My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2001-2516
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2001
>
O-2001-2516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:07 PM
Creation date
7/27/2006 11:33:26 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/10/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />Phase II: Detailed Desitm. FCC Licensine:. RFPs. and Vendor{s) Selection <br /> <br />The focus of Phase IT is to refine the selected 'conceptual system approach, develop detailed <br />specifications and Request for Proposals (more than one may be required), evaluate vendor <br />responses and select the best system(s) for City of La :J;lorte. <br /> <br />The detailed system design would be incorporated into each Request for Proposals. The RFP's <br />would be the basis upon which each proposal would be judged. Each vendor should be required <br />to respond to all sections of the RFP and include, where applicable, which features are optional <br />and at what cost. In addition, vendors should be required to submit the cost data separately to <br />enable the project team to evaluate technical responsiveness apart from costs. This approach <br />assures objectivity during the vendor evaluation. <br /> <br />The RFPs would address specific technical and procedural areas, as well as support areas such as <br />training and maintenance. These areas include: <br /> <br />· RFP Response Procedures <br />· System Functional and Operational Requirements <br />· System Design and Performance <br />· Equipment Design and Performance <br />· Optional Equipment <br />· Maintenance Options and Local Support <br />· SystemN endor Information and Qualifications <br />· Installation Requirements <br />· Training Requirements <br /> <br />~ Task 1 - Project Initiation and Team Orienta~on <br /> <br />· Review Phase n scope, objectives, plans, and requirements with the appropriate <br />team members <br /> <br />· Prepare detailed plans, calendar, and milestones including: <br /> <br />Completing list of tasks, timetables, deliverables, and meeting schedules. <br /> <br />Progress meetings proposed on an approximate monthly basis, in addition to <br />regular contact with City of La Porte personnel ' <br /> <br />.:. Deliverable consists of a Phase IT work plan <br /> <br />City of La Porte, TX <br /> <br />Proposal- 2/23/01 <br /> <br />Section 2, Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.