Laserfiche WebLink
<br />e <br /> <br />. <br /> <br />will be in the form of addenda issued after the conference. Attend the tour of the <br />project site after the pre-bid conference (if required). <br /> <br />r <br /> <br />5. Assist the OWNER in the opening, tabulating, and analyzing the bids received. <br />Recommend award of contracts or other actions as appropriate to be taken by OWNER. <br /> <br />6. Assist the OWNER in the preparation of Construction Contract Documents for <br />construction contract. Provide five (5) sets of Construction Contract Documents <br />which include information from selected contractor's bid documents, legal documents, <br />and addenda bound in the documents for execution by the OWNER and construction <br />contractor. Distribute two (2) copies of these documents to the contractor with a <br />notice of award that includes directions for the execution of these documents by the <br />construction contractor. Provide the OWNER two (2) copies of these documents for <br />use during construction. One (1) copy of these documents will be used by WFN during <br />construction. Additional sets of documents can be provided as an additional service. <br /> <br />7. Furnish contractor copies of the drawings and specifications for construction pursuant <br />to the General Conditions of the Construction Contract. <br /> <br />b. CONSTRUCTION SERVICES: <br /> <br />Upon completion of the bid or negotiation phas.e services, upon authorization by OWNER, <br />WFN will proceed with the performance of construction phase services as described below. <br />WFN will endeavor to protect OWNER in providing these services. However, it is <br />understood that WFN does not guarantee the Contractor's performance, nor is WFN <br />responsible for supervision of the Contractor's operation and employees. WFN shall not be <br />responsible for the means, methods, techniques, sequences or procedures of construction <br />selected by the Contractor, or any safety precautions and programs relating in any way to <br />the condition of the premises, the work of the Contractor or any Subcontractor. WFN shall <br />not be responsible for the acts or omissions of any person (except its own employees or <br />agents) at the Project site or otherwise performing any ofthe work of the Project. <br /> <br />These services are based on the use of WFN standard General Conditions for construction <br />pr.ojects. Modifications to these services required by use of other general conditions or <br />contract administration procedures is an additional service. If general conditions other than <br />WFN standards are used, the OWNER agrees to include provisions in the construction <br />contract documents that will require the construction contractor to include WFN and their <br />subconsultants on this project to be listed as an additional insured on contractor's insurance <br />policies. <br /> <br />1. Assist OWNER in conducting pre-construction conference(s) with the Contractor(s), <br />review construction schedules prepared by the Contractor(s) pursuant to the <br />requirements of the construction contract, and prepare a form for the purpose of <br />monthly pay estimates of the Project from information provided by the Construction <br />Contractor. <br /> <br />2. Establish communication procedures with the OWNER and contractor. <br /> <br />3. Establish and maintain a project documentation system consistent with the <br />requirements of the construction contract documents. Monitor the processing of <br /> <br />T: LAP2\Scope of ScrYicculoc <br /> <br />SC-3 <br /> <br />WFN ~.# <br />OWNER_ <br />