My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2001-2531
LaPorte
>
.Ordinances
>
2000's
>
2001
>
O-2001-2531
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:07 PM
Creation date
7/27/2006 11:55:19 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/10/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />It <br />WALSH SURVEYING, INC. <br />PROFESSIONAL LAND SURVEYORS <br /> <br />e <br /> <br />WILLIAM C. WALSH, P.E., R.P.L.S. <br />President <br />2006 Broadway, P.O. Box 760 <br />PEARLAND, TEXAS 77588-0760 <br />281/485-3991 FAX 281/485-3998 <br /> <br />November 30, 2001 <br /> <br />Mr. Mehran Bavarian, P.E. <br />Walsh/Freese-Nichols, Inc. <br />2010 East Broadway <br />Pearland, Texas 77581 <br /> <br />Re: Canada Road, LaPorte, Texas <br /> <br />Dear Mr. Bavarian, <br /> <br />This letter is our proposal to provide surveying services to facilitate your ~esign of <br />Canada Road from Fairmont Parkway to Spencer Highway in the City of LaPorte, Texas. <br />The route is approximately 5,000 L.F. long and will include 'H' Street (approx. 800 L.F.). <br />Based on our discussion and a visit to the site we understand the scope of services to <br />be as follows: <br /> <br />Phase One: Topographic Survey <br /> <br />1. Establish a minimum of four (4) temporary benchmarks (TBM's) along the route <br />based on current City of laPorte vertical control. <br />2. Establish a control line for the entire length of the project. This line will be <br />monumented for future use by the contractor during the construdion phase. <br />3. Locate all planimetric features within the existing right-of-way. This will include, but <br />not be limited to all pavement, power poles, fire hydrants, meters, valves, culverts, <br />fences, signs, manholes, etc. <br />4. Establish elevations at the 100-foot stations that will extend from right-of-way to right- <br />of-way plus 25-feet on each side. For the portion of the project where the H.C.F.C.D. <br />ditch is adjacent to Canada Street the cross-sedions will extend to the east side of <br />the ditch right:-of-way. <br />5. Establish the rim elevation and flowline elevations of all sanitary sewer and storm <br />sewer manholes within the right-of-way. <br />6. Provide Walsh/Freese-Nichols, Inc. with the electronic data files of all of the survey <br />information gathered. <br /> <br />The cost to provide the outlined services will not exceed $15,000.00. Adual invoicing will <br />be based on the hourly rates in effect for the year that the projed is authorized. The <br />survey can be completed within twenty (20) working days following written authorization <br />to proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.