$303,00
<br />$51,00
<br />$3,73
<br />$2.00
<br />$3,46
<br />
<br />2,978
<br />299
<br />38
<br />
<br />1
<br />5
<br />3
<br />2
<br />1
<br />1
<br />4
<br />1
<br />8
<br />4
<br />42
<br />5
<br />
<br />~
<br />3160
<br />12554
<br />
<br />L,F,
<br />!:L
<br />L.F.
<br />~
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />S,F"
<br />L.F.
<br />S,F,
<br />
<br />BASE UNIT PRICES
<br />Install 8. PVC Co9oo Walerline in open cut
<br />Install 8" PVC Co900 Walerline in auger hole
<br />Install.6' PVC Co900 Waterline in open cut
<br />8' PVC C-9oo waterline ditch crossing within H,C,F,C,D, right of way
<br />8' gate valve and box, all depths
<br />6' gate valve and box
<br />1 Z" X 8" Tapping sleeve and valve
<br />8' X 8' Tapping sleeve and valve
<br />6' X 6" Tapping sleeve and valve
<br />New fire hydrant
<br />Remove ellisting fire hydrant
<br />Remove valve box and bury
<br />8' connection
<br />Service reconnection all sizes, long and short
<br />6' cut and plug
<br />4' concrete driveway removal and replacement
<br />Trench safely system
<br />New sidewalk, includes removal of exislill!l sidewalk
<br />
<br />-
<br />
<br />$5,000,00
<br />$2,000,00
<br />$900,00
<br />
<br />$3,250,00
<br />$3,250,00
<br />$325,00
<br />$1,560,00
<br />$2,400,00
<br />~
<br />$2,000,00
<br />~
<br />$1,250,00
<br />$25,935.00
<br />
<br />$50,00
<br />$1,000,00
<br />$45,00
<br />~
<br />$6,50
<br />.$6,50
<br />$1,560,00
<br />$480,00
<br />$1,000,00
<br />$1,~
<br />~
<br />$25,00
<br />
<br />$62,770,00
<br />$214,773.00
<br />
<br />$1,950.00
<br />$200,00
<br />$190,00
<br />$2,500,00
<br />$2,500,00
<br />~
<br />$1,200,00
<br />$1,750,00
<br />$750,00
<br />$1,100,00
<br />~
<br />$1,000,00
<br />$13,790.00
<br />
<br />$19,50
<br />~
<br />$9,50
<br />$5,00
<br />$5,00
<br />~
<br />$1,200,00
<br />$350,00
<br />$375,00
<br />$550,00
<br />
<br />$1,985,00
<br />$100,00
<br />$250.00
<br />$1,750,00
<br />$1,865,00
<br />$150,00
<br />$1,196,00
<br />$1,515,00
<br />$644,00
<br />$882,00
<br />
<br />$19,85
<br />$50,00
<br />$12,50
<br />$3,50
<br />$3,73
<br />$3,00
<br />
<br />$1,196,00
<br />$303,00
<br />$322,00
<br />$441,00
<br />$10,74
<br />$20,00
<br />
<br />100
<br />2
<br />20
<br />500
<br />5!!Q.
<br />50
<br />
<br />1
<br />5
<br />2
<br />2
<br />1!!2
<br />50
<br />
<br />L.F,
<br />EACH
<br />...!:.!:....
<br />S.F.
<br />~
<br />S.Y,
<br />EACH
<br />EACH
<br />EACH
<br />EACH
<br />L.F,
<br />C,Y,
<br />
<br />TOTAL BASE BID:
<br />
<br />SUPPLEMENTAL ITEMS
<br />Extra 8' PVC C-9oo waterline in open cut
<br />Extra cut and plug existing waler mains
<br />Extra 6' PVC C-9OO waterline In open cut
<br />Extra removal and replacement of sidewalk without 1 Z" earthwork compaction
<br />Extra removal and replacement of 4' concrete driveways
<br />Extra block sodding
<br />Extra fire hydrants
<br />Extra service connections, all sizes
<br />Extra 6' gate valve and box, all depths
<br />Extra 8" gate valve and box
<br />6' curb on existing pavement, including reinforcing
<br />Select backfill. includillQ comoaction
<br />
<br />$5,00
<br />$20,00
<br />
<br />$1,074,00
<br />$1,000,00
<br />$12,411.00
<br />
<br />OF
<br />
<br />$383,174.00
<br />
<br />Page
<br />
<br />$228,563.00
<br />
<br />$212,649.00
<br />
<br />TOTAl SUPPLEMENTAl ITEMS:
<br />
<br />TOTAL BID:
<br />
<br />4/10/01
<br />
<br />Bid Date:
<br />
|