Laserfiche WebLink
<br />refer to notes, <br />39 <br /> <br />refer <br />18 <br /> <br />Letter superscripts <br /> <br />to notes, <br /> <br />page 47. <br /> <br />., L__ <br />.J 1110. <br /> <br />. <br /> <br />e <br /> <br />· Nonbearing. <br /> <br />One side sheathed with 1 in. magnesium oxysulphate <br />wood fiberboard attached to studs, 1 in. air space and <br />3~ in. brick secured with metal ties to studs every <br />fifth course. Other side faced with ~ in. gypsum- <br />vermiculite plaster on metal lath secured directly to <br />studs. (9) <br /> <br />Letter superscripts <br /> <br />page 47. <br /> <br />2 hrs. <br /> <br />3 hn. <br /> <br />3 hrs. <br /> <br />'l <br />,~ <br />: <br /> <br />Steel Stud <br />Brick- <br />Veneered <br />Wallsz <br /> <br />One side sheathed with paper-backed wire lath and <br />3~ in. brick veneer secured by filling 1 in. space <br />between brick and lath with mortar. Other side faced <br />with 1 in. paper-enclosed mineral-wool blanket weigh- <br />ing 0.6 lb. per sq. ft. attached to studs j metal lath <br />laid over blanket and attached to studs, covered with <br />~ in. 1 :2, 1:3 gypsum and sand plaster. (9).........,....,. <br /> <br />One side with ~ in. gypsum sheathing nailed to 2 5/16 <br />in. studs, and 3~ in. brick veneer secured with metal <br />ties to studs every fifth course. Other side ~ in. <br />1:2 gypsum and sand plaster on ~ in. perforated <br />gypsum lath. (78) ",.""'......,..,.,,,,'...,.. <br /> <br />2 hrs. <br /> <br />4 hrs. <br /> <br />3 hrs. <br /> <br />2 in. total thiclmess of ~ in. 1 :1, 1:2 gypsum and sand <br />plaster each side ~ in. gypsum lath inserted at top <br />and bottom in steel runners. (41 ) <br /> <br />1 <br /> <br />hr.. <br /> <br />in. total thickness of 13/16 in. I, 1:2 gypsum and <br />sand plaster each side ~ in. gypsum lath inserted at <br />top and bottom in steel runners. (37) <br /> <br />hr.. <br /> <br />3 hrs. <br /> <br />. <br /> <br />. <br /> <br />2 <br /> <br />2 in. total thickness consisting of ~ in. U.L. listed <br />gypsum lath, faced on both sides with ~ in. 1:1 <br />gypsum and sand plaster. Lath set into steel channels <br />at floor, ceiling and abutting walls, as specified in <br />U.L. listingc under Walls and Partitions-Design <br />No. 4-1 HR <br /> <br />1 <br /> <br />hr.. <br /> <br />Steel <br />Joists <br />(Fabricated <br />from Rolled <br />Sections or <br />from Strip <br />or Sheet <br />Steel) or <br />Steel <br />Beamsu <br /> <br />2~ in. concrete slabY on metal lath, or 2 in. reinforced <br />gypsum slabs covered with ~ in. mortar, on joists. <br />Ceiling of 1 in. gypsum-vermiculite plaster propor- <br />tioned within the range of 3~ to 5~ cu. ft. vermiculite <br />per 100 lb. gypsum, on metal lath. (9) ......'....".............., <br /> <br />2 in. concrete slaby on metal lath, or 2 in. precast <br />reinforced portland cement concrete or gypsum slabs, <br />on joists, the precast slabs to be finished with top <br />coating of ~ in. mortar. Ceiling of 2 in. reinforced <br />gypsum tile anchored to joists with metal ties and <br />covered with ~ in. 1:3 gypsum and sand plaster. (9) <br /> <br />2 in concrete slabY on metal lath. Ceiling of 1 in. <br />gypsum-perlite plaster on ~ in. perforated gyp- <br />sum lath attached to ~ in. furring channels spaced <br />12 in. on centers with interlocking wire clips giving <br />continuous support to lath. Plaster reinforced with <br />20 ga. wire mesh. Wire mesh attached to furring <br />channels at joints in lath. Plaster mix: scratch coat <br />2 cu. ft. and brown coat 3 cu. ft. perlite to 100 Ibs. <br />gypsum. (65) <br /> <br />4 hrs. <br /> <br />2 in. total thickness of 1 :2 gypsum and sand plaster, ap- <br />plied equally each side of metal lath attached top and <br />bo~tom to steel runners. (67) <br /> <br />1 <br /> <br />hr.. <br /> <br />4 hrs. <br /> <br />2 in. total thickness consisting of ~ in. gypsum lath, <br />faced on both sides with ~ in. gypsum and sand <br />plaster. Top of lath attached to steel ceiling runner, <br />and bottom engaged in groove of a wooden floor <br />runner impregnated with fire retardant chemicals. <br />Plaster mix for scratch coat 1:1 and brown coat 1:2 <br />gypsum and sand. (54) <br /> <br />1 <br /> <br />hr.. <br /> <br />2 in. total thickness consisting of ~ in. gypsum lath, <br />faced on both sides with ~ in. gypsum-,perlite plaster. <br />Scratch coat 2 cu. ft. and brown coat 3 cu. ft. of <br />perlite to 100 Ibs. gypsum. (63) <br /> <br />1~ hrs.. <br /> <br />4 hrs. <br /> <br />Solid <br />Plaster <br />Partitions <br />(Without <br />steel <br />framing) <br /> <br />2~ in. total thickness consisting of ~ in. gypsum lath, <br />faced on both sides with 1 in. gypsum-vermiculite <br />plaster. Scratch coat 2 cu. ft. and brown coat 3 cu. ft. <br />vermiculite to 100 Ibs. fibered gypsum. (79) ................ <br /> <br />2 <br /> <br />hrs.. <br /> <br />.' <br /> <br />Type <br /> <br />DetaU. of Construction <br /> <br />Rating <br /> <br />Type <br /> <br />Details <br /> <br />of <br /> <br />Construction <br /> <br />Rating <br /> <br />Fire Resistance <br /> <br />Ratings <br /> <br />Based on Standard Fire Tests <br /> <br />. <br /> <br />,~ <br /> <br />.' <br /> <br />Fire <br /> <br />WALLS <br />Resistance <br /> <br />Ratings <br /> <br />Based on Standard Fire <br /> <br />Tests <br /> <br />FLOOR AND CEILING CONSTRUCTIONS-Continued <br /> <br />FIRE <br /> <br />- <br /> <br />RESISTANCE <br /> <br />RATINGS <br /> <br />2 in. concrete floor slabY on metal lath, or 2~ in. re- <br />inforced portland cement concrete plank with joints <br />thoroughly grouted, on joists. Ceiling of 1 in. gypsum- <br />vermiculite plaster (measured from face of lath) O!l <br />metal lath. Plaster mix: 4:1 by weight or approx. <br />100 Ibs, fibered gypsum to 2~ cu. ft. vermiculite. <br /> <br />(32) .......................,........,'..",...,.............,.....,...,.",................... <br />2~ in. concrete floor slabv on metal lath, or 2 in. re- <br />inforced gypsum tile covered with ~ in. mortar, on <br />joists. Ceiling of 1 in. unsanded wood-fibered gyp- <br />sum plaster, or ~ in. gypsum-vermiculite plaster pro- <br />portioned within the range of 3~ to 5~ cu. ft. ver- <br />miculite per 100 lb. gypsum, on metal lath. (9) _"...... <br />2~ in. reinforced gypsum concrete on ~ in. gypsum <br />plaster board on joists. or 2~ in. cinder concrete on <br />metal floor lath on joists. Ceiling of 2 in. .pre- <br />cast, reinforced gypsum ceiling tile suspended ~ in. <br />below 1 in. furring channels in turn suspended ~ in. <br />below joists; gypsum ceiling tile corrugated on under <br />surface for effective plaster bond; all joints grouted <br />with gypsum; ceiling finished with ~ in. 1:1 gypsum <br />and sand plaster. ( 17) ........._.......................................... <br />2~ in. reinforced gypsum concrete on ~ in. gypsum <br />plaster board on joists. Ceiling of 2~ in. reinforced <br />gypsum concrete attached to bottoms of joists, plas- <br />tered with ~ in. gypsum and sand plaster; reinforce- <br />ment 1 in. above bottom of ceiling slab. (18) ."....,...:.. <br />2 in. precast, reinforced gypsum slabs on joists; joints <br />grouted with gypsum. Ceiling of 2 in. precast, rein- <br />forced gypsum attached to bottoms of joists; joints <br />grouted with gypsum; plastered with ~ in. gypsum <br />. t t. ,,,^, <br />ana sana pICLsu:r. \~VJ <br /> <br />e <br /> <br />e <br /> <br />AND PARTITIONS-Continued <br /> <br />FIRE RESISTANCE ITINGS <br />